19211-94700 Suzuki THROTTLE LEVER WASHER


19211-94700 THROTTLE LEVER WASHER Suzuki DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG, DT55TCS THROTTLE
19211-94700 THROTTLE LEVER WASHER Suzuki
Rating:
93

Buy THROTTLE LEVER WASHER 19211-94700 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 6
 

Suzuki entire parts catalog list:

DT55CLF 1985
DT55CRLG 1986,1987
DT55CRLJ 1988
DT55CRLK 1989
DT55CRLL 1990
DT55CRSG 1986
DT55CRSH 1987
DT55HTCLH 1987
DT55HTCLJ 1988
DT55HTCLK 1989
DT55HTCLL 1990
DT55TCLG 1986
DT55TCLH 1987
DT55TCLJ 1988
DT55TCLK 1989
DT55TCLL 1990
DT55TCLM 1991
DT55TCLN 1992
DT55TCLP 1993
DT55TCLR 1994
DT55TCLS 1995
DT55TCLT 1996
DT55TCLV 1997
DT55TCSG 1986
DT55TCSH 1987
DT65CRLG 1986
DT65CRLH 1987
DT65CRLJ 1988
DT65CRLK 1989
DT65CRLL 1990
DT65CRSG 1986
DT65CRSH 1987
DT65HTCLK 1989
DT65HTCLL 1990
DT65TCLF 1985
DT65TCLG 1986
DT65TCLH 1987
DT65TCLJ 1988
DT65TCLK 1989
DT65TCLL 1990
DT65TCLM 1991
DT65TCLN 1992
DT65TCLP 1993
DT65TCLR 1994
DT65TCLS 1995
DT65TCLT 1996
DT65TCLV 1997
DT65TCSG 1986
DT65TCSH 1987

Information:

START BY:a) remove electric starting motorb) remove fuel injection lines No. 1 piston at top center (TC) on the compression stroke is the starting point for all timing procedures. The engine is seen from the flywheel end when direction of crankshaft rotation is given. 1. Install tooling (A) on flywheel housing as shown.2. To find top center compression stroke for No. 1 piston, first turn the flywheel clockwise (opposite the direction of engine rotation) approximately 30 degrees. This procedure is to remove all play from the timing gears.3. Turn the flywheel counterclockwise until a 3/8"-16 NC bolt (1) can be installed in the flywheel through the hole in the flywheel housing. The No. 1 and No. 4 pistons are now at top center position.
If you go past the bolt hole you must start over with Step 2.
4. Remove the valve cover.5. To see if the No. 1 piston is on the compression stroke, look at the valves of the No. 1 cylinder. The valves will be closed if No. 1 cylinder is on the compression stroke. You must be able to move the rocker arms up and down with your hand.6. If No. 1 piston is not on the compression stroke, remove the 3/8"-16 NC bolt (1) and turn the flywheel 360° counterclockwise. Install the 3/8" bolt as before. The No. 1 piston is now at top center (TC) on the compression stroke. 7. To install tool (B) in the fuel injection pump housing, remove the 3/8"-16 NC bolt from the flywheel and turn the flywheel approximately 30° clockwise.8. Remove bolt and install tool (B) in the governor housing. Turn the flywheel slowly in a counterclockwise direction until pin (8) goes into the notch in the camshaft.9. Put the 3/8"-16 NC bolt in the timing hole in the flywheel housing. If the bolt can be installed in the hole in the flywheel, the timing on the fuel injection pump is correct. 10. Remove bolts (2) and right hand guard assembly (3).11. Remove fan belts from alternator and fan pulleys. 12. Remove nuts (5) and cover (4) from the front of the timing gear cover. 13. Remove bolt (6) and washer (7) that hold the drive gear to the fuel injection pump. 14. Install tooling (C) to loosen the drive gear from drive sleeve. 15. Remove bolt (12) and clamps (13) that fasten the turbocharger inlet and drain lines together.16. Remove bolts (8) and (11) and gaskets that fasten oil tube assemblies (9) and (10) to the turbocharger. Remove oil tube assembly (9) from engine. 17. Remove two bolts (14) and loosen bolt (17) that fastens bracket (15) to the fuel injection pump. Remove tube assembly (10) and adapter from the cylinder block. 18. Remove bolt that fastens the breather tube bracket (19) to the fuel pump.19. Remove three nuts (18). Remove the fuel injection pump housing and governor (16).Install Fuel Injection Pump Housing And Governor
1. Inspect the O-ring seal for damage in the transfer pump housing (2) make a replacement if necessary.2. Put the fuel injection pump housing and governor (1) in position on the engine and against the timing gear plate. 3. Install three nuts (3) that hold the fuel injection pump housing to the timing gear plate. Do not tighten nuts until the adapter and lower turbocharger oil tube assembly is installed.4. Install breather tube bracket (4) in position on the fuel injection pump. 5. Inspect O-ring seals (7) on adapter (8) and make a replacement if necessary.6. Put adapter (8) and tube assembly (5) in position and install two bolts to hold the adapter to the block. Install gasket and two bolts to hold tube assembly (5) to the turbocharger. Tighten three nuts that fasten the fuel injection pump housing and governor to the timing gear plate. Tighten bolt on bracket (6). 7. Put oil tube assembly (9) in position and install gasket and two bolts to fasten tube to the turbocharger. Install clamps that fasten tube assemblies (5) and (9) together.
Typical Example8. Put drive gear in position on the fuel injection pump shaft and install washer (10) and bolt (11) finger tight. Install tooling (C) on drive gear.9. Put a torque wrench on tool (C) and give it a torque of 45 to 50 lb.ft. (60 to 70 N m). While this torque is held, tighten the drive gear bolt to a torque of 110 5 lb.ft. (149 7 N m). Remove pin (B) from the fuel pump and the 3/8"-16 NC bolt from the flywheel.
Typical Example10. Turn the engine flywheel two complete revolutions with tooling (A). If the 3/8"-16 NC bolt goes in the hole in the flywheel when the timing pin is installed in the notch in the camshaft, the timing is correct. 11. Put gasket and cover (12) in position on the timing gear cover. Install nuts. Tighten nuts to a torque of 17 3 lb.ft. (23 4 N m).12. Install vee belts on the pulleys. Make an adjustment of the vee belts. See INSTALL ALTERNATOR. 13. Install right hand fan guard (13) in position on the radiator. 14. Remove tooling (A) and the 3/8"-16 NC bolt (14) from the flywheel housing.END BY:a) install fuel injection linesb) install electric starting motor


Parts throttle Suzuki:

37800-94821
 
37800-94821 THROTTLE SWITCH SET
DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH, DT65CRLG, DT65CRLH, DT65CRSG, DT65CRSH, DT65TCLF, DT65TCLG, DT65TCLH, DT65TCSG, DT65TCSH
37814-94710
 
37814-94710 THROTTLE VALVE SWITCH CAM
DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH
37810-94611
 
37810-94611 THROTTLE VALVE SENSOR ASSEMBLY
DT115, DT140, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT5
13510-94700
 
13510-94700 THROTTLE ROD ASSEMBLY
DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG, DT55TCS
63610-94700
 
63610-94700 THROTTLE CABLE ASSEMBLY
DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH
37810-94601
THROTTLE VALVE SENSOR ASSEMBLY
37810-94601 THROTTLE VALVE SENSOR ASSEMBLY
DT115, DT140, DT65CRLG, DT65CRLH, DT65CRLJ, DT65CRLK, DT65CRLL, DT65CRSG, DT65CRSH, DT65HTCLK, DT65HTCLL, DT65TCLF, DT65TCLG, DT65TCLH, DT65TCLJ, DT65TCLK, DT65TCLL, DT65TCLM, DT65TCLN, DT65TCLP, DT65TCLR, DT65TCLS, DT65TCLT, DT65TCLV, DT65TCSG, DT65
19135-95621
 
19135-95621 THROTTLE LEVER ROD
DT75TCLJ, DT75TCLK, DT75TCLL, DT75TCLM, DT75TCLN, DT75TCLP, DT75TCLR, DT75TCLS, DT75TCLT, DT75TCLV
19211-95600
 
19211-95600 THROTTLE LEVER WASHER
DT75TCLJ, DT75TCLK, DT75TCLL, DT75TCLM, DT75TCLN, DT75TCLP, DT75TCLR, DT75TCLS, DT75TCLT, DT75TCLV, DT85TCLJ, DT85TCLK, DT85TCLL, DT85TCLM, DT85TCLN, DT85TCLP, DT85TCLR, DT85TCLS, DT85TCLT, DT85TCLV, DT85TCLW, DT85TCLX, DT85TCLY
Back to top