811228 Mariner CYLINDER KIT


811228 CYLINDER KIT Mariner 70404119D, 7050302ED, 7050412YD, 7060412ET CYLINDER
811228 CYLINDER KIT Mariner
Rating:
88

Buy CYLINDER KIT 811228 Mariner genuine, new aftermarket parts with delivery

You can buy parts:

As an associate, we earn commssions on qualifying purchases through the links below
$89.48
 

08-08-2023
0.2[0.09] Pounds
-: -
New Vertex Gasket Kit with Oil Seals Compatible with/Replacement for Honda CTX 200 02 03 04 05 06 07 08 09 10 11 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Includes every gasket O-ring and seal required to rebuild an engine. || Includes formed rubber valve cover gaskets. || Does not include mechanical water pump seal.
Number on catalog scheme: 6
 

Compatible models:

Information:

1. Remove bolts (1) and water pump elbow (2). 2. Remove six bolts (3) and retainer (4). 3. Remove bearing (5) from retainer (4). 4. Remove oil pump drive gear (6) from the accessory drive housing. 5. Fasten a hoist to the oil pump. Remove bolt (9). Remove six bolts (8) that fasten the oil pump to the accessory drive housing. Remove oil pump (7). The weight of the oil pump is 110 lb. (49.5 kg).Install Oil Pump
1. Install a new gasket (1) between oil pump (2) and accessory drive housing. Inspect and make a replacement of O-ring seal (3) if necessary. Fasten a hoist to the oil pump and put it in position on the accessory drive housing. Install bolts to hold pump in position. 2. Install oil pump drive gear (4) in the accessory drive housing. 3. Use a press and tooling (A) to install bearing (5) in retainer (6). 4. Install a new gasket (7) between the accessory drive housing and retainer (6). Install the retainer with six bolts. 5. Install a new gasket (8) and water pump elbow (9) in position and install eight bolts.end by:a) install magnetob) install oil pressure relief valve (if equipped)Disassemble Oil Pump
start by:a) remove oil pump 1. Bend the tabs on two locks and remove bolts and locks (1) and retainer (2) from manifold. 2. Remove bearing (3) from retainer. 3. Remove bolts (4), pipe (6) and cover assembly (5) from pump assembly. 4. Put cover assembly in vise and install tooling (A) on gear (7) and remove gear from shaft assembly. Remove shaft assembly from cover. 5. Remove bearing (8) from cover. 6. Remove bolt (10) and washer (9) from shaft assembly. 7. Install tool (B) on gear and remove gear (11) from shaft. Remove key. 8. Remove nine bolts (12) and housing assembly (13) from pump. 9. Remove bearings (14) and (15) from housing. 10. Remove manifold assembly (18) from manifold assembly (19). Remove seals (17) from each side of manifold assembly (18).11. Remove two gears (16) from shaft. 12. Remove two bearings (20) from gears (16). 13. Remove shaft assembly (21) from manifold assembly (19). 14. Use a press to remove shaft (22) from gear (23). Remove key from shaft. 15. Remove two shafts (25) from the manifold with tooling (C) as shown. Remove bearing (24) from manifold.Assemble Oil Pump
1. Lower the temperature of two shafts (1) and install in manifold. Install the bearing in the manifold (2) with tooling (A). The installed bearing must be .030 in. (0.76 mm) below the machined surface of the manifold. 2. Lower the temperature of shaft (3). Install the key in the shaft and install the shaft in gear (4) with a press until the gear makes contact with the shoulder on the shaft. 3. Put a thin layer of SAE 30 oil on the shaft assembly and bearing. Install shaft assembly (5) in manifold (2). 4. Install two bearings in each gear (6) with tooling (A) and press. Install the bearings until they are even with the surface of the gear.5. Put a thin layer of SAE 30 oil on gears (6). Install the two gears on manifold shafts. 6. Install two O-rings (8) on manifold. Install manifold (7) on manifold (2). 7. Install two bearings in housing with tooling (A). Make an alignment of the oil hole in bearing (9) with the oil hole in housing. Install larger bearing even with housing surface. 8. Put housing assembly (10) in position on oil pump and install nine bolts. 9. Put key in shaft assembly and install gear (11). Put 9S3263 Thread Lock on the thread of bolt. Install washer and bolt. Tighten bolt to a torque of 18 2 lb.ft. (24 3 N m). 10. Install bearing in cover (12) with tool (A). Bearing is installed even with the edge of cover. 11. Heat gear (13) to a temperature of 275°F (135°C). Install shaft assembly in cover. Use a press and tool (A) to install shaft assembly on gear (13). Install shaft assembly until shaft shoulder is even with the edge of gear. 12. Inspect cover gasket (14) and make a replacement if necessary.13. Install gasket (14) and cover (12) on the oil pump. 14. Use tooling (A) and a press to install bearing (15) in retainer (16). 15. Put retainer assembly (17) in position on manifold and install two locks and five bolts. 16. Install pipe (18) on oil pump.end by:a) install oil pump


Parts cylinder Mariner:

813428
 
813428 CYLINDER END CAP ASSEMBLY
70404119D, 7050302ED, 7050412YD, 7050717, 7060312PC, 7060412ET, 7075217CD, 7075312SD, 7100412CD, 7100412NC
810777
CYLINDER KIT
810777 CYLINDER KIT
70404119D, 7050412YD, 7050717, 7060312PC, 7060412ET
813432A 2
 
813432A 2 CYLINDER REBUILD KIT
70404119D, 7050302ED, 7050412YD, 7060412ET
811224 1
 
811224 1 CYLINDER KIT
70404119D, 7050302ED, 7060412ET
811224A 1
 
811224A 1 CYLINDER ASSEMBLY
70404119D, 7050302ED, 7050412YD, 7055207GD, 7055207HB, 7055207TF, 7060412ET, 7A30302LB, 7A40302UD, 7A40312UZ, 7A41452IZ, 7A51412ZZ, 7A51452IZ, 7A60412ZZ, 7A60452IZ, 7E41412ZB, 7E51412ZB, 7E51413VZ, 7E60412ZB, 7E60413VZ, 7E60452IZ, 7E60452ZB, 7F30203H
813432A 3
 
813432A 3 CYLINDER REBUILD KIT
70404119D, 7050302ED, 7050412YD, 7060412ET, 7075217CD, 7100412CD
811228A 1
 
811228A 1 CYLINDER ASSEMBLY
70404119D, 7050302ED, 7055207GD, 7055207HB, 7055207TF, 7060412ET, 7A30302LB, 7A40302UD, 7A40312UZ, 7A41412LB, 7A41452UZ, 7A60412ZZ, 7A60452IZ, 7E60452ZB, 7F30203HD, 7F30203LB, 7F40452KD, 7F40452LB, 7F41452KB, 7F41452KD, 7F50352HD, 7F50412DD
Back to top