09403-17302 CLAMP Suzuki
DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG, DT55TCS
CLAMP
Price: query
Rating:
Compatible models:
DT55CLF
DT55CRLG
DT55CRLJ
DT55CRLK
DT55CRLL
DT55CRSG
DT55CRSH
DT55HTCLH
DT55HTCLJ
DT55HTCLK
DT55HTCLL
DT55TCLG
DT55TCLH
DT55TCLJ
DT55TCLK
DT55TCLL
DT55TCLM
DT55TCLN
DT55TCLP
DT55TCLR
DT55TCLS
DT55TCLT
DT55TCLV
DT55TCSG
DT55TCSH
DT65CRLJ
DT65CRLK
DT65CRLL
DT65HTCLK
DT65HTCLL
DT65TCLJ
DT65TCLK
DT65TCLL
DT65TCLM
DT65TCLN
DT65TCLP
DT65TCLR
DT65TCLS
DT65TCLT
DT65TCLV
Suzuki
Suzuki entire parts catalog list:
- ELECTRICAL 4 » 09403-17302
- ELECTRICAL 4 » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- ELECTRICAL 4 » 09403-17302
- ELECTRICAL 4 » 09403-17302
- ELECTRICAL 4 » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- ELECTRICAL 4 » 09403-17302
- ELECTRICAL 4 » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- ELECTRICAL 4 » 09403-17302
- ELECTRICAL 4 » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
- HARNESS » 09403-17302
Information:
Air Compressors:
BHP = 1/4 × cu. ft. per minute at 100 psi Increase BHP 10% for 125 psiDecrease BHP 10% for 80 psiAMA HP for U.S.A. Tax Purposes:
Where: N = No. of Cylinders D = Piston Diameter in inchesBrake Mean Effective Pressure:
Conveyors: 15 to 20° incline.
Cooling:
Heat Exchanger Flow Rate Raw water to jacket water 1:1 to 2:1Submerged Pipe Cooling 1/2 Sq. ft. surface area per HPWith 85°F flowing raw waterElectricity:
Generator Capacity Required: Motors:1 kW per nameplate HP (motor running cool or warm to touch)11/4 kW per nameplate HP (motor running hot to touch)Horsepower Requirements: 11/2 BHP per kW of load or Electric Sets:
Motor Starting Requirements: Inrush kVa (Code F motor) = 5.5 × BHPInrush Current (Code F motor)= 6.2 × Full load rated current1 kVa per HP at full loadGenerator full load rated current capacity: Generator Cooling Requirements: Air Flow - 150°CFM per kW loss × efficiencyCircuit Breaker Trip Selection: 1.15 to 1.25 × full load generator amp ratingSingle Phase Rating of 3-Phase Generator: 60% of 3-phase ratingGenerator Temperature Rise: Increase 1°C for each 330 feet above 3300 feetFuel Consumption
Gas Compressor:
BHP = 22 RcVSWhere: Rc = Stage Compression RatioV = Million cu. ft./dayS = Number of StagesHeat Rejection
% of Fuel Energy Consumed Jacket Water Prechambered engines BTU/min = 36 × BHPDirect injection engines BTU/min = 27 × BHP Hours Per:
Year = 8760 (365 Days)Week = 168 (7 Days)Month = 720 (30 Days)Oilfield Drilling:
Hoisting Mud Pumps Rotary Table On Site Power Requirements:
Based on 100,000 sq. ft. of office bldg., etc., and 40°N. latitudes Electric Requirements: 600 kW continuous load(air conditioning is absorption)Use three - 300 kW units (2 prime and 1 standby)Air Conditioning Compressor 400 tons prime loadUse two - 200 HP engines (No standby)Pumps:
Pipe Line BHP = Barrels per hour × psi × 0.00053 *Efficiency Refrigeration
One ton refrigeration = 200 BTU/Min. = 12,000 BTU/Hr.One boiler HP = 33,475 BTU/Hr.One ton compressor rating = One Engine HPAuxiliary air conditioning equipment requires 1/4 HP per ton of compressor ratingIce Plant: Complete power requires 4-5 HP per daily ton capacitySawmill:
11/2 BHP per inch of saw diameter at 500 RPM Increase or decrease in proportion to RPMSwing Cut-Off Saw Table Trimmer 71/2 to 10 BHPBlower Fan 12-foot sawdust 3 to 5 BHPPlaner Mill 2 to 4 BHP per 100 board feet per hour 24 to 30-inch planers 15 to 25 BHPEdgers Approximate fuel consumption: Softwood 1 gal. per 1000 board feetHardwood 1 gal. per 750 board feetPropellor Shaft Size Selection:
For intermediate shaft and tailshaft in marine installations Where: D = Diameter in inchesHP = HorsepowerS = Torsional stress in PSI (usually 5000)Shovels and Draglines:
Use manufacturer's recommendations. Torque: (4 cycle only) Torque Converters:
Peak output shaft horsepower: Normally 80% of input horsepower for either single or three-stage converterOutput shaft speed at peak output horsepower: Single-stage - 0.7 to 0.85 engine full load speedThree-stage - 0.5 to 0.6 engine full load speedTorque multiplication at or near stall: Single-stage - 2.2 to 3.4 times engine torqueThree-stage - 3.6 to 5.4 times engine torqueVentilation:
Natural 1/2 net square inch for each BHPBlown 1/3 net square inch for each BHPMetric Units
Air Compressors:
110 kW = 1 m3/min @ 850 kPa100 kW = 1 m3/min @ 675 kPa90 kW = 1 m3/min @ 550 kPaAMA Power for U.S.A. Tax Purposes:
Where: N = No. of CylindersD = Piston Diameter in millimetersBrake Mean Effective Pressure:
Conveyors: 15 to 20° incline. Cooling:
Heat Exchanger Flow Rate Raw water to jacket water 1:1 to 2:1Submerged Pipe Cooling 1 m2 surface area per 16 kW with 30°C flowing raw waterElectricity:
Generator Capacity Required: Motors:11/3 kW per nameplate kW (motor running cool or warm to touch)12/3 kW per nameplate kW (motor running hot to touch)Engine Power Requirements: Electric Sets:
Motor Starting Requirements: Inrush kVa (Code F motor) = 41/8 × nameplate kWInrush Current (Code F motor) = 6.2 × full load rated current11/3 kVa per kW at full loadGenerator full load rated current capacity: Generator Cooling Requirements: Air Flow = 41/4 m3 per kW loss × efficiencyCircuit Breaker Trip Selection: 1.15 to 1.25 × full load generator amp ratingSingle Phase Rating of 3-Phase Generator: 60% of 3-Phase ratingGenerator Temperature Rise: Increase 1°C for each 100 meters above 1000 metersFuel Consumption
3*33 720 kJ/mGas Compressor:
kW = 777 Rc VSWhere : Rc = Stage Compression RatioV = Millions cubic meters per dayS = Number of Stages
BHP = 1/4 × cu. ft. per minute at 100 psi Increase BHP 10% for 125 psiDecrease BHP 10% for 80 psiAMA HP for U.S.A. Tax Purposes:
Where: N = No. of Cylinders D = Piston Diameter in inchesBrake Mean Effective Pressure:
Conveyors: 15 to 20° incline.
Cooling:
Heat Exchanger Flow Rate Raw water to jacket water 1:1 to 2:1Submerged Pipe Cooling 1/2 Sq. ft. surface area per HPWith 85°F flowing raw waterElectricity:
Generator Capacity Required: Motors:1 kW per nameplate HP (motor running cool or warm to touch)11/4 kW per nameplate HP (motor running hot to touch)Horsepower Requirements: 11/2 BHP per kW of load or Electric Sets:
Motor Starting Requirements: Inrush kVa (Code F motor) = 5.5 × BHPInrush Current (Code F motor)= 6.2 × Full load rated current1 kVa per HP at full loadGenerator full load rated current capacity: Generator Cooling Requirements: Air Flow - 150°CFM per kW loss × efficiencyCircuit Breaker Trip Selection: 1.15 to 1.25 × full load generator amp ratingSingle Phase Rating of 3-Phase Generator: 60% of 3-phase ratingGenerator Temperature Rise: Increase 1°C for each 330 feet above 3300 feetFuel Consumption
Gas Compressor:
BHP = 22 RcVSWhere: Rc = Stage Compression RatioV = Million cu. ft./dayS = Number of StagesHeat Rejection
% of Fuel Energy Consumed Jacket Water Prechambered engines BTU/min = 36 × BHPDirect injection engines BTU/min = 27 × BHP Hours Per:
Year = 8760 (365 Days)Week = 168 (7 Days)Month = 720 (30 Days)Oilfield Drilling:
Hoisting Mud Pumps Rotary Table On Site Power Requirements:
Based on 100,000 sq. ft. of office bldg., etc., and 40°N. latitudes Electric Requirements: 600 kW continuous load(air conditioning is absorption)Use three - 300 kW units (2 prime and 1 standby)Air Conditioning Compressor 400 tons prime loadUse two - 200 HP engines (No standby)Pumps:
Pipe Line BHP = Barrels per hour × psi × 0.00053 *Efficiency Refrigeration
One ton refrigeration = 200 BTU/Min. = 12,000 BTU/Hr.One boiler HP = 33,475 BTU/Hr.One ton compressor rating = One Engine HPAuxiliary air conditioning equipment requires 1/4 HP per ton of compressor ratingIce Plant: Complete power requires 4-5 HP per daily ton capacitySawmill:
11/2 BHP per inch of saw diameter at 500 RPM Increase or decrease in proportion to RPMSwing Cut-Off Saw Table Trimmer 71/2 to 10 BHPBlower Fan 12-foot sawdust 3 to 5 BHPPlaner Mill 2 to 4 BHP per 100 board feet per hour 24 to 30-inch planers 15 to 25 BHPEdgers Approximate fuel consumption: Softwood 1 gal. per 1000 board feetHardwood 1 gal. per 750 board feetPropellor Shaft Size Selection:
For intermediate shaft and tailshaft in marine installations Where: D = Diameter in inchesHP = HorsepowerS = Torsional stress in PSI (usually 5000)Shovels and Draglines:
Use manufacturer's recommendations. Torque: (4 cycle only) Torque Converters:
Peak output shaft horsepower: Normally 80% of input horsepower for either single or three-stage converterOutput shaft speed at peak output horsepower: Single-stage - 0.7 to 0.85 engine full load speedThree-stage - 0.5 to 0.6 engine full load speedTorque multiplication at or near stall: Single-stage - 2.2 to 3.4 times engine torqueThree-stage - 3.6 to 5.4 times engine torqueVentilation:
Natural 1/2 net square inch for each BHPBlown 1/3 net square inch for each BHPMetric Units
Air Compressors:
110 kW = 1 m3/min @ 850 kPa100 kW = 1 m3/min @ 675 kPa90 kW = 1 m3/min @ 550 kPaAMA Power for U.S.A. Tax Purposes:
Where: N = No. of CylindersD = Piston Diameter in millimetersBrake Mean Effective Pressure:
Conveyors: 15 to 20° incline. Cooling:
Heat Exchanger Flow Rate Raw water to jacket water 1:1 to 2:1Submerged Pipe Cooling 1 m2 surface area per 16 kW with 30°C flowing raw waterElectricity:
Generator Capacity Required: Motors:11/3 kW per nameplate kW (motor running cool or warm to touch)12/3 kW per nameplate kW (motor running hot to touch)Engine Power Requirements: Electric Sets:
Motor Starting Requirements: Inrush kVa (Code F motor) = 41/8 × nameplate kWInrush Current (Code F motor) = 6.2 × full load rated current11/3 kVa per kW at full loadGenerator full load rated current capacity: Generator Cooling Requirements: Air Flow = 41/4 m3 per kW loss × efficiencyCircuit Breaker Trip Selection: 1.15 to 1.25 × full load generator amp ratingSingle Phase Rating of 3-Phase Generator: 60% of 3-Phase ratingGenerator Temperature Rise: Increase 1°C for each 100 meters above 1000 metersFuel Consumption
3*33 720 kJ/mGas Compressor:
kW = 777 Rc VSWhere : Rc = Stage Compression RatioV = Millions cubic meters per dayS = Number of Stages
Parts clamp Suzuki:
09407-12402
09407-12402 Clamp, Lead Wire
25ELT, 25ELX, DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXG
09403-10307
09403-10307 Clamp
DT75TCLD, DT75TCLE, DT75TCLF, DT75TCLG, DT75TCLH, DT85ELT, DT85TCLD, DT85TCLE, DT85TCLF, DT85TCLT, DT85TCLX, DT85TCLZ, DT85TELN, DT85TELT
09404-10405
09404-10405 Clamp, PTT cable
DT75TCLD, DT75TCLE, DT75TCLF, DT75TCLG, DT75TCLH, DT85ELT, DT85TCLD, DT85TCLE, DT85TCLF, DT85TCLT, DT85TCLX, DT85TCLZ, DT85TELT
41130-95252
41130-95252 CLAMP BRACKET SHAFT
DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH, DT65CRLG, DT65CRLH, DT65CRSG, DT65CRSH, DT65TCLF, DT65TCLG, DT65TCLH, DT65TCSG, DT65TCSH
41130-95291
41130-95291 CLAMP BRACKET SHAFT
DF25, DF25Q, DF25Q(QR), DF25T, DF30, DF30Q, DF30Q(QR), DF30T, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH, DT65CRLG, DT65CRLH, DT65CRSG, DT65CRSH, DT
41311-95250-02M
41311-95250-02M CLAMP BRACKET PLATE
DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH, DT65CRLG, DT65CRLH, DT65CRSG, DT65CRSH, DT65TCLF, DT65TCLG, DT65TCLH, DT65TCSG, DT65TCSH
09407-14403
09407-14403 CLAMP
DF100, DF100, DF100, DF100A, DF115, DF115, DF115, DF115A, DF115TL, DF140, DF140, DF140, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF15, DF15, DF15, DF150, DF150, DF150, DF150TX, DF150ZX, DF15A, DF15S, DF175, DF175, DF175, DF175TX, DF175ZX, DF20
09408-00033
09408-00033 CLAMP
DT40C, DT75TCLJ, DT75TCLK, DT75TCLL, DT75TCLM, DT75TCLN, DT75TCLP, DT75TCLR, DT75TCLS, DT75TCLT, DT75TCLV, DT85TCLJ, DT85TCLK, DT85TCLL, DT85TCLM, DT85TCLN, DT85TCLP, DT85TCLR, DT85TCLS, DT85TCLT, DT85TCLV, DT85TCLW, DT85TCLX, DT85TCLY