12665 BRUSH SPRING KIT Mercury
1035207, 1045217, 1050312BC, 1070312BC, 1070717, 1075217PD, 10754120D, 1075524, 1090524, 1100312BD, 1100412PD, 1115525, 11354120D, 1135412GD, 1135726, 1150453BD, 1150453GD, 1150453JD, 1150625, 1150628, 1175412GD, 1175413LD, 1175626, 1200412GD, 120041
BRUSH
Price: query
Rating:
Compatible models:
Mercury entire parts catalog list:
- POWER TRIM PUMP » 12665
1050312BC 1988,1989,1990
1070312BC 1988,1989,1990
- POWER TRIM PUMP » 12665
- POWER TRIM PUMP » 12665
10754120D 1990,1991,1992,1993
- POWER TRIM PUMP » 12665
- POWER TRIM COMPONENTS, SINGLE RAM (0D252461 AND UP) » 12665
1090524 1984,1985,1986,1987,1988
1100312BD 1988,1989,1990,1991,1992,1993
- POWER TRIM PUMP » 12665
- POWER TRIM COMPONENTS(SINGLE RAM POWER TRIM) » 12665
1115525 1985
11354120D 1990,1991
1135412GD 1989
- POWER TRIM PUMP » 12665
1150453BD 1988
- POWER TRIM PUMP » 12665
- POWER TRIM PUMP » 12665
- POWER TRIM PUMP(USE WITH DESIGN I POWER TRIM PUMP) » 12665
- POWER TRIM PUMP » 12665
1150628 1978,1979,1980,1982,1983,1984,1985
1175412GD 1989
- POWER TRIM PUMP » 12665
- POWER TRIM PUMP » 12665
1200412GD 1989,1990
- POWER TRIM PUMP » 12665
- POWER TRIM PUMP » 12665
1220727 1987,1988
- POWER TRIM PUMP » 12665
Information:
Illustration 1 g01332964
Schematic for the fuel injection pump (31 pin MIC)
Illustration 2 g01332970
Schematic for the fuel injection pump (70 pin MIC)
Test Step 1. Check the Battery Voltage
Measure no-load battery voltage at the battery terminals. Expected Result:The battery voltage should be no less than 11.0 volts for a 12 volt system. The battery voltage should be no less than 22.0 volts for a 24 volt system.Results:
OK - Proceed to Test Step 2.
Not OK - The battery voltage is below normal.Repair: Recharge the batteries or replace the batteries. Use the electronic service tool to clear any logged diagnostic codes and then verify that the repairs have eliminated the fault. STOPTest Step 2. Inspect the Electrical Connectors and Wiring
Illustration 3 g01625524
Pin locations on the 31 pin MIC
(3) Fuel pump power control
(4) Fuel pump battery -
(8) Fuel pump battery +
Illustration 4 g01332968
Pin locations on the 70 pin MIC
(42) Fuel pump power control
(48) Fuel pump battery +
(58) Fuel pump battery -
Thoroughly inspect the following terminal connections on the P40 Fuel Injection Pump Connector:
P40:6 Pump Supply -
P40:7 Pump Supply +Refer to Troubleshooting, "Electrical Connectors - Inspect".
Inspect the terminals on the VLPM connector.
On applications that have a 31 pin MIC, thoroughly inspect the following terminal connections on the P20/J20 Machine Interface Connector.
P20: 3 Pump Power Control
P20: 4 Pump Supply -
P20: 8 Pump Supply +
On applications that have a 70 pin MIC, thoroughly inspect the following terminal connections on the P20/J20 Machine Interface Connector.
P20: 42 Pump Power Control
P20: 48 Pump Supply +
P20: 58 Pump Supply -
Perform a 45 N (10 lb) pull test on each of the wires in the 31 pin MIC that are associated with the following connections:
P20:3 Pump Power Control
P20:4 Pump Supply -
P20:8 Pump Supply +
Perform a 45 N (10 lb) pull test on each of the wires in the 70 pin MIC that are associated with the following connections:
P20:42 Pump Power Control
P20:48 Pump Supply +
P20:58 Pump Supply -
Check the ECM connector (Allen head screw) for the correct torque of 6.0 N m (55 lb in).
Check the harness and wiring for abrasions and for pinch points from the battery to VLPM and from the ECM and the fuel pump. Also, check the harness and wiring for abrasions and for pinch points from the keyswitch to the ECM. Expected Result:All connectors, pins, and sockets should be completely coupled and/or inserted. The harness and wiring should be free of corrosion, abrasion, and/or pinch points.Results:
OK - Proceed to Test Step 3.
Not OK - There is a fault in the wiring or connectors. Repair the wiring and/or connectors or replace the wiring and/or connectors. Verify that the repair has eliminated the fault. STOPTest Step 3. Check the Supply Voltage at the Fuel Injection Pump
Illustration 5 g01332966
Locations of the pins on the fuel injection pump connector P40.
(6) Pump Supply -
(7) Pump Supply +
Turn the keyswitch to the OFF position.
Disconnect the P40 connector from the fuel injection pump.
Turn the keyswitch to the ON position.
Measure the voltage between P40:7 Pump Supply + and P40:6 Pump Supply -. Expected Result:The measured voltage is between 11.0 VDC and 13.5 VDC for a 12 volt system and between 22.0 VDC and 27.0 VDC for a 24 volt system with no suspected intermittent faults.Results:
OK - The voltage is within the limits. Proceed to Test Step 4.
Not OK - The voltage is below the limits. Proceed to Test Step 5.Test Step 4. Check the Drop in the Supply Voltage at the Fuel Injection Pump
Illustration 6 g01332966
Pin locations on the fuel injection pump connector P40.
(6) Pump Supply -
(7) Pump Supply +
Illustration 7 g01332963
Test harness (31 PIN mic)
Parts brush Mercury:
1293A 1
1293A 1 BRUSH AND SPRING ASSEMBLY
1090528, 1115100, 1115503, 1115525, 1115528, 1135100, 1140528, 1150503, 1150538, 1150625, 1500100, 1650100, 1650502, 1650503, 1800100, 1850503
2941
2941 BRUSH SET, COMMUTATOR END PLATE
1035204, 1050200, 1060504, 1070500, 1080500, 1090520, 1090528, 1115100, 1115503, 1115520, 1115523, 1115525, 1115528, 1140520, 1140528, 1140629, 1150503, 1150538, 1150625
89487
8989
13506
13506 BRUSH CARD KIT
1035207, 1045217, 1050312BC, 1070312BC, 1070717, 10754120D, 1075524, 1090524, 1100312BD, 1115525, 11354120D, 1135412GD, 1135726, 1150453BD, 1150453GD, 1150453JD, 1150625, 1150628, 1175412GD, 1175413LD, 1175626, 1200412GD, 1200413GD, 1200628, 1220727
75384
75384 BRUSH/SPRING KIT
1031203PD, 1031203UB, 1031203UD, 1031207ZF, 1031312DB, 1035204, 1035207, 1040200, 10402139D, 1040213YL, 1041312UB, 10432037D, 1043203DD, 1043203VD, 1043213DD, 1043302DD, 1043411DD, 1043412DB, 1043412DD, 1045217, 1050200, 1050302DB, 1050302FB, 1050302
2521
2519