13125-87D10 Suzuki CARBURETOR GASKET


13125-87D10 CARBURETOR GASKET Suzuki DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR, DT150T CARBURETOR
13125-87D10 CARBURETOR GASKET Suzuki
Rating:
93

Buy CARBURETOR GASKET 13125-87D10 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 12
 

Suzuki entire parts catalog list:

DT150SSH 1987
DT150SSJ 1988
DT150SSK 1989
DT150SSL 1990
DT150SSM 1991
DT150SSN 1992
DT150STCLP 1993
DT150STCLR 1994
DT150STCLS 1995
DT150STCLT 1996
DT150TCLH 1987
DT150TCLJ 1988
DT150TCLK 1989
DT150TCLL 1990
DT150TCLM 1991
DT150TCLN 1992
DT150TCLP 1993
DT150TCLR 1994
DT150TCXGM 1991
DT150TCXGN 1992
DT150TCXGP 1993
DT150TCXGR 1994
DT150TCXGS 1995
DT150TCXGT 1996
DT150TCXH 1987
DT150TCXJ 1988
DT150TCXK 1989
DT150TCXL 1990
DT150TCXM 1991
DT150TCXN 1992
DT150TCXP 1993
DT150TCXR 1994
DT150TCXS 1995
DT150TCXT 1996

Information:


Table 1
Required Tools(1)
Tool Part Number Description QTY
A 128-8823 Long Nose Pliers 1
B 9U-7282 Indicator Fixture Group 2
C 8T-4177 Bolt 2
D 9U-7263 Indicator Contact Point 2
E 1U-8869 Dial Indicator (Digital) 2
F 1U-6673 Wrench (Fuel Ratio Control) 1
(1) Actual tooling may vary depending on the individual engine arrangement.The following procedure may be used to synchronize the unit injectors and the following procedure may be used to adjust the unit injectors.
Stop the engine and turn the electrical system to the OFF position.
Remove the fuel shutoff solenoid. Note: If the fuel shutoff solenoid is inaccessible, the following steps may be followed.
Turn the engine start switch to the ON position. Briefly engage the starter. Do not start the engine. Return the engine start switch to the ON position. Do not turn the engine start switch to the OFF position.
Turn the battery disconnect switch to the OFF position or disconnect the negative terminal of the battery. This will leave the fuel shutoff solenoid in the OPEN position.
Remove the valve cover.
Illustration 1 g00998517
Remove bolts (1) that attach the valve mechanism cover base.
Illustration 2 g00998519
Attach Tooling (A) to the rail for the fuel (2).
Illustration 3 g00998587
Install Tooling (B) in hole (3) for the valve mechanism cover base that is near the No. 1 cylinder. Attach Tooling (D) to Tooling (E). Insert Tooling (E) into the hole in Tooling (B). Note: Orient face (4) on Tooling (B) parallel to the crankshaft.
Install the other Tooling (B) in hole (3) for the valve mechanism cover base that is near the No. 2 cylinder. Attach Tooling (D) to Tooling (E). Insert Tooling (E) into the hole in Tooling (B). Note: Orient face (5) on Tooling (B) parallel to the crankshaft.
When the engine is viewed from the flywheel end, rotate Tooling (A) in a counterclockwise direction. You should feel resistance to a spring. Turn Tooling (A) past the start of the resistance of the spring. Zero out Tooling (E) for both the injectors. Note: Do not turn Tooling (A) all the way. This will lead to an inaccurate synchronization.
When the engine is viewed from the flywheel end, rotate Tooling (A) in a clockwise direction through the entire range of motion. The readings on Tooling (E) should change as the position of Tooling (A) is changed. Take a note of the values and of the difference in the values.
Illustration 4 g00998590
If the values are within a tolerance of 0.05 mm (0.0020 inch), no adjustment is required. If an adjustment is required, install Tooling (F) on the locknut at the base of the unit injector.
Illustration 5 g00998591
Loosen the locknut with the outer rod (6) and adjust the injector with the inner rod (7). Tighten the locknut when the adjustment is complete.
Repeat Step 8 through Step 11. Illustration 4 shows two unit injectors that have been properly synchronized.
Once the first two injectors have been synchronized, synchronize the remaining injectors by following the previous procedure. Remove Tooling (B) from the No. 2 cylinder and move to the No. 3 cylinder. Do not move Tooling (B) from the No. 1 cylinder. Always synchronize the injectors with the first injector. The first injector is the reference point for all the injectors.
Once all the injectors have been synchronized, remove all the tooling from the engine. Install bolts (1) that attach the air intake housing. Replace the valve cover and tighten the bolts that attach the valve cover. Refer to Specifications, "Valve Mechanism Cover" for instructions.


Parts carburetor Suzuki:

13250-87D00
 
13250-87D00 CARBURETOR FLOAT
DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR, DT150T
13510-87D00
 
13510-87D00 CARBURETOR ROD
DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR, DT150T
Back to top