34826-87D00 Suzuki AIR TEMP SENSOR RESISTOR


34826-87D00 AIR TEMP SENSOR RESISTOR Suzuki DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR, AIR
34826-87D00 AIR TEMP SENSOR RESISTOR Suzuki
Rating:
13

Buy AIR TEMP SENSOR RESISTOR 34826-87D00 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 19
 

Suzuki entire parts catalog list:

DT150 1998,1999,2000,2001,2002,2003
DT150SSH 1987
DT150SSJ 1988
DT150SSK 1989
DT150SSL 1990
DT150SSM 1991
DT150SSN 1992
DT150STCLP 1993
DT150STCLR 1994
DT150STCLS 1995
DT150STCLT 1996
DT150TCLH 1987
DT150TCLJ 1988
DT150TCLK 1989
DT150TCLL 1990
DT150TCLM 1991
DT150TCLN 1992
DT150TCLP 1993
DT150TCLR 1994
DT150TCXGM 1991
DT150TCXGN 1992
DT150TCXGP 1993
DT150TCXGR 1994
DT150TCXGS 1995
DT150TCXGT 1996
DT150TCXH 1987
DT150TCXJ 1988
DT150TCXK 1989
DT150TCXL 1990
DT150TCXM 1991
DT150TCXN 1992
DT150TCXP 1993
DT150TCXR 1994
DT150TCXS 1995
DT150TCXT 1996
DT200 1998,1999,2000,2001,2002,2003
DT225 1998,1999,2000,2001,2002,2003

Information:

1. Turn the valve on the air reservoir to the "OPEN" position and remove (bleed) the air pressure from the system.2. Drain the coolant from the cooling system to a level below the air compressor. 3. Disconnect water lines (1) and (2) from the air compressor.4. Disconnect air lines (3) and (4). 5. Disconnect oil drain line (5). Remove three nuts (6). Remove air compressor (7) from the accessory drive.Install Air Compressor
1. Install a new gasket on the accessory drive. 2. Put a small amount of SAE 30 oil on the O-ring seal and install air compressor (1) on the accessory drive. 3. Connect water lines (2) and (3) to the air compressor.4. Connect air lines (4) and (5).5. Connect oil drain line (6).6. Fill the cooling system with coolant to the correct level. See LUBRICATION AND MAINTENANCE GUIDE.7. Turn the valve on the air reservoir to the "CLOSED" position.Disassemble Air Compressor
start by:a) remove air compressor 1. Remove elbow (1) and adapter. Remove the gasket, screen and gasket from behind the flange.2. Remove air compressor governor (2).3. Put a mark on the head assembly and block for correct assembly. 4. Remove six bolts (3). Remove head assembly (4). 5. Remove inlet valve springs (5) from the head assembly.6. Remove discharge valve seats (6). 7. Remove discharge valves (7). Remove springs from behind the valves. Check the discharge valve stops for wear or damage. If the discharge valve travel exceeds .057 in. (1.45 mm), make a replacement of the head assembly. 8. Remove inlet valves (8) from guides. Remove guides (9) from around the inlet valve seats. 9. Remove unloader spring (10), spring seat and spring saddle (12).10. Remove unloader plungers (11) and guides. 11. To remove unloader pistons (13) from the bore, put a cover over the inlet port, then blow air pressure in the governor mounting pad unloader port (14). 12. Check inlet valve seats (15) and unloader bore bushings (16) for damage or wear. If necessary, make a replacement. 13. Remove bolts (17). Remove cover (18) and gasket from the crankcase assembly.14. Put marks on the rod bearing caps and rods for correct assembly. 15. Remove bolts (19) and locks. Remove rod bearing caps (20). Push the pistons and rods through the top of the crankcase assembly. 16. Remove rod pin (21) from the piston. Remove rod (23).17. Remove bearings (22) from the rods and caps. 18. Use tooling (A) to remove bushing (24) from the rod. 19. Remove buttons (25) from each end of the rod pins. 20. Remove piston rings (26) from piston (27) with an approved ring expander. 21. Remove O-ring seal (29) from the crankshaft.22. Remove bolts (28). Remove adapter (30) from the crankcase assembly. 23. Remove three O-ring seals (32) from the adapter.24. Remove thrust bearing (31). 25. Use tooling (A) and a press to remove the bearing from the adapter.
Do not cause damage to the bearing surfaces of the crankshaft when it is removed from the crankcase assembly.
26. Remove crankshaft (33) from the crankcase assembly. 27. Remove bolts (34). Remove cover (35). Remove two O-ring seals from the crankcase assembly. 28. Remove O-ring seal (37) from the cover.29. Remove thrust bearing (36). 30. Remove bearing (38) from the cover.Assemble Air Compressor
1. Check all parts for damage or wear. If necessary, make a replacement with a new part.2. Make sure all parts are clean and free of dirt and foreign material. 3. Use tool (A) and a press to install the bearing in cover (1). 4. Install O-ring seal (3) on the cover.5. Install thrust bearing (2). 6. Install O-ring seals (4) in the crankcase assembly.7. Put a small amount of SAE 30 oil on the O-ring seal and install the cover on crankcase assembly (5). Tighten the bolts to a torque of 25 to 35 lb.ft. (35 to 45 N m). 8. Put crankshaft (6) in position in the crankcase assembly. 9. Use tool (A) and a press to install the bearing in adapter (7). 10. Install O-ring seal (9) on the adapter.11. Install thrust bearing (8). 12. Install O-ring seals (10) in the crankcase assembly.13. Put adapter (7) in position on the crankcase assembly. Install the bolts that hold it. Tighten the bolts to a torque of 38 to 45 lb.ft. (49 to 60 N m). 14. Use tooling (A) to install the bushings in the rods. Make sure the oil hole in the bushing is in alignment with the oil hole in the rod. The bushing inside diameter must be .5314 to .5317 in. (13.498 to 13.505 mm).15. Install buttons (14) in each end of the rod pins. 16. Put rod (13) in position in piston (11). Install rod pin (12) in the piston. 17. Install piston rings (15) and oil ring (16) on the pistons. Check all groove and ring gap clearance. The correct groove clearance for the piston rings is .002 to .004 in. (0.05 to 0.10 mm). The correct groove clearance for the oil ring is .001 to .003 in. (0.03 to 0.08 mm). The correct ring gap clearance is .002 to .010 in. (0.05 to 0.25 mm). 18. Install bearings (17) in the rods.19. Put clean SAE 30 oil on the piston rings and rod bearings. Turn the crankshaft so one of the rod journals is in the "DOWN" position. Install tool (B) on the piston to put compression on the piston rings. Install the rod in the crankcase assembly and over the crankshaft journals. 20. Install bearings (18) in the bearing caps.21. Check the clearance between the rod bearings and crankshaft journals with tool (C). Put the Plastigage on the cap bearing as shown. Install the bearing caps on their respective rods. Tighten the bolts to a torque of 100 to 115 lb.in. (11.3 to 13.0 N m).22. Remove the bearing caps and measure the Plastigage. The correct clearance is .0003 to


Parts air Suzuki:

61431-87D01-0ED
 
61431-87D01-0ED AIR INTAKE COVER
DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR,
61433-87D01
 
61433-87D01 AIR INTAKE INNER COVER
DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR,
69221-94700
 
69221-94700 AIR VENT
DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR,
Back to top