56110-98520-0EP BEARING, REVERSE GEAR Suzuki
DT6
BEARING
Price: query
Rating:
Compatible models:
DT6
Suzuki
Suzuki entire parts catalog list:
- GEAR CASE » 56110-98520-0EP
Information:
1. Remove eight nuts (1). Remove cover (2) from the timing gear cover. 2. Remove bolts (3), and remove automatic timing advance (4). 3. Remove gear (5) from the front timing gear cover. The following steps are for the installation of the automatic timing advance. 4. Lubricate seals (6) with clean engine oil. 5. Put gear (5) in position in the front timing gear cover. 6. Install two 3/8" - 16 NC x 6 in. (152.4 mm) long guide bolts (7) in gear (5) as shown. 7. Install automatic timing advance (4) on the end of the fuel injection pump camshaft, and install bolts that hold it. Tighten bolts to a torque of 3 N m (27 lb.in.). 8. Put the No. 1 piston at top center on the compression stroke. Make reference to Finding Top Center Compression Position For No. 1 Piston in Testing And Adjusting. Remove the timing bolt from the flywheel, and use tool (A) to rotate the crankshaft clockwise (opposite the direction of engine rotation) 45°. 9. Remove plug (8) from the fuel injection pump housing. 10. Install tool (B) in the fuel injection pump housing as shown. Slowly rotate the crankshaft counterclockwise (direction of engine rotation) until the timing pin goes into the slot in the fuel injection pump camshaft.
Too much pressure on the timing pin can damage the fuel injection pump or the timing pin.
11. Put the timing bolt in the timing hole in the flywheel housing. Rotate the crankshaft counterclockwise (as seen from the flywheel end of the engine) until the fuel pump camshaft is tight against tool (B). This removes gear clearance from the drive train. If the bolt can be installed in the timing hole in the flywheel, the timing of the fuel injection pump is correct.12. If the timing bolt does not go into the timing hole in the flywheel, the timing is not correct. Do the steps that follow to adjust the fuel injection pump timing.a. Loosen four bolts (3). With tool (B) installed and the timing bolt removed, turn the flywheel clockwise (opposite the direction of engine rotation) a minimum of 45°. The reason for this step is to remove backlash from the timing gears when the engine is put on top center (TC).b. Tighten two bolts (3) 180° apart, evenly to a torque of 3 N m (27 lb.in.).c. Turn the flywheel slowly in the direction of engine rotation until the timing bolt can be installed in the flywheel. The No. 1 piston of the engine is now at top center (TC).d. Tighten four bolts (3) to a torque of 55 7 N m (41 5 lb.ft.). Remove the timing bolt from the flywheel and tool (B) from the fuel injection pump housing.13. Turn the flywheel clockwise (opposite the direction of normal engine rotation) a minimum of 45°. Now, turn the flywheel in the direction of engine rotation until tool (B) drops into slot of pump camshaft. Now, turn the flywheel more, in the direction of normal engine rotation, until all gear clearance is removed from the drive train. Check to see that the timing bolt will go into the flywheel.14. If the timing is not correct, do the procedures in Steps 12a through 12d again. 15. If the timing is correct, remove the timing bolt from the flywheel and the timing pin [tool (B)] from the fuel injection pump housing. Install cover (2) and the plug in fuel injection pump housing.Disassemble And Assemble Automatic Timing Advance (Later)
Start By:a. remove automatic timing advance (Later) 1. Remove seal (2) and seal (4) from the body.
Spring force is present behind carrier (3). Put downward pressure on carrier (3) when bolts (2) are removed.
2. Remove the bolts that hold
Too much pressure on the timing pin can damage the fuel injection pump or the timing pin.
11. Put the timing bolt in the timing hole in the flywheel housing. Rotate the crankshaft counterclockwise (as seen from the flywheel end of the engine) until the fuel pump camshaft is tight against tool (B). This removes gear clearance from the drive train. If the bolt can be installed in the timing hole in the flywheel, the timing of the fuel injection pump is correct.12. If the timing bolt does not go into the timing hole in the flywheel, the timing is not correct. Do the steps that follow to adjust the fuel injection pump timing.a. Loosen four bolts (3). With tool (B) installed and the timing bolt removed, turn the flywheel clockwise (opposite the direction of engine rotation) a minimum of 45°. The reason for this step is to remove backlash from the timing gears when the engine is put on top center (TC).b. Tighten two bolts (3) 180° apart, evenly to a torque of 3 N m (27 lb.in.).c. Turn the flywheel slowly in the direction of engine rotation until the timing bolt can be installed in the flywheel. The No. 1 piston of the engine is now at top center (TC).d. Tighten four bolts (3) to a torque of 55 7 N m (41 5 lb.ft.). Remove the timing bolt from the flywheel and tool (B) from the fuel injection pump housing.13. Turn the flywheel clockwise (opposite the direction of normal engine rotation) a minimum of 45°. Now, turn the flywheel in the direction of engine rotation until tool (B) drops into slot of pump camshaft. Now, turn the flywheel more, in the direction of normal engine rotation, until all gear clearance is removed from the drive train. Check to see that the timing bolt will go into the flywheel.14. If the timing is not correct, do the procedures in Steps 12a through 12d again. 15. If the timing is correct, remove the timing bolt from the flywheel and the timing pin [tool (B)] from the fuel injection pump housing. Install cover (2) and the plug in fuel injection pump housing.Disassemble And Assemble Automatic Timing Advance (Later)
Start By:a. remove automatic timing advance (Later) 1. Remove seal (2) and seal (4) from the body.
Spring force is present behind carrier (3). Put downward pressure on carrier (3) when bolts (2) are removed.
2. Remove the bolts that hold
Parts bearing Suzuki:
09263-14010
09263-14010 Bearing, Pinion Shaft
DT3.5LD, DT3.5LE, DT3.5LN, DT3.5LT, DT3.5LX, DT3.5LZ, DT3.5SD, DT3.5SE, DT3.5SN, DT3.5ST, DT3.5SX, DT3.5SZ, DT5LC, DT5LD, DT5LN, DT5LT, DT5LX, DT5LZ, DT5SC, DT5SD, DT5SN, DT5ST, DT5SX, DT5SZ, DT6, DT6LE, DT6LF, DT6SE, DT6SF, DT8LD, DT8LE, DT8LF, DT8L
09263-12023
09263-12023 BEARING
DT2.2SV, DT2D, DT2E, DT2F, DT2LG, DT2LH, DT2LJ, DT2LK, DT2LL, DT2SG, DT2SH, DT2SJ, DT2SK, DT2SL, DT2SM, DT2SN, DT2SP, DT2SR, DT2SS, DT2ST, DT4, DT4LF, DT4LG, DT4LH, DT4SF, DT4SG, DT4SH, DT5Y, DT5Y, DT6, DT8CENK, DT8CENL, DT8CLJ, DT8CLK, DT8CLL, DT8CL
09262-14001
09262-14001 Bearing
DT6, DT6LE, DT6LF, DT6SE, DT6SF, DT8LD, DT8LE, DT8LF, DT8LG, DT8LH, DT8SD, DT8SE, DT8SF, DT8SG, DT8SH
09263-15019
09263-15019 Bearing
DF15, DF15, DF15, DF15S, DF9.9, DF9.9R, DF9.9RL, DF9.9S, DF9.9TH, DF9.9TH, DF99R, DF99TH, DT15 MLE, DT15C, DT15ELD, DT15ELE, DT15ELF, DT15ELG, DT15ELH, DT15ELJ, DT15ESD, DT15ESE, DT15ESF, DT15ESG, DT15ESH, DT15ESJ, DT15MLD, DT15MLF, DT15MLG, DT15MLH,
09263-17022
09262-20069
09262-20069 BEARING
DT4, DT5Y, DT5Y, DT6, DT8CENK, DT8CENL, DT8CLJ, DT8CLK, DT8CLL, DT8CLM, DT8CNK, DT8CNL, DT8CSJ, DT8CSL, DT8CSM, DT8MCLN, DT8MCLP, DT8MCLS, DT8MCLT, DT8MCLV, DT8MCSN, DT8MCSP, DT8MCSR, DT8MCSS, DT8MCST, DT8MCSV, DT8MSLR, DT8SCK, DT9.9 CELK, DT9.9CELJ,
55110-98551-0EP
09262-20106