0282218 JOHNSON ENGINE COVER ASSY., 90


0282218 ENGINE COVER ASSY., 90 JOHNSON J115MLCRD, J140TLCRD, J90MLCRD ENGINE
0282218 ENGINE COVER ASSY., 90 JOHNSON
Rating:
18

Buy ENGINE COVER ASSY., 90 0282218 JOHNSON genuine, new aftermarket parts with delivery
Number on catalog scheme: 28221
 

Compatible models:

BRP JOHNSON entire parts catalog list:

J115MLCRD, J115TLCRD, J115TXCRD 1984
J140TLCRD, J140TXCRD 1984
J90MLCRD, J90TLCRD, J90TXCRD 1984

Information:

Introduction
Do not perform any procedure that is outlined in this publication until you understand the information that is contained in this document.Commissioning Procedure for the Cooling System
During the commissioning procedure of Keel coolers, properly flush the entire system with fresh clean water that is not recirculated before the system is connected to the engine.Flushing the Cooling System
During the flushing procedure, the water pressure within the system should not exceed 172 kPa (25 psi).
The minimum flow that is required for the flush procedure is 379 L/min (100 US gpm).
During the flushing procedure, the flow must not exceed 492 L/min (130 US gpm).
The system must be flushed in both directions for a minimum of 30 minutes in order to clear all debris from the system completely.After the system is flushed, the system must be filled and the system must be maintained with the proper chemical requirements. The quality of the water must also be maintained. Refer to Operation and Maintenance Manual, SEBU6251, "Caterpillar Commercial Diesel Engine Fluids Recommendations".Perform this process for each circuit.Coolant Analysis
Obtaining a Representative Coolant Sample
Illustration 1 g02150831
Top view of Tier 1 engine (1) Location of the coolant sample port of the auxiliary circuit
Illustration 2 g02150956
Top view of Tier 2 engine (1) Location of the coolant sample port for the jacket water
Illustration 3 g02150937
Right side view of Tier 1 engine (2) Location of the coolant sample port for the jacket water
Illustration 4 g02150974
Right side view of Tier 2 engine (2) Location of the coolant sample port of the auxiliary circuit
A sampling valve must be in a full flow circuit for the jacket water and the auxiliary cooling system. These valves will allow an accurate, representative coolant sample. Refer to Illustration 1 through Illustration 4 for locations for proper sampling.
The following parts are required to install a sampling port for the auxiliary circuit (1). The sampling port of the auxiliary circuit is not installed at the factory.
154-9023 Valve
3J-7354 O-Ring Seal
157-0670 Dust Cap
5R-5304 Adapter (Tier 1 engines only)
The engine must run for a minimum of 1 hour. The engine must be at the normal operating temperature before the coolant sample is obtained.
While the engine is running, use 169-8373 Fluid Sampling Bottle and 162-8873 Holder . Connect the holder to the sampling valve in order to obtain a fluid sample. Use a clean kit for each sample.
Illustration 5 g02137769
(A) Clean fluid sample (B) Contaminated fluid sample
The coolant must meet Caterpillar standards for cleanliness, quality of water, and corrosion protection as determined by a Level 2 S O S analysis. The fluid sample must be free and clear of settled solids when the sample is viewed by the naked eye. Also, the fluid sample must be free and clear of suspended solids when the sample is viewed by the naked eye. Refer to Illustration 5 for examples of fluid samples.
If the fluid sample contains solids or the sample fails the Level 2 S O S analysis, then the steps that are outlined below must be taken in order to restore the coolant to the correct chemistry and criteria of cleanliness.Remedial Steps
Flush the system in order to remove any debris from the system. See ""Flushing the Cooling System"" above.
Add a supplemental coolant additive or a glycol base coolant in order to restore the chemical requirement. Refer to Operation and Maintenance Manual, SEBU6251, "Caterpillar Commercial Diesel Engine Fluids Recommendations".
The coolant must be sampled at 250 hour intervals. The coolant sample must meet the standards of a Level 2 S O S analysis until the proper chemistry is maintained. Maintain an ongoing program in order to sample the coolant at a Level 1 S O S analysis and a Level 2 S O S analysis that is outlined in the maintenance interval schedule.


Parts engine JOHNSON:

0394336
 
0394336 ENGINE COVER, Lower
J100WMLCOC, J115MLCOS, J115MLCRD, J140TLCRD, J90MLCOS, J90MLCRD
0282219
 
0282219 ENGINE COVER ASSY.,115
J115MLCRD, J140TLCRD, J90MLCRD
0282220
 
0282220 ENGINE COVER ASSY., 140
J115MLCRD, J140TLCRD, J90MLCRD
0393881
 
0393881 ENGINE COVER ASSY., 115
J115MLCRD, J140TLCRD, J90MLCRD
0393880
 
0393880 ENGINE COVER ASSY., 90
J115MLCRD, J140TLCRD, J90MLCRD
0393882
 
0393882 ENGINE COVER ASSY., 140
J115MLCRD, J140TLCRD, J90MLCRD
Back to top