805323 Mercruiser VENT TUBE


805323 VENT TUBE Mercruiser 442B110GD, 442B115KD VENT
805323 VENT TUBE Mercruiser
Rating:
98

Buy VENT TUBE 805323 Mercruiser genuine, new aftermarket parts with delivery

You can buy parts:

As an associate, we earn commssions on qualifying purchases through the links below
$84.98
 

07-10-2017

Arc Remanu: Arc Remanufacturing
ARC 80-5323 Drive Shaft
CV threads and splines renewed 100% for perfect installation and fit||Center shafts are tested for run-out to insure full radius straightness and replaced when necessary.||Essential hardware including dust shields, slingers and nuts are replaced with new OEM quality parts as required
Number on catalog scheme: 5
 

Compatible models:

442B110GD   442B115KD   Mercruiser

Mercruiser entire parts catalog list:

442B110GD 1994,1995,1996,1998
442B115KD 1997

Information:

1. Remove six bolts (1) and washers from rocker shaft assembly.2. Remove rocker shaft assembly (2) from the cylinder head.3. Remove push rods (4) from engine.4. Loosen adjusting screws (3) on the rocker arms for valve clearance. This will prevent a bent valve or push rod at installation. The following steps are for the installation of the rocker shafts and push rods.5. Install push rods (4). The O-ring seal in the rear support must be installed new each time the bolt is removed from the rear support bracket.6. Put rocker shaft assembly (2) in position on cylinder head.
Make sure the dowels on each end of the rocker shaft assembly are in alignment with the holes in the cylinder head.
7. Put 2P2506 Thread Lubricant on the threads of all rocker shaft mounting bolts except bolt (10). Install bolts in the rocker shaft assembly.8. Tighten the bolts for the rocker shaft as follows:
3306 Tightening Sequence
3304 Tightening Sequencea. Tighten all the bolts in number sequence to a torque of 155 N m (115 lb.ft.).b. Tighten all the bolts again in number sequence to a torque of 250 17 N m (185 13 lb.ft.).c. Last, tighten bolts again in number sequence (hand tighten only to a torque of 250 17 N m (185 13 lb.ft.).9. The assembled length of springs at both ends of rocker shaft must be 1.50 0.25 mm (.059 .010 in.). Remove or install washers behind springs to change the assembled length of the springs.10. Make adjustments until the intake valve clearance is .038 mm (.015 in.) and the exhaust valve clearance is 0.64 mm (.025 in.). See the topic, Valve Clearance Setting in Testing And Adjusting. Tighten the locknuts (2) for the adjusting screws (1) to a torque of 29 7 N m (21 5 lb.ft.).End By:a. install valve cover.Disassemble And Assemble Rocker Shaft
Start By:a. remove rocker shaft and push rods 1. Remove O-ring seal (1) from the rear support bracket. A replacement of the O-ring seal must be made each time the head bolt is removed from the rear support bracket. 2. Remove retainer ring (6), washer (5), spring (4) and washer (3) from each end of rocker shaft. Remove rocker arm (2). 3. Remove pin from rear support bracket with a hammer and punch. Remove rear support bracket (7) from shaft.4. Remove remainder of rocker arms, springs, washers and brackets.5. Remove plugs from each end of the shaft if necessary. The following steps are for the assembly of the rocker shaft. 6. Install rocker arms (2), brackets (8), washers (5) and springs (4) on the rocker shaft.7. Install rear support bracket (7) on rocker shaft. Make sure hole in rear support bracket is in alignment with hole in rocker shaft.8. Install pin (9) through bracket and shaft with a hammer.9. Pin (9) must extend 9.60 mm (.378 in.) above the bracket.10. Install O-ring seal (1) in the rear support bracket. Install rocker arm (2), washer, spring, washer and retainer ring on the rocker shaft.11. Install the plugs in each end of the rocker shaft if they were removed.End By:a. install rocker shaft and push rods


Parts vent Mercruiser:

801761166
 
801761166 VENT SCREW
40420001D, 428B116KD, 442B110GD, 442B115KD, 4A72040ND, 4C8204DLD, 4CJ2040ND
813280
VENT CAP
813280 VENT CAP
428B116KD, 442B110GD, 442B115KD, 4A72040ND
Back to top