58975 Mercury CAM, SHIFT(SERIAL #2991679 AND UP)


58975 CAM, SHIFT(SERIAL #2991679 AND UP) Mercury 1020100, 1020202, 1020208, 1200203 CAM
58975 CAM, SHIFT(SERIAL #2991679 AND UP) Mercury
Rating:
18

Buy CAM, SHIFT(SERIAL #2991679 AND UP) 58975 Mercury genuine, new aftermarket parts with delivery
Number on catalog scheme: 50
 

Compatible models:

Mercury entire parts catalog list:

1020100 1970
1020202 1972
1020208 1978,1979,1980
1200203 1973,1974,1975,1976,1977

Information:

1. Install the camshaft bearings in the fuel injection pump housing with tool (C). Install the bearing in governor end of housing so the lubrication hole in the bearing is in alignment with lubrication hole in housing. Install the camshaft bearings even with outside ends of fuel injection pump housing.
Install the rack bearing in the governor end of the housing with the small holes in the bearing parallel to the vertical centerline in the pump.
2. Install the rack bearing in the governor end of the housing with tooling (F). Install the bearing so it will be .195 .005 in. (4.95 0.13 mm) lower than the face of the housing. Tooling (D) must be used to install the rack bearing in the accessory drive end of the housing. This will put the tab for the bearing in its correct position and install the bearing to the correct depth. 3. Put clean engine oil on camshaft. Install the camshaft in fuel injection pump housing. 4. Put the governor drive gear (1) and spring (2) in position on the camshaft. Install the camshaft plate (3), bolt and lock. 5. Install lifters (4) in their correct positions in the housing. Put clean engine oil on the rack. Install rack (5) in the fuel injection pump housing with the opening in the rack near the governor end of the housing.6. Install the spacers in their respective positions in the housing. When new lifters and pumps are installed, it is necessary to make adjustment of the fuel pump timing. See FUEL INJECTION PUMP TIMING DIMENSIONS SETTING, OFF ENGINE in TESTING AND ADJUSTING.7. Assemble the fuel injection pumps as follows: a) Put clean fuel oil on all parts.b) Install the spring on the barrel.c) Install the washer on the plunger and gear segment. Install the plunger in the barrel.d) Install the spring and check valve in the bonnet.e) Put the bonnet in position on the barrel and install the ring to hold the unit together.f) Install the seal on the bonnet.
Make sure the fuel rack is in the center (zero) position before the fuel injection pumps are installed.
8. Put the rack in the center position with tooling (E) as follows: a) Install location fixture (6) on the fuel injection pump housing.b) Install the gauge (7). Move the gauge (7) to zero. Push the rack (5) against the gauge.c) Install the clamp (8) on pump housing as illustrated. This will keep the rack in the center when the fuel injection pumps are installed. 9. With the rack in the center, install the fuel injection pumps as follows: a) Turn the camshaft until the lobe of the camshaft is down for the pump to be installed.b) Install tool (B) on the pump.c) Put the grooves (9) in the bonnet and barrel in alignment with the groove (10) in the pump gear segment. Put the pump in position so the grooves are in alignment with the guide pins in the housing bore. Install the pump in its correct position in the housing. d) Install bushing (11) over the bonnet. Install tool (B) on the bonnet and push down on tool (B). Tighten bushing (11) by hand until the bushing is even with top of housing. If installation of the bushing can not be made this far by hand, remove it. Remove the pump, put the parts in alignment again and install the bushing again. Tighten bushing (11) to a torque of 140 to 160 lb.ft. (190 219 N m).
If installation of pump is correct, the bushing can be tightened by hand until it is even with face of pump housing.
e) Make a check of the rack travel after each pump is installed as follows: Move clamp (8) away from the end of the rack. Use gauge (7) to measure the rack movement. The total rack movement must be .800 in. (20.32 mm). If the rack can not be moved this distance, the pump gear segment is not in the correct position and the pump must be removed and installed again. f) Remove tool (B) and tool (E). Install tool (A) and tighten the bushing to a torque of 150 10 lb.ft. (205 14 N m). Remove tool (A). Install the washers and protection caps for the fuel injection pumps.end by:a) connection of governor to fuel injection pump housingb) install fuel injection pump housing and governorc) adjust governor and set the rack (See GOVERNOR ADJUSTMENTS and FUEL RACK SETTING in TESTING AND ADJUSTING)


Parts cam Mercury:

39588
 
39588 CAM
1020100, 1020202, 1040100, 1040102
65216
 
65216 CAM, REVERSE LOCK
1005200, 1007208, 1007209, 1010208, 1020208, 1040102, 1045205, 1075202, 1075204, 1110102, 1110204, 1200203
61011
Back to top