48832-87D00 Suzuki DOWN PRESSURE VALVE


48832-87D00 DOWN PRESSURE VALVE Suzuki DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR, DOWN
48832-87D00 DOWN PRESSURE VALVE Suzuki
Rating:
68

Buy DOWN PRESSURE VALVE 48832-87D00 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 31
 

Suzuki entire parts catalog list:

DT150 1998,1999,2000,2001,2002,2003
DT150SSH 1987
DT150SSJ 1988
DT150SSK 1989
DT150SSL 1990
DT150SSM 1991
DT150SSN 1992
DT150STCLP 1993
DT150STCLR 1994
DT150STCLS 1995
DT150STCLT 1996
DT150TCLH 1987
DT150TCLJ 1988
DT150TCLK 1989
DT150TCLL 1990
DT150TCLM 1991
DT150TCLN 1992
DT150TCLP 1993
DT150TCLR 1994
DT150TCXGM 1991
DT150TCXGN 1992
DT150TCXGP 1993
DT150TCXGR 1994
DT150TCXGS 1995
DT150TCXGT 1996
DT150TCXH 1987
DT150TCXJ 1988
DT150TCXK 1989
DT150TCXL 1990
DT150TCXM 1991
DT150TCXN 1992
DT150TCXP 1993
DT150TCXR 1994
DT150TCXS 1995
DT150TCXT 1996
DT200 1998,1999,2000,2001,2002,2003
DT225 1998,1999,2000,2001,2002,2003

Information:

1. Remove the bolt from the automatic timing advance housing to support (1). Remove support (1).2. Remove bracket (2) and the remainder of the 3/8" cylinder head bolts (3).3. Do Steps 3a through 3c for the left hand cylinder head only. a) Disconnect clip (4) and move the wiring harness to the side. b) Disconnect ether start line (7) from fittings (5) and (9).c) Remove bolts (8) and remove plate (6) and ether start line (7).4. Do Steps 4a through 4c for the right hand cylinder head only. a) Disconnect the wire assembly from the two sensor units.b) Disconnect the air line to the fuel ratio control.c) Disconnect the two fuel lines. 5. Remove four head bolts (10) from the cylinder head. 6. Install tooling (A). Fasten a hoist to tooling (A).7. Remove the remainder of head bolts (11) from the cylinder head. Remove the cylinder head. Weight of the cylinder head is 200 lb. (90 kg).8. Remove the head gasket from the spacer plate. A new spacer plate gasket and seals must be installed when the cylinder head is removed. See REMOVE AND INSTALL SPACER PLATE.Install Cylinder Heads (Later)
1. Thoroughly clean the spacer plates and bottom surface of the cylinder heads. Install a new head gasket (1). Do not use any adhesives. A new spacer plate gasket and seals must be installed when the cylinder head is removed. See REMOVE AND INSTALL SPACER PLATE. 2. Install tooling (A) on the cylinder head as shown.3. Fasten a hoist to tooling (A) and put the cylinder head in position on the spacer plate. 4. Put clean engine oil on the threads of the cylinder head bolts. Install cylinder head bolts and washers. Tighten the bolts in the following sequence. a) Tighten bolts 2 through 15 in number sequence to a torque of 200 20 lb.ft. (270 25 N m).b) Tighten bolts 2 through 15 in number sequence to a torque of 330 15 lb.ft. (447 20 N m).c) Tighten bolts 2 through 15 in number sequence to a torque of 330 15 lb.ft. (447 20 N m). 5. Install push rods (16) respective to their location.6. Put clean engine oil on the bridge dowels. Install valve bridges (17) in their respective locations on the cylinder head.7. Make an adjustment to the valve bridges. See BRIDGE ADJUSTMENT in TESTING AND ADJUSTING. 8. Put rocker shaft assembly (18) in position. Make an alignment of the push rods and rocker arms. Put clean engine oil on the threads of bolts (22) through (25). Install bolts and washers. Tighten the bolts as follows: a) Tighten bolts (22) through (25) in number sequence to a torque of 200 20 lb.ft. (270 25 N m).b) Tighten bolts (22) through (25) in number sequence to a torque of 330 15 lb.ft. (447 20 N m).c) Tighten bolts (22) through (25) in number sequence again to a torque of 330 15 lb.ft. (447 20 N m). 9. Install support (19) and bracket (20). Tighten the bolts finger tight. Tighten the bolt that holds support (19) to the automatic timing advance housing and bracket (20) to the fuel injection pump housing to standard torque.10. Install the remainder of the 3/8" head bolts (21). Tighten all of the 3/8" head bolts (21) to a torque of 32 5 lb.ft. (43 7 N m).11. Do Steps 11a through 11c for the left hand cylinder head only. a) Install plate (28) and ether start line (27).b) Connect ether start line to fittings (26) and (29). c) Fasten wire harness clip (30) to the cylinder head.12. Do Steps 12a through 12c for the right hand cylinder head only. a) Connect the wire assembly for the two sensor units.b) Connect the air line to the fuel ratio control.c) Connect the two fuel lines.13. Make an adjustment of the valves to have a clearance of 0.15 in. (0.38 mm) for intake and 0.30 in. (0.76 mm) for exhaust valves. See VALVE CLEARANCE SETTING in TESTING AND ADJUSTING.end by:a) install water temperature regulators (later)b) install turbochargerc) install muffler


Parts down Suzuki:

48831-87D00
 
48831-87D00 DOWN PRESSURE VALVE CASE
DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR, DT150T
Back to top