65855-92D10 Suzuki COVER, GAUGE


65855-92D10 COVER, GAUGE Suzuki DT115, DT140, DT15C, DT25C, DT30C, DT4, DT40C, DT55CRLJ, DT55CRLK, DT55CRLL, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT5Y, DT6, DT65CRLJ, DT65CRLK, DT65CRLL, COVER
65855-92D10 COVER, GAUGE Suzuki
Rating:
33

Buy COVER, GAUGE 65855-92D10 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 9
 

Suzuki entire parts catalog list:

DT115 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001
DT140 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001
DT15C 1989,1990,1991,1992,1993,1994,1995,1996,1997
DT25C 1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000
DT30C 1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000
DT4 1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001
DT40C 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998
DT55CRLJ 1988
DT55CRLK 1989
DT55CRLL 1990
DT55HTCLJ 1988
DT55HTCLK 1989
DT55HTCLL 1990
DT55TCLJ 1988
DT55TCLK 1989
DT55TCLL 1990
DT55TCLM 1991
DT55TCLN 1992
DT55TCLP 1993
DT55TCLR 1994
DT55TCLS 1995
DT55TCLT 1996
DT55TCLV 1997
DT5Y 1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001
DT6 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002
DT65CRLJ 1988
DT65CRLK 1989
DT65CRLL 1990
DT65HTCLK 1989
DT65HTCLL 1990
DT65TCLJ 1988
DT65TCLK 1989
DT65TCLL 1990
DT65TCLM 1991
DT65TCLN 1992
DT65TCLP 1993
DT65TCLR 1994
DT65TCLS 1995
DT65TCLT 1996
DT65TCLV 1997
DT8CENK 1989
DT8CENL 1990
DT8CLJ 1988
DT8CLK 1989
DT8CLL 1990
DT8CLM 1991
DT8CNK 1989
DT8CNL 1990
DT8CSJ 1988
DT8CSL 1990
DT8CSM 1991
DT8MCLN 1992
DT8MCLP 1993
DT8MCLS 1995
DT8MCLT 1996
DT8MCLV 1997
DT8MCSN 1992
DT8MCSP 1993
DT8MCSR 1994
DT8MCSS 1995
DT8MCST 1996
DT8MCSV 1997
DT8MSLR 1994
DT8SCK 1989
DT9.9 CELK 1989
DT9.9CELJ 1988
DT9.9CELL 1990
DT9.9CELM 1991
DT9.9CELN 1992
DT9.9CELP 1993
DT9.9CELR 1994
DT9.9CELS 1995
DT9.9CELT 1996
DT9.9CENK 1989
DT9.9CESJ 1988
DT9.9CESK 1989
DT9.9CESL 1990
DT9.9CESM 1991
DT9.9CESN 1992
DT9.9CESP 1993
DT9.9CESR 1994
DT9.9CESS 1995
DT9.9CEST 1996
DT9.9CNELP 1993
DT9.9CNELR 1994
DT9.9CNELS 1995
DT9.9CNELT 1996
DT9.9CNEXP 1993
DT9.9CNEXR 1994
DT9.9CNEXS 1995
DT9.9CNEXT 1996
DT9.9CNEXV 1997
DT9.9CNJ 1988
DT9.9CNK 1989
DT9.9CNL 1990
DT9.9CNLN 1992
DT9.9MCLJ 1988
DT9.9MCLK 1989
DT9.9MCLL 1990
DT9.9MCLM 1991
DT9.9MCLN 1992
DT9.9MCLP 1993
DT9.9MCLR 1994
DT9.9MCLS 1995
DT9.9MCLT 1996
DT9.9MCLV 1997
DT9.9MCNLR 1994
DT9.9MCNLT 1996
DT9.9MCNLV 1997
DT9.9MCSJ 1988
DT9.9MCSK 1989
DT9.9MCSL 1990
DT9.9MCSM 1991

Information:

Start By:a. remove timing gear cover1. Put the engine in correct timing. See the topic, Remove Fuel Injection Pump Housing And Governor, for this procedure.
Typical Example2. Remove bolt (1) and the washer that holds gear (2) in place.3. Install tooling (C) and bolt (1) to hold the sleeve on the end of the fuel injection pump camshaft.4. Install tooling (A) on gear (2) and tighten the center bolt of tooling (A) until the gear is loosened.5. Remove tooling (A), bolt (1), tooling (C) and the gear.
Typical Example6. Remove bolts (4), plate (3) and idler gear (5). 7. Inspect the bearing in idler gear (5) for wear or damage. If a replacement of the bearing is needed, use tool group (B) and a press to remove it from the gear as shown.
Typical Example8. Remove bolts (6) and camshaft gear (7) from the camshaft.9. Remove the three nuts on the back side of the plate that hold the fuel pump to the plate.
Typical Example10. Bend locks (9) away from the bolts.11. Remove the bolts, locks (9) and plate (8) from the cylinder block.12. Remove the old gasket material from the cylinder block and plate (8).Install Timing Gears & Plate
Typical Example1. Make sure O-ring seal (10) is in place on the fuel pump housing.2. Clean the old gasket from the contact surfaces of the timing gear plate and cylinder block. Install a new gasket on the cylinder block. Cut the gasket even with the bottom face of the cylinder block. Put 5H2471 Gasket Cement on the bottom of the gasket where the gasket makes contact with the gasket for the oil pan.
Typical Example3. Put timing gear plate (8) in position on the cylinder block. Install the three nuts that hold the fuel pump on to the back side of the plate. Install the locks and six bolts that hold the plate in place.
Typical Example4. Install camshaft gear (7) with the "C" mark on the camshaft gear in alignment with the "C" mark on the crankshaft gear. Install the washers and bolts that hold the gear in place. 5. Install the bearing in idler gear (5) with tool group (B) and a press. The end of the bearing must be 1.52 mm (.060 in.) below the face of the gear hub.
Typical Example6. Put idler gear (5) in position. Install the plate and bolts.
Typical Example7. Put fuel injection pump drive gear (2) in position on the fuel injection pump.8. Install the bolt and the washer as shown to hold the timing gear to the camshaft. Install the washer with the larger outside diameter toward the bolt head. Tighten the bolt finger tight only.
Typical Example9. Install tooling (D) in the holes of the fuel injection pump drive gear as shown. Put a torque of approximately 68 N m (50 lb.ft.) on the pump drive gear in a clockwise direction (as seen from the front of the engine). With the clockwise torque on the pump drive using tooling (E) to tighten the bolt to a torque of 270 25 N m (199 18 lb.ft.).10. For correct timing of the fuel injection pump and engine, see the topic, Install Fuel Injection Pump Housing And Governor.End By:a. install timing gear cover


Parts cover Suzuki:

Back to top