09306-13007 Suzuki BUSHING, HOOK LEVER


09306-13007 BUSHING, HOOK LEVER Suzuki DF150, DF150, DF150, DF150TX, DF150ZX, DF175, DF175, DF175, DF175TX, DF175ZX, DF200, DF200, DF200, DF200T, DF200Z, DF225, DF225, DF225, DF225T, DF225Z, DF25, DF25(R)S, DF250, DF250, DF250, DF250T, DF250Z, DF25Q, DF25Q(QR), DF25R, DF25R, DF25T, DF30, BUSHING
09306-13007 BUSHING, HOOK LEVER Suzuki
Rating:
48

Buy BUSHING, HOOK LEVER 09306-13007 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 27
 

Suzuki entire parts catalog list:

DF150 2006,2007,2008,2009
DF150 2010
DF150 2011
DF150TX 2006,2007
DF150ZX 2006,2007
DF175 2006,2007,2008,2009
DF175 2010
DF175 2011
DF175TX 2006,2007
DF175ZX 2006,2007
DF200 2004,2005,2006,2007,2008,2009
DF200 2010
DF200 2011
DF200T 2004,2005,2006,2007
DF200Z 2004,2005,2006,2007
DF225 2004,2005,2006,2007,2008,2009
DF225 2010
DF225 2011
DF225T 2004,2005,2006,2007
DF225Z 2004,2005,2006,2007
DF25 2000,2001,2002,2003,2004,2005
DF25(R)S 2006,2007
DF250 2004,2005,2006,2007,2008,2009
DF250 2010
DF250 2011
DF250T 2004,2005,2006,2007
DF250Z 2004,2005,2006,2007
DF25Q 2000,2001,2002,2003,2004,2005,2006,2007
DF25Q(QR) 2000,2001,2002,2003,2004,2005,2006,2007
DF25R 2006,2007,2008,2009
DF25R 2010
DF25T 2000,2001,2002,2003,2004,2005,2006,2007
DF30 2000,2001,2002,2003,2004,2005,2006
DF30Q 2000,2001,2002,2003,2004,2005,2006,2007
DF30Q(QR) 2000,2001,2002,2003,2004,2005,2006,2007
DF30T 2000,2001,2002,2003,2004,2005,2006,2007
DF40A 2010
DF40A 2011
DF50A 2010
DF50A 2011
DF60A 2010
DF60A 2011
DF70A 2009
DF70A 2010
DF70A 2011
DF80A 2009
DF80A 2010
DF80A 2011
DF90A 2009
DF90A 2010
DF90A 2011
DT40C 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998
DT55CRLJ 1988
DT55CRLK 1989
DT55CRLL 1990
DT55HTCLJ 1988
DT55HTCLK 1989
DT55HTCLL 1990
DT55TCLJ 1988
DT55TCLK 1989
DT55TCLL 1990
DT55TCLM 1991
DT55TCLN 1992
DT55TCLP 1993
DT55TCLR 1994
DT55TCLS 1995
DT55TCLT 1996
DT55TCLV 1997
DT6 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002
DT65CRLJ 1988
DT65CRLK 1989

Information:

Start By:a. remove oil pump1. Check the connecting rods and caps for their identification and location. 2. Turn the crankshaft until the connecting rod caps are in the position shown.3. Remove nuts (1) and the cap from the connecting rod. Remove the lower half of the bearing from the cap.4. Push the connecting rod away from the crankshaft. Remove the upper half of the bearing from the connecting rod. Install the bearings dry when the clearance checks are made. Put clean engine oil on the bearings for final assembly.5. Install the upper half of the bearing in the connecting rod.6. Pull the connecting rod slowly on to the crankshaft.7. Install the lower half of the bearing in the cap. Be sure the tabs in the back of bearings are in the tab grooves of the connecting rod and cap.The serviceman must be very careful to use Plastigage, tool (A) correctly. The following points must be remembered:Make sure that the backs of the bearings and the bores are clean and dry.Make sure that the bearing locking tabs are properly seated in their slots.The crankshaft must be free of oil where the Plastigage touches it.Put a piece of Plastigage (A) on the crown of the bearing half that is in the cap. Do not allow the Plastigage to extend over the edge of the bearing.Install the bearing cap using the correct torque-turn specifications. Do not use an impact wrench. Be careful not to dislodge the bearing when the cap is installed.Do not turn the crankshaft with the Plastigage installed.Carefully remove the cap but do not remove the Plastigage. Measure the width of the Plastigage while it is in the bearing cap or on the crankshaft journal. Do this by using the correct scale on the package. Record the measurements.Remove the Plastigage before reinstalling the cap.When using Plastigage, the readings can sometimes be unclear. For example, all parts of the Plastigage are not the same width. Measure the major widths to make sure that they are within the specification range. Also, experience has shown that when checking clearances tighter than 0.10 mm (.004") the readings may be low by 0.013 to 0.025 mm (.0005 to .0010"). Out-of-round journals can give faulty readings. Also, journal taper may be indicated when one end of the Plastigage is wider that the other.For complete details concerning measuring bearing clearances, see Engine Bearings And Crankshafts, Form No. SEBD0531. 8. Use Plastigage (A) to check the bearing clearance.9. Put Plastigage (A) on the bearing.10. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts. Be sure the cylinder numbers on the rod cap and rod are the same and are on the same side of connecting rod. Numbers are on the same side of the rod and cap as are the bearing tab slots. If new rods are installed, put the cylinder number on the rod and cap. Do not turn the crankshaft when Plastigage (A) is in position. 11. Install rod caps (2). Install the nuts. Tighten each nut to a torque of 80 8 N m (60 6 lb.ft.). Put a mark on the nuts and cap, and tighten the nuts an extra 120° 5° from the mark. Remove the rod cap. Remove Plastigage (A), and check the bearing clearance. The bearing clearance must be 0.071 to 0.168 mm (.0028 to .0066 in.) for new bearings. Maximum clearance with used bearings is 0.25 mm (.010 in.).12. Put clean engine oil on lower half of the bearing. Install the rod cap again. Tighten each nut to a torque of 80 8 N m (60 6 lb.ft.). Put a mark on the nuts and cap, and tighten the nuts an extra 120° 5° from mark.13. Do Steps 1 through 12 for the remainder of the connecting rod bearings.End By:a. install oil pump


Parts bushing Suzuki:

09300-08005
 
09300-08005 Bushing, Rack Lever
DT3.5LD, DT3.5LE, DT3.5LN, DT3.5LT, DT3.5LX, DT3.5LZ, DT3.5SD, DT3.5SE, DT3.5SN, DT3.5ST, DT3.5SX, DT3.5SZ, DT4.5LB, DT4.5SB, DT4D, DT5LC, DT5LD, DT5LN, DT5LT, DT5LX, DT5LZ, DT5SC, DT5SD, DT5SN, DT5ST, DT5SX, DT5SZ, DT6, DT6LE, DT6LF, DT6SE, DT6SF, D
09300-12009
 
09300-12009 Bushing, Tilt Stopper Pin
20ELB, 20ELC, 20ELN, 25ELB, 25ELC, 25ELN, 25ELT, 25ELX, DT14C, DT14D, DT14F, DT16LB, DT16LC, DT16LN, DT16LT, DT16LT, DT16LT, DT16SB, DT16SC, DT16SN, DT16ST, DT16ST, DT16ST, DT20ESB, DT20ESC, DT20ESN, DT20MLB, DT20MLC, DT20MLN, DT20MSB, DT20MSC, DT20M
18253-98300
 
18253-98300 Bushing, Starter
DT16LT, DT16LT, DT16LT, DT16ST, DT16ST, DT16ST, DT3.5LN, DT3.5LT, DT3.5LX, DT3.5SN, DT3.5ST, DT3.5SX, DT5LD, DT5LT, DT5LX, DT5LZ, DT5SD, DT5ST, DT5SX, DT5SZ, DT6, DT6LE, DT6LF, DT6SE, DT6SF, DT8LD, DT8LE, DT8LF, DT8LG, DT8LH, DT8LT, DT8LX, DT8LZ, DT8
09306-10009
 
09306-10009 Bushing, Handle
DF100, DF100, DF115, DF115, DF115TL, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DF60, DF60HL, DF60TL, DF70, DF70THL, DF70TL, DF90, DF90TL, DT2.2SV, DT2D, DT2E, DT2F, DT2LG, DT2LH, DT2LJ, DT2LK, DT2LL, DT2SG, DT2SH, DT2SJ, DT2SK, DT2SL, D
09305-04005
 
09305-04005 Bushing, Starter Knob
30ELE, 30ESE, 30MLE, DT20ELG, DT20ELH, DT20ELJ, DT20ESG, DT20ESH, DT20ESJ, DT20MLG, DT20MLH, DT20MLJ, DT20MSG, DT20MSH, DT20MSJ, DT25ELF, DT25ELG, DT25ELH, DT25ELJ, DT25ESG, DT25ESH, DT25ESJ, DT25MLD, DT25MLE, DT25MLF, DT25MLG, DT25MLH, DT25MLJ, DT25
09306-13005
 
09306-13005 BUSHING
DT40C, DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH, DT65CRLG, DT65CRLH, DT65CRSG, DT65CRSH, DT65TCLF, DT65TCLG, DT65TCLH, DT65TCSG, DT65TCSH
09307-26004
 
09307-26004 BUSHING
DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG, DT55TCS
09319-12041
 
09319-12041 BUSHING
DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35TCLH, DT35TCLJ, DT35TCLK, DT40C, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT
Back to top