01107-10452 Bolt Suzuki
DT75TCLG, DT75TCLH
Bolt
Price: query
Rating:
Suzuki entire parts catalog list:
Information:
1. Turn the crankshaft until the timing mark (C) on the crankshaft gear (1) is in alignment with the timing mark (C) on camshaft gear (2).2. Make a mark on the teeth of the fuel pump drive gear and the idler gear in their engaged position at location (X). Make a mark on the engaged teeth of idler gear and camshaft gear at location (Y). This will give assistance in the correct timing of the camshaft for the fuel injection pump during crankshaft installation.3. Install a 3/4"-16 NF bolt in the gear end of the crankshaft. Install two 5/8"-18 NF bolts in the flywheel end of the crankshaft. Fasten a hoist to the crankshaft. 4. Remove main bearing caps (3).5. Remove the crankshaft from the cylinder block. The weight of the crankshaft is 145 lb. (65 kg). 6. Remove main bearings (4) from the block and from the caps. Remove the thrust bearings. 7. Use tool (A) to remove the crankshaft gear and the oil seal wear sleeve.Install Crankshaft
Install the bearings dry when the clearance checks are made. Put clean engine oil on the main bearings for final assembly.
Make sure the upper and lower halves of the main bearings are installed so the bearing tabs fit into the notch in the cylinder block and main bearing caps.
1. Clean the bearing surfaces in the cylinder block. Install the upper halves of the main bearings in the block.2. Heat the crankshaft gear to a maximum temperature of 315°C (600°F). Install the gear on the crankshaft. Fasten a hoist to the crankshaft and put the crankshaft in position in the cylinder block with all timing marks in alignment.3. Clean the bearing surfaces of the main bearing caps. Install the lower halves of the main bearings in the caps. When the bearing clearance is checked and the engine is in a vertical position, such as in the vehicle, the crankshaft will have to be lifted up and held against the upper halves of the main bearings to get a correct measurement with the Plastigage. The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, it is not necessary to hold the crankshaft up. Do not turn the crankshaft when the Plastigage is in position to check clearances. 4. Check the main bearing clearances with Plastigage (A) as follows: a) Put a piece of Plastigage (A) in position as shown.
Make sure the part number on the main bearing cap is toward the front of the engine and the number on the main bearing cap is the same as the number on the cylinder block on the left side of each main bearing cap.
Do not turn the crankshaft when Plastigage (A) is in position.b) Install the main bearing caps. Put clean engine oil on the bolt threads and the face of the washers and install the bolts. Tighten the bolts to a torque of 30 3 lb.ft. (40 4 N m).
Do not use an impact wrench to tighten the bolts the additional 90 °.
c) Put a mark on each bolt and main bearing cap, then tighten the bolts 90 ° more.d) Remove the main bearing caps. Remove Plastigage (A) and measure the width of the Plastigage. The main bearing clearance must be .0030 to .0065 in. (0.076 to 0.165 mm). The maximum permissible clearance with used bearings is .010 in. (0.25 mm). 5. Put clean oil on thrust bearing (1) for the No. 5 main bearing. Install the thrust bearing with the identification "BLOCK SIDE" toward the cylinder block.6. Install the main bearing caps and tighten the bolts as in Steps 4b and 4c. 7. Check the crankshaft end play with tooling (B). The end play is controlled by the thrust bearings on the No. 5 main bearing. End play with new bearings is .0025 to .0145 in. (0.064 to 0.368 mm). The maximum permissible end play with used bearings is .025 in. (0.64 mm). If a replacement has been made for any of the timing gears, it will be necessary to check the engine timing to make sure it is correct. See INSTALL FUEL INJECTION PUMP HOUSING AND GOVERNOR.end by:a) install pistonsb) install timing gear coverc) install flywheel housing
Install the bearings dry when the clearance checks are made. Put clean engine oil on the main bearings for final assembly.
Make sure the upper and lower halves of the main bearings are installed so the bearing tabs fit into the notch in the cylinder block and main bearing caps.
1. Clean the bearing surfaces in the cylinder block. Install the upper halves of the main bearings in the block.2. Heat the crankshaft gear to a maximum temperature of 315°C (600°F). Install the gear on the crankshaft. Fasten a hoist to the crankshaft and put the crankshaft in position in the cylinder block with all timing marks in alignment.3. Clean the bearing surfaces of the main bearing caps. Install the lower halves of the main bearings in the caps. When the bearing clearance is checked and the engine is in a vertical position, such as in the vehicle, the crankshaft will have to be lifted up and held against the upper halves of the main bearings to get a correct measurement with the Plastigage. The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, it is not necessary to hold the crankshaft up. Do not turn the crankshaft when the Plastigage is in position to check clearances. 4. Check the main bearing clearances with Plastigage (A) as follows: a) Put a piece of Plastigage (A) in position as shown.
Make sure the part number on the main bearing cap is toward the front of the engine and the number on the main bearing cap is the same as the number on the cylinder block on the left side of each main bearing cap.
Do not turn the crankshaft when Plastigage (A) is in position.b) Install the main bearing caps. Put clean engine oil on the bolt threads and the face of the washers and install the bolts. Tighten the bolts to a torque of 30 3 lb.ft. (40 4 N m).
Do not use an impact wrench to tighten the bolts the additional 90 °.
c) Put a mark on each bolt and main bearing cap, then tighten the bolts 90 ° more.d) Remove the main bearing caps. Remove Plastigage (A) and measure the width of the Plastigage. The main bearing clearance must be .0030 to .0065 in. (0.076 to 0.165 mm). The maximum permissible clearance with used bearings is .010 in. (0.25 mm). 5. Put clean oil on thrust bearing (1) for the No. 5 main bearing. Install the thrust bearing with the identification "BLOCK SIDE" toward the cylinder block.6. Install the main bearing caps and tighten the bolts as in Steps 4b and 4c. 7. Check the crankshaft end play with tooling (B). The end play is controlled by the thrust bearings on the No. 5 main bearing. End play with new bearings is .0025 to .0145 in. (0.064 to 0.368 mm). The maximum permissible end play with used bearings is .025 in. (0.64 mm). If a replacement has been made for any of the timing gears, it will be necessary to check the engine timing to make sure it is correct. See INSTALL FUEL INJECTION PUMP HOUSING AND GOVERNOR.end by:a) install pistonsb) install timing gear coverc) install flywheel housing
Parts bolt Suzuki:
31281-95310
31281-95310 Bolt
DT50ECLE, DT50ELB, DT50ELC, DT50ELN, DT50ESB, DT50ESC, DT50ESN, DT50MCLE, DT50MLC, DT50MLN, DT50MSC, DT50MSN, DT60CLE, DT65ELC, DT65ELN, DT65ESC, DT65ESN, DT75TCLG, DT75TCLH, DT85TCLE, DT85TCLF
09100-08219
09100-08219 Bolt
DT115, DT140, DT2.2SV, DT20ELG, DT20ELH, DT20ELJ, DT20ESG, DT20ESH, DT20ESJ, DT20MLG, DT20MLH, DT20MLJ, DT20MSG, DT20MSH, DT20MSJ, DT25ELF, DT25ELG, DT25ELH, DT25ELJ, DT25ESG, DT25ESH, DT25ESJ, DT25MLD, DT25MLE, DT25MLF, DT25MLG, DT25MLH, DT25MLJ, DT
09100-08224
09100-08224 Bolt
30ELE, 30ESE, 30MLE, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DT15 MLE, DT150, DT15C, DT15ELD, DT15ELE, DT15ELF, DT15ELG, DT15ELH, DT15ELJ, DT15ESD, DT15ESE, DT15ESF, DT15ESG, DT15ESH, DT15ESJ, DT15MLD, DT15MLF, DT15MLG, DT15MLH, DT15M
01107-08252
01107-08252 Bolt
DT20ELG, DT20ELH, DT20ELJ, DT20ESG, DT20ESH, DT20ESJ, DT20MLG, DT20MLH, DT20MLJ, DT20MSG, DT20MSH, DT20MSJ, DT25ELF, DT25ELG, DT25ELH, DT25ELJ, DT25ESG, DT25ESH, DT25ESJ, DT25MLD, DT25MLE, DT25MLF, DT25MLG, DT25MLH, DT25MLJ, DT25MSD, DT25MSE, DT25MSF
09100-06131
09100-06131 Bolt
DF100, DF100, DF100, DF100A, DF115, DF115, DF115, DF115A, DF115TL, DF140, DF140, DF140, DF140A, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF15, DF15, DF15S, DF200, DF200, DF200T, DF200Z, DF225, DF225, DF225T, DF225Z, DF250, DF250, DF250T, DF250
09100-10208
09100-10208 Bolt, upper mounting
DF15, DF15, DF15S, DF9.9R, DF9.9RL, DF9.9S, DF9.9TH, DF9.9TH, DF99R, DF99TH, DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT1
09100-12039
09100-12039 Bolt
DF25, DF25Q, DF25Q(QR), DF25T, DF30, DF30Q, DF30Q(QR), DF30T, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DT115, DT140, DT40C, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL
09100-10155
09100-10155 Bolt
DF25, DF25Q, DF25Q(QR), DF25T, DF30, DF30Q, DF30Q(QR), DF30T, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DF60, DF60HL, DF60TL, DF70, DF70THL, DF70TL, DT115, DT140, DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150S