41111-94510-02M Suzuki Bracket, clamp STBD


41111-94510-02M Bracket, clamp STBD Suzuki DT85TCLE, DT85TCLF Bracket
41111-94510-02M Bracket, clamp STBD Suzuki
Rating:
98

Buy Bracket, clamp STBD 41111-94510-02M Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 1-3
 

Compatible models:

Suzuki entire parts catalog list:

DT85TCLE 1984
DT85TCLF 1985

Information:


Sulfuric Acid Burn Hazard may cause serious personal injury or death.The exhaust gas cooler may contain a small amount of sulfuric acid. The use of fuel with sulfur levels greater than 15 ppm may increase the amount of sulfuric acid formed. The sulfuric acid may spill from the cooler during service of the engine. The sulfuric acid will burn the eyes, skin and clothing on contact. Always wear the appropriate personal protective equipment (PPE) that is noted on a material safety data sheet (MSDS) for sulfuric acid. Always follow the directions for first aid that are noted on a material safety data sheet (MSDS) for sulfuric acid.
Illustration 1 g06185986
Illustration 2 g06186267
Drain the coolant from the cooling system into a suitable container for storage or disposal. Refer to Operation and Maintenance Manual, "Cooling System Coolant - Change" for the correct procedure.
Turn the battery disconnect switch to the OFF position.
Remove the tube assembly (not shown) from connection (12).
Disconnect harness assembly (8) from connection (9), Pressure sensor (10), and NOx Reduction System (NRS) valve (11).
Disconnect harness assembly (8) from wastegate solenoid (13) and cooled exhaust gas temperature sensor (14).
Cut cable straps (4) and position harness assembly (8) away from bracket (3).
Remove bolts (2) and bracket (3) from the inlet manifold.
Illustration 3 g06186285
If necessary, remove cooled exhaust gas temperature sensor (14). Refer to Disassembly and Assembly, "Temperature Sensor (Cooled Exhaust Gas) - Remove and Install" for the correct procedure.
Disconnect tube assembly (15) from exhaust gas cooler (1).
Remove bolts (16) and bolts (20) from exhaust gas cooler (1). Remove the exhaust gas cooler (1) from NRS valve assembly (11) and inlet manifold (19).Note: The exhaust cooler should be supported as the bolts are removed.
Remove gasket (18) (not shown) and gasket (21) (not shown). Note the orientation of the gaskets for installation purposes.
Remove O-ring seal (17) (not shown).Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A - P-80 Emulsion Rubber Assembly Lubricant 1
Ensure that the wiring harness assembly is correctly routed and the cable straps are not over tightened. Over tightening of the cable straps will damage the wiring harness and the convoluting.
Ensure that the exhaust gas cooler is clean and free from restriction. Ensure that the exhaust cooler is free from wear and damage. If necessary, replace any components that are worn or damaged.Note: The NRS exhaust gas cooler should not be cleaned.
Ensure that all tube assemblies are free from restriction and damage.
Illustration 4 g06186285
Illustration 5 g06186376
Apply Tooling (A) to new O-ring seal (17). Install new O-ring seal (17) to NOx Reduction System (NRS) assembly (11).
Install bolts (16) and gasket (18) to NRS assembly (11).
Install bolts (20) and gasket (21) (not shown) to NRS assembly (11).Note: The gasket should be fitted so the side tab is on the left-hand side with part number facing inwards.
Position exhaust gas cooler (1) onto inlet manifold and NRS assembly (11). Tighten bolts (16) and bolts (20) hand tight.Note: The exhaust gas cooler should be supported as the bolts are installed.
Tighten bolts (16) and bolts (20) to a torque of 22 N m (195 lb in).
Install hose assembly (15) to exhaust gas cooler (1) and tighten the hose clamp securely.
Illustration 6 g06185986
Illustration 7 g06186267
Position bracket (3) onto the exhaust gas cooler. Install bolts (2) and tighten the bolts to a torque of 22 N m (195 lb in).
If necessary, install cooled exhaust gas temperature sensor (14). Refer to Disassembly and Assembly, "Temperature Sensor (Cooled Exhaust Gas) - Remove and Install" for the correct procedure.
Reposition harness assembly (4). Connect harness assembly (8) to connection (9), pressure sensor (10), and NOx Reduction System (NRS) valve (11).
Reinstall the tube assembly (not shown) to connection (12) and tighten securely.
Connect harness assembly (8) to wastegate solenoid (13) and cooled exhaust gas temperature sensor (14).
Install new cable straps (4) to wiring harness assembly (8).Note: Ensure that the cable straps meet the Original Equipment Manufactures (OEM) specification.
Turn the battery disconnect switch to the ON position.
Fill the cooling system wi


Parts bracket Suzuki:

31805-95501
 
31805-95501 Bracket, Motor Relay
DF15, DF15, DF15S, DF9.9R, DF9.9RL, DF9.9S, DF9.9TH, DF9.9TH, DF99R, DF99TH, DT15 MLE, DT15ELD, DT15ELE, DT15ELF, DT15ELG, DT15ELH, DT15ELJ, DT15ESD, DT15ESE, DT15ESF, DT15ESG, DT15ESH, DT15ESJ, DT15MLD, DT15MLF, DT15MLG, DT15MLH, DT15MLJ, DT15MSD, D
54210-95202-02M
 
54210-95202-02M Bracket, lower mounting
DT75TCLD, DT75TCLE, DT75TCLF, DT85TCLD, DT85TCLE, DT85TCLF
54210-95210-02M
 
54210-95210-02M Bracket, lower mounting
DT75TCLD, DT75TCLE, DT75TCLF, DT75TCLG, DT75TCLH, DT85TCLD, DT85TCLE, DT85TCLF
41111-94504-02M
41111-94505-02M
41121-94503-02M
41121-94530-02M
43750-95250-02M
 
43750-95250-02M Bracket, steering
DT75TCLG, DT75TCLH, DT85TCLE, DT85TCLF
Back to top