0115217 EVINRUDE WATER TUBE


0115217 WATER TUBE EVINRUDE BE2REDE, BE2REUD, BE3ROEDE, BE3ROEUD, E2RECS, E2ROEOB, E2WREES, E2WRSIR, E2WRSSC, E3ROECS, E3ROEOB, E3ROSIA, E3ROSSR, E3WREES, E3WRSIR, E3WRSSC, HE2DRETC, HE3REIC, HE3RENR, HE3RETC WATER
0115217 WATER TUBE EVINRUDE
Rating:
23

Buy WATER TUBE 0115217 EVINRUDE genuine, new aftermarket parts with delivery

You can buy parts:

As an associate, we earn commssions on qualifying purchases through the links below
$50.95

26-12-2024

US: BEYZA OZ STORE
Suitable replacement part for 0115-217 Parking Brake Actuator T3StoM41304
Generic Precision Engineering: Meticulously engineered for precision fit and optimal performance in automotive, marine, and industrial applications. || Rust-Resistant Coating: Specially treated with a rust-resistant coating to enhance durability and extend product lifespan. || Universal Fit: Designed with universal compatibility, ensuring they work seamlessly with a wide range of vehicles and machinery. || Enhanced Safety: Built to meet or exceed safety standards, providing reliable protection and performance under extreme conditions. || Cost-Effective Solution: Offers a high-quality alternative to OEM parts, delivering excellent value without compromising on performance.
Number on catalog scheme: 29
 

BRP EVINRUDE entire parts catalog list:

BE2REDE, E2ROEDE, HE2REDE, HE2RSA, SE2REDE 1996
BE2REUD, E2ROEUD, HE2REUD, HE2RSK 1997
BE3ROEDE, E3ROEDE, HE3ROEDE, HE3RSA, SE3ROEDE 1996
BE3ROEUD, E3ROEUD, HE3ROEUD, HE3RSK, SE3ROEUD 1997
E2RECS, E2RSS 1998
E2ROEOB 1995
E2WREES 1999
E2WRSIR 2001
E2WRSSC 2000
E3ROECS, E3ROLECS, E3RSS 1998
E3ROEOB 1995
E3ROSIA 2001
E3ROSSR 2000
E3WREES 1999
E3WRSIR 2001
E3WRSSC 2000
HE2DRERM, HE2DRETC 1993,1994
HE3REIC 1991
HE3RENR 1992
HE3RERM, HE3RETC 1993,1994

Information:

start by: a) remove fuel injection nozzles Do not disassemble any nozzle until testing has shown that disassembly is needed. Check each nozzle with tool (A) for leakage, opening pressure, and the shape and amount of fuel (spray pattern) coming out of the nozzle. Do not clean or make an adjustment to any nozzle that has a large (excessive) amount of return leakage. Excessive return leakage can be an indication of nozzle failures that can not be corrected with an adjustment or cleaning and can cause engine damage. See TESTING 9L7883 FUEL INJECTION NOZZLES in TESTING AND ADJUSTING.
Keep the work area and all tools extra clean. Be careful not to cause damage to the parts during disassembly and assembly of the nozzles.
1. Put the nozzle in tool (B). Put tool (B) and the nozzle in a vise. Do not put any part of a nozzle directly in a vise. Loosen locknut (1). 2. Loosen adjusting screw (2) approximately three turns. Loosen pressure screw (3). 3. While holding the nozzle in one hand, tilt the nozzle and remove the pressure adjusting screw and locknut, shims, spring, seat, and valve. 4. If the valve does not slide out of the nozzle, install tool (C) and remove valve as follows: a) Push valve into nozzle with tool (C) until valve is against bottom of nozzle.b) Push down on body of tool (C) to engage collet on valve with tool (C).c) Turn nut counterclockwise and remove valve from the nozzle body.5. Put the parts in solvent to loosen carbon and deposits of foreign material. The body is assembled with an epoxy material and must not be in contact with the solvent for more than one to two hours. See SPECIAL INSTRUCTION FORM NO. FM055225 for the correct method of cleaning the nozzle.Assemble Fuel Injection Nozzles (9L7883 Nozzles)
Make sure all of the parts have been thoroughly cleaned before assembling the nozzles. Flush the body to remove any debris or lapping compound.1. Put clean fuel on all of the parts. 2. Put valve (1) in position in the body as shown.3. Install adjusting screw (7) into pressure screw (5). Turn the adjusting screw two or three turns and install locknut (6). Do not tighten the locknut.4. Put shims (4), spring (3), and seat (2) in position on the adjusting screw. The thicker shim of shims (4) must be against the screw.5. Put seat (2) in contact with the valve and push the valve into position in the body. Tighten the pressure screw by hand. 6. Put the nozzle in position in tool (A). Put tool (A) and the nozzle in a vise. Tighten the pressure screw to a torque of 70 to 80 lb.in. (80.7 to 92.2 cm.kg).7. Check the opening pressure of the nozzle as controlled by shims (4) with tool (B). See TESTING 9L7883 FUEL INJECTION NOZZLES, OPENING PRESSURE TEST in TESTING AND ADJUSTING.8. Check the valve lift adjustment as controlled by adjusting screw (7) with tool (B). See TESTING 9L7883 FUEL INJECTION NOZZLES, VALVE LIFT ADJUSTMENT in TESTING AND ADJUSTING. 9. Hold the adjusting screw with a screwdriver and tighten the locknut until the adjusting screw will not turn.10. Tighten the locknut to a torque of 35 to 45 lb.in. (40.4 to 51.9 cm.kg).end by: a) install fuel injection nozzles


Parts water EVINRUDE:

0114832
WATER PUMP REPAIR KIT
0114832 WATER PUMP REPAIR KIT
BE2REDE, BE2REUD, BE3ROEDE, BE3ROEUD, E2RECS, E2ROEOB, E2WREES, E2WRSIR, E2WRSSC, E3ROECS, E3ROEOB, E3ROSIA, E3ROSSR, E3WREES, E3WRSIR, E3WRSSC, HE2DRETC, HE3REIC, HE3RENR, HE3RETC
0115446
 
0115446 WATER TUBE, Long
E2RECS, E2WREES, E2WRSIR, E3ROECS, E3ROSIA, E3ROSSR, E3WREES, E3WRSIR
0451599
 
0451599 *WATER PUMP HOUSING
E2WRSIR, E3ROSIA, E3WRSIR
Back to top