0776822 CABLE ASSEMBLY, 16 ft. (4.9m) EVINRUDE
B10EL4AAA, B10EL4AAB, B10EL4INS, B10PL4AAA, B10PL4AAB, B10PL4INS, B10PX4INS, B10R4AAA, B10R4AAB, B10R4INS, B10RL4INS, B10TEL4AAA, B10TEL4INS, B10TPL4AAA, B10TPL4AAB, B10TPL4INS, B10TPX4INS, B15PL4AAA, B15PL4INS, B15R4AAA, B15R4AAB, B15R4INS, B15RL4IN
CABLE
Price: query
Rating:
Compatible models:
B10EL4AAA
B10EL4AAB
B10EL4INS
B10PL4AAA
B10PL4AAB
B10PL4INS
B10PX4INS
B10R4AAA
B10R4AAB
B10R4INS
B10RL4INS
B10TEL4AAA
B10TEL4INS
B10TPL4AAA
B10TPL4AAB
B10TPL4INS
B10TPX4INS
B15PL4AAA
B15PL4INS
B15R4AAA
B15R4AAB
B15R4INS
B15RL4INS
B15TE4INS
E10EL4AAB
E10EL4INS
E10PL4INS
E10TEL4AAB
E15PL4INS
E15R4INS
EVINRUDE
BRP EVINRUDE entire parts catalog list:
- CONTROL CABLES - UNIVERSAL - 3300 TYPE » 0776822
B10EL4INS 2012
B10PL4AAA, B10PX4AAA, E10PL4AAA, E10PX4AAA 2012
B10PL4AAB, B10PX4AAB, E10PL4AAB, E10PX4AAB 2012
B10PL4INS 2012
B10PX4INS, E10PX4INS 2012
B10R4AAA, B10RL4AAA, E10R4AAA, E10RL4AAA 2012
B10R4AAB, B10RL4AAB, B10TEL4AAB, E10R4AAB, E10RL4AAB 2012
B10R4INS, E10R4INS 2012
B10RL4INS, E10RL4INS 2012
B10TEL4AAA, E10TEL4AAA 2012
B10TEL4INS, E10TEL4INS 2012
B10TPL4AAA, B10TPX4AAA, E10TPL4AAA, E10TPX4AAA 2012
B10TPL4AAB, B10TPX4AAB, E10TPL4AAB, E10TPX4AAB 2012
B10TPL4INS, E10TPL4INS 2012
B10TPX4INS, E10TPX4INS 2012
B15PL4AAA, B15PL4AAB, E15PL4AAA, E15PL4AAB 2012
B15PL4INS 2012
B15R4AAA, B15RL4AAA, E15R4AAA, E15RL4AAA 2012
B15R4AAB, B15RL4AAB, B15TE4AAA, B15TE4AAB, B15TEL4AAA, B15TEL4AAB, E15R4AAB, E15RL4AAB, E15TE4AAA, E15TE4AAB, E15TEL4AAA, E15TEL4AAB 2012
B15R4INS, E15RL4INS 2012
B15RL4INS, B15TEL4INS, E15TE4INS, E15TEL4INS 2012
B15TE4INS 2012
E10EL4AAB 2012
E10EL4INS 2012
E10PL4INS 2012
E10TEL4AAB 2012
E15PL4INS 2012
E15R4INS 2012
Information:
1. Remove bolts (2) that hold the oil pan base to the cylinder block. Remove the inspection covers from the side of the block.2. Loosen connecting rod bolts (1) from the side opposite the way the block will be turned. This will permit easier removal of bolts after block is turned in the horizontal position. 3. Install a hoist to the engine lifting eyes. Put two nylon straps (3) through block and install a 1 1/2" steel bar (4). The bar must be as long as the cylinder block. With the engine off the floor, lift the lift truck and lower the hoist until engine is in position as shown. Install wooden blocks.
Use care not to hit the floor while the engine is turned.
4. Install a 1"-14 NF bolt (6) in each end of crankshaft. Install a hoist and straps on bolts.5. Remove rod caps and fasten rods in position with bolts and wire.6. Remove main bearing caps (5) and bearings. Install rubber hose (7) on studs to prevent machined surface damage. 7. Lower the crankshaft with a hoist. Weight of crankshaft for D379 is 650 lb. (295 kg); D398 is 890 lb. (404 kg); D399 is 1100 lb. (499 kg).Install Crankshaft
1. Fasten hoists and put crankshaft (1) in position in the cylinder block.2. Install new upper halves (with oil holes) of main bearings in cylinder block. Put clean engine oil on all bearings.3. Lift the crankshaft into position in the cylinder block. Remove hose (2) from threads of studs. When the bearing clearance is checked and the engine is in a vertical position, such as in the vehicle, the crankshaft will have to be lifted up and held against the upper halves of the main bearings to get a correct measurement with Plastigage (A). The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, such as on an engine stand, it is not necessary to hold the crankshaft up. Do not turn crankshaft when Plastigage is in position to check clearance.4. Put new bearings (3) in main bearings caps. Use Plastigage to check bearing clearance. Install caps and tighten both nuts to a torque of 200 10 lb. ft. (270 14 N m). Put a mark on the nuts and end of studs. Tighten nuts an extra 120° from the mark. Remove caps and check width of Plastigage to find bearing clearance. Bearing clearance must be .0048 to .0090 in. (0.122 to 0.229 mm) for new parts. Maximum permissible clearance for used parts is .015 in. (0.38 mm). Main bearing caps have numbers to identify their location in cylinder block. Install bearing caps so the number on cap is the same as number on cylinder block. Both numbers must be on same side of cylinder block. 5. Put clean engine oil on threads of studs and seat for nut. Install main bearing caps (4) and nuts. Install the thrust plates on dowel on rear cap. The dowels must not be extended more than .160 in. (4.06 mm) from counterbore face of bearing cap. Tighten the nuts to a torque of 200 10 lb.ft. (270 14 N m). Put a mark on nuts and ends of studs and tighten nuts an extra 120° from mark. 6. Put the upper half of new rod bearings (5) in the rod. Put rod in position on the crankshaft. 7. Install lower half of new rod bearings (6) in caps (7). Put clean engine oil on bearings. Be sure the tabs on back of bearing fits in tab grooves of cap and on connecting rod. Install the bearing caps and bolts. Tighten the bolts first to a torque of 40 4 lb.ft. (55 5 N m). Put a mark on bolt heads and bearing caps. Tighten bolts again 120° from mark. Only four bolts can be tightened in this way. The remainder of the bolts must be tightened with the engine in the vertical position. 8. Use tool group (B) to check crankshaft end play as controlled by thrust plates. End play must be .005 to .021 in. (0.13 to 0.53 mm). Maximum permissible end play is .035 in. (0.89 mm). 9. Install bar and straps to lift truck. Install hoist and turn engine to the vertical position.10. Install engine on the oil pan base. Tighten remainder of rod bolts as given in note above.11. Install the inspection covers on each side of engine.end by:a) install intake manifoldsb) install accessory drive gears and platec) install rear timing gearsd) install fuel injection lines
Use care not to hit the floor while the engine is turned.
4. Install a 1"-14 NF bolt (6) in each end of crankshaft. Install a hoist and straps on bolts.5. Remove rod caps and fasten rods in position with bolts and wire.6. Remove main bearing caps (5) and bearings. Install rubber hose (7) on studs to prevent machined surface damage. 7. Lower the crankshaft with a hoist. Weight of crankshaft for D379 is 650 lb. (295 kg); D398 is 890 lb. (404 kg); D399 is 1100 lb. (499 kg).Install Crankshaft
1. Fasten hoists and put crankshaft (1) in position in the cylinder block.2. Install new upper halves (with oil holes) of main bearings in cylinder block. Put clean engine oil on all bearings.3. Lift the crankshaft into position in the cylinder block. Remove hose (2) from threads of studs. When the bearing clearance is checked and the engine is in a vertical position, such as in the vehicle, the crankshaft will have to be lifted up and held against the upper halves of the main bearings to get a correct measurement with Plastigage (A). The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, such as on an engine stand, it is not necessary to hold the crankshaft up. Do not turn crankshaft when Plastigage is in position to check clearance.4. Put new bearings (3) in main bearings caps. Use Plastigage to check bearing clearance. Install caps and tighten both nuts to a torque of 200 10 lb. ft. (270 14 N m). Put a mark on the nuts and end of studs. Tighten nuts an extra 120° from the mark. Remove caps and check width of Plastigage to find bearing clearance. Bearing clearance must be .0048 to .0090 in. (0.122 to 0.229 mm) for new parts. Maximum permissible clearance for used parts is .015 in. (0.38 mm). Main bearing caps have numbers to identify their location in cylinder block. Install bearing caps so the number on cap is the same as number on cylinder block. Both numbers must be on same side of cylinder block. 5. Put clean engine oil on threads of studs and seat for nut. Install main bearing caps (4) and nuts. Install the thrust plates on dowel on rear cap. The dowels must not be extended more than .160 in. (4.06 mm) from counterbore face of bearing cap. Tighten the nuts to a torque of 200 10 lb.ft. (270 14 N m). Put a mark on nuts and ends of studs and tighten nuts an extra 120° from mark. 6. Put the upper half of new rod bearings (5) in the rod. Put rod in position on the crankshaft. 7. Install lower half of new rod bearings (6) in caps (7). Put clean engine oil on bearings. Be sure the tabs on back of bearing fits in tab grooves of cap and on connecting rod. Install the bearing caps and bolts. Tighten the bolts first to a torque of 40 4 lb.ft. (55 5 N m). Put a mark on bolt heads and bearing caps. Tighten bolts again 120° from mark. Only four bolts can be tightened in this way. The remainder of the bolts must be tightened with the engine in the vertical position. 8. Use tool group (B) to check crankshaft end play as controlled by thrust plates. End play must be .005 to .021 in. (0.13 to 0.53 mm). Maximum permissible end play is .035 in. (0.89 mm). 9. Install bar and straps to lift truck. Install hoist and turn engine to the vertical position.10. Install engine on the oil pan base. Tighten remainder of rod bolts as given in note above.11. Install the inspection covers on each side of engine.end by:a) install intake manifoldsb) install accessory drive gears and platec) install rear timing gearsd) install fuel injection lines
Parts cable EVINRUDE:
0176108
0176108 CABLE ASSEMBLY, 8 ft. (2.4m)
B10EL4AAA, B10EL4AAB, B10PL4AAA, B10PL4AAB, B10R4AAA, B10R4AAB, B10TEL4AAA, B10TPL4AAA, B10TPL4AAB, B15PL4AAA, B15R4AAA, B15R4AAB, E10EL4AAB, E10TEL4AAB
0176109
0176109 CABLE ASSEMBLY, 9 ft. (2.7m)
B10EL4AAA, B10EL4AAB, B10PL4AAA, B10PL4AAB, B10R4AAA, B10R4AAB, B10TEL4AAA, B10TPL4AAA, B10TPL4AAB, B15PL4AAA, B15R4AAA, B15R4AAB, E10EL4AAB, E10TEL4AAB
0176110
0176110 CABLE ASSEMBLY,10 ft. (3m)
B10EL4AAA, B10EL4AAB, B10PL4AAA, B10PL4AAB, B10R4AAA, B10R4AAB, B10TEL4AAA, B10TPL4AAA, B10TPL4AAB, B15PL4AAA, B15R4AAA, B15R4AAB, E10EL4AAB, E10TEL4AAB
0776816
0776816 CABLE ASSEMBLY,10 ft. (3m)
B10EL4AAA, B10EL4AAB, B10EL4INS, B10PL4AAA, B10PL4AAB, B10PL4INS, B10PX4INS, B10R4AAA, B10R4AAB, B10R4INS, B10RL4INS, B10TEL4AAA, B10TEL4INS, B10TPL4AAA, B10TPL4AAB, B10TPL4INS, B10TPX4INS, B15PL4AAA, B15PL4INS, B15R4AAA, B15R4AAB, B15R4INS, B15RL4IN
0776817
0776817 CABLE ASSEMBLY, 11 ft. (3.4m)
B10EL4AAA, B10EL4AAB, B10EL4INS, B10PL4AAA, B10PL4AAB, B10PL4INS, B10PX4INS, B10R4AAA, B10R4AAB, B10R4INS, B10RL4INS, B10TEL4AAA, B10TEL4INS, B10TPL4AAA, B10TPL4AAB, B10TPL4INS, B10TPX4INS, B15PL4AAA, B15PL4INS, B15R4AAA, B15R4AAB, B15R4INS, B15RL4IN
0776818
0776818 CABLE ASSEMBLY, 12 ft. (3.6m)
B10EL4AAA, B10EL4AAB, B10EL4INS, B10PL4AAA, B10PL4AAB, B10PL4INS, B10PX4INS, B10R4AAA, B10R4AAB, B10R4INS, B10RL4INS, B10TEL4AAA, B10TEL4INS, B10TPL4AAA, B10TPL4AAB, B10TPL4INS, B10TPX4INS, B15PL4AAA, B15PL4INS, B15R4AAA, B15R4AAB, B15R4INS, B15RL4IN
5040559
5040559 CABLE JOINT
B10EL4AAA, B10EL4AAB, B10EL4INS, B10PL4AAA, B10PL4AAB, B10PL4INS, B10PX4INS, B10R4AAA, B10R4INS, B10RL4INS, B10TEL4AAA, B10TEL4INS, B10TPL4AAA, B10TPL4INS, B10TPX4INS, B15PL4AAA, B15PL4INS, E10EL4AAB, E10EL4INS, E10PL4INS, E15PL4INS
5041159
5041159 CABLE JOINT
B10EL4AAA, B10EL4AAB, B10EL4INS, B10PL4AAA, B10PL4AAB, B10PL4INS, B10PX4INS, B10R4AAA, B10R4AAB, B10R4INS, B10RL4INS, B10TEL4AAA, B10TEL4INS, B10TPL4AAA, B10TPL4AAB, B10TPL4INS, B10TPX4INS, E10EL4AAB, E10EL4INS, E10PL4INS, E10TEL4AAB