09263-22039 BEARING Suzuki
DF40, DF40, DF40A, DF40A, DF40QH, DF40TL, DF50, DF50, DF50A, DF50A, DF50QH, DF50TL, DF60A, DF60A, DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35TCLH, DT35TCLJ, DT35TCLK, DT
BEARING
Price: query
Rating:
You can buy parts:
As an associate, we earn commssions on qualifying purchases through the links below
DIWEIS 09263-22039 Needle Roller Bearing 09263-22039-000
Generic SPCC OUTER RING+GCR15 NEEDLE ROLLER
Generic SPCC OUTER RING+GCR15 NEEDLE ROLLER
$69.85
17-03-2022
-: -
09263-22039-000 Suzuki Bearing(22x30x30) 0926322039000
New OEM Suzuki Rn 22X30x30 Brg || OEM Part Number: 09263-22039 (QTY 1) | Previous: 09263-22033 || Item only fits specific models listed. The picture could be generic. || Message us with VIN/HULL for fast fitment verification.
New OEM Suzuki Rn 22X30x30 Brg || OEM Part Number: 09263-22039 (QTY 1) | Previous: 09263-22033 || Item only fits specific models listed. The picture could be generic. || Message us with VIN/HULL for fast fitment verification.
Compatible models:
Suzuki entire parts catalog list:
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- GEAR CASE » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- Gear Case » 09263-22039
- GEAR CASE » 09263-22039
Information:
Start By:a. remove valve covers Call out (1) and (2) are not used in this removal procedure. Call outs begin with number (3). 1. Remove bolts (3) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (4).
To prevent damage to the fuel injection nozzle, hold adapter assembly (5) in position at the end of the injection nozzle (6) when fuel line nut (7) is loosened or tightened.
2. Use Tool (A) and a 5P-0328 Crow Foot (7/8 in)to loosen the fuel injection line nut at the nozzle end. 3. Use Tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (8). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (9) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (10). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (11). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (12) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies & Push Rods 1102 & 1208-012
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (1) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb)straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20 to 30 degrees (1/3 to 1/2 of 1 hex on nut).This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position and tighten the locknut to a torque of 30 4 N m (22 3 lb ft). Install the original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (2). 4. Put rocker shaft assemblies (3) in position on the cylinder head assembly.5. Put clean engine oil on the threads of the bolts that hold the rocker shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb ft).Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb ft).Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb ft).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (4). Tighten the fuel injection line adapter nuts (5) to a torque of 40 7 N m (30 5 lb ft)with Tool (A).
Do not let the tops of the fuel nozzles turn when the fuel lines are tightened. The nozzles will be damaged if the top of the nozzles turns in the body.
7. Tighten fuel injection line nut (6) to a torque of 40 7 N m (30 5 lb ft)with Tool (B) and a 5P-0328 (7/8 in) Crow Foot wrench.8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in)and the exhaust valve clearance 0.76 mm (.030 in).See the topic "Valve Clearance Setting" in Systems Operation Testing & Adjusting Manual. Tighten the locknut to a torque of 30 4 N m (22 3 lb ft)and check the adjustments. 9. Install valve cover bases (7) on the cylinder head assembly. Install bolts that hold the valve cover bases in place. Tighten the bolts to a torque of 14 3 N m (10 2 lb ft).End By:a. install valve covers
To prevent damage to the fuel injection nozzle, hold adapter assembly (5) in position at the end of the injection nozzle (6) when fuel line nut (7) is loosened or tightened.
2. Use Tool (A) and a 5P-0328 Crow Foot (7/8 in)to loosen the fuel injection line nut at the nozzle end. 3. Use Tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (8). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (9) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (10). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (11). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (12) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies & Push Rods 1102 & 1208-012
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (1) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb)straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20 to 30 degrees (1/3 to 1/2 of 1 hex on nut).This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position and tighten the locknut to a torque of 30 4 N m (22 3 lb ft). Install the original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (2). 4. Put rocker shaft assemblies (3) in position on the cylinder head assembly.5. Put clean engine oil on the threads of the bolts that hold the rocker shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb ft).Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb ft).Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb ft).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (4). Tighten the fuel injection line adapter nuts (5) to a torque of 40 7 N m (30 5 lb ft)with Tool (A).
Do not let the tops of the fuel nozzles turn when the fuel lines are tightened. The nozzles will be damaged if the top of the nozzles turns in the body.
7. Tighten fuel injection line nut (6) to a torque of 40 7 N m (30 5 lb ft)with Tool (B) and a 5P-0328 (7/8 in) Crow Foot wrench.8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in)and the exhaust valve clearance 0.76 mm (.030 in).See the topic "Valve Clearance Setting" in Systems Operation Testing & Adjusting Manual. Tighten the locknut to a torque of 30 4 N m (22 3 lb ft)and check the adjustments. 9. Install valve cover bases (7) on the cylinder head assembly. Install bolts that hold the valve cover bases in place. Tighten the bolts to a torque of 14 3 N m (10 2 lb ft).End By:a. install valve covers
Parts bearing Suzuki:
09269-25014
09269-25014 Bearing, Thrust
DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35ELT, DT35ELX, DT35ELZ, DT35EST, DT35ESX, DT35ESZ, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35MLT, DT35MLX, DT35MLZ, DT35MST, DT35MSX, DT35MSZ, DT35TCLH, DT35TCLJ, DT
09263-20072
09263-20072 BEARING
DT40C, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG,
09263-27005
09263-27005 BEARING
DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35TCLH, DT35TCLJ, DT35TCLK, DT40C, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT
09269-30012
09269-30012 BEARING
DT40C, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG,
09262-35025
09262-35025 Bearing
DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35TCLH, DT35TCLJ, DT35TCLK
12181-87J00-0A0
12100-51810-0D0
12100-51810-0E0