897001T Mercury HUB, Rubber


897001T HUB, Rubber Mercury 1025207FL, 1025207FM, 1025217FL, 1025217FM, 1030201FL, 1030211FL, 1030271HL, 1030302FL, 1030312FL, 1030A01FL, 1030A11FL HUB
897001T HUB, Rubber Mercury
Rating:
83

Buy HUB, Rubber 897001T Mercury genuine, new aftermarket parts with delivery

You can buy parts:

As an associate, we earn commssions on qualifying purchases through the links below
$26.99
 

15-07-2021
0.50044933474[0.00] Pound
-: -
New Mercury Mercruiser Quicksilver Oem Part # 897001T Hub-Rubber
Number on catalog scheme: -
 

Mercury entire parts catalog list:

1025207FL 2006
1025207FM 2006
1025217FL 2006
1025217FM 2006,2010
1030201FL 2006
1030211FL 2006
1030271HL 2006
1030302FL 2006
1030312FL 2006
1030A01FL 2006
1030A11FL 2006

Information:

2. Remove sensor (7) from cylinder head (8). If necessary, remove the O-ring seal from sensor (7).3. Remove bolt and locknut (5).4. Disconnect connector (6).5. Remove bolt (4) and sensor (3). If necessary, remove the O-ring seal from sensor (3).6. Remove three bolts (2) and water lines group (1). 7. Remove bolt (9) from timing advance housing.8. Remove bolt (10) and support (11). 9. Remove the bolt and support (12). Remove the remaining ten bolts and the supports along the intake side of the cylinder head.10. Disconnect hose clamp (13) from the exhaust manifold. 11. Attach Tool (A) and fasten a hoist.12. Remove bolts (14) and remove the cylinder head. The weight of the cylinder head is approximately 172 kg (380 lb).13. Remove the head gasket and the water seals.
Do not put the cylinder head down on a flat surface. Direct injection nozzles extend out from the bottom surface of the cylinder head and will be damaged by the weight of the head.
Install Cylinder Head
1. Thoroughly clean the bottom surface of the cylinder head. Install a new head gasket and water seals. Do not use any adhesives. A new spacer plate gasket must be used when the cylinder head is installed. See the topic "Remove & Install Spacer Plate" in this module. 2. Attach Tool (D) and fasten a hoist.3. Install the cylinder head to the block. The weight of the cylinder head is approximately 172 kg (380 lb).
(1) Large bolts (3/4 inch). Put 6V-4876 Molycoat Paste Lubricant on bolt threads and between washer and underside of bolt heads. (2) Small bolts (3/8 inch). See Step 4h.4. Use the tightening sequence below to tighten the bolts that hold the cylinder head in position. a. Tighten bolts 1 through 14 in number sequence to 270 25 N m (200 20 lb ft).b. Tighten bolts 1 through 14 in number sequence to 470 20 N m (345 15 lb ft).c. Tighten bolts 1 through 14 in number sequence to 470 20 N m (345 15 lb ft).d. Install the rocker arm shafts for the engine valves and the remaining (3/4 in) bolts.e. Tighten bolts 15 through 26 in number sequence to 270 25 N m (200 20 lb ft).f. Tighten bolts 15 through 26 in number sequence to 450 20 N m (330 15 lb ft).g. Tighten bolts 15 through 26 in number sequence to 450 20 N m (330 15 lb ft).h. Tighten the thirteen small bolts (2) to a torque of 45 7 N m (33 5 lb ft). 5. Install support (12).6. Connect hose clamp (13) to exhaust manifold. 7. Install bolt (10) and support (11). Install the remaining ten bolts and the supports along the intake side of the cylinder head. Torque all twelve bolts (10) to 43 7 N m (32 5 lb ft).8. Install bolt (9) to timing advance housing. 9. Put the gasket in position. Install three bolts (2) and water lines group (1).10. If removed, install the O-ring seal to sensor (3). Install bolt (4) and sensor (3).11. Connect connector (6).12. Install bolt and locknut (5).13. If removed, install the O-ring seal to sensor (7). Install sensor (7) to cylinder head (8). 14. Install the two valve cover bases. Use the tightening sequence above and tighten the bolts to a torque of 14 4 N m (10 3 lb ft).15. Fill the cooling system with coolant to the correct level. See the Operation & Maintenance Manual.End By:a. install turbochargersb. install rocker shaft assemblies


Back to top