68111-43400-1RR EMBLEM, SUZUKI Suzuki
DT6, DT8MCLS, DT8MCLT, DT8MCLV, DT8MCSR, DT8MCSS, DT8MCST, DT8MCSV, DT8MSLR, DT9.9 CELK, DT9.9CELJ, DT9.9CELL, DT9.9CELM, DT9.9CELN, DT9.9CELP, DT9.9CELR, DT9.9CELS, DT9.9CELT, DT9.9CENK, DT9.9CESJ, DT9.9CESK, DT9.9CESL, DT9.9CESM, DT9.9CESN, DT9.9CE
EMBLEM
Price: query
Rating:
Compatible models:
DT6
DT8MCLS
DT8MCLT
DT8MCLV
DT8MCSR
DT8MCSS
DT8MCST
DT8MCSV
DT8MSLR
DT9.9 CELK
DT9.9CELJ
DT9.9CELL
DT9.9CELM
DT9.9CELN
DT9.9CELP
DT9.9CELR
DT9.9CELS
DT9.9CELT
DT9.9CENK
DT9.9CESJ
DT9.9CESK
DT9.9CESL
DT9.9CESM
DT9.9CESN
DT9.9CESP
DT9.9CESR
DT9.9CESS
DT9.9CEST
DT9.9CNELP
DT9.9CNELR
DT9.9CNELS
DT9.9CNELT
DT9.9CNEXP
DT9.9CNEXR
DT9.9CNEXS
DT9.9CNEXT
DT9.9CNEXV
DT9.9CNJ
DT9.9CNK
DT9.9CNL
DT9.9CNLN
DT9.9MCLJ
DT9.9MCLK
DT9.9MCLL
DT9.9MCLM
DT9.9MCLN
DT9.9MCLP
DT9.9MCLR
DT9.9MCLS
DT9.9MCLT
DT9.9MCLV
DT9.9MCNLR
DT9.9MCNLT
DT9.9MCNLV
DT9.9MCSJ
DT9.9MCSK
DT9.9MCSL
DT9.9MCSM
DT9.9MCSN
DT9.9MCSP
DT9.9MCSR
DT9.9MCSS
DT9.9MCST
DT9.9MCSV
Suzuki
Suzuki entire parts catalog list:
- ENGINE COVER (MODEL:94) » 68111-43400-1RR
- ENGINE COVER (MODEL:95~97) » 68111-43400-1RR
- ENGINE COVER » 68111-43400-1RR
- ENGINE COVER » 68111-43400-1RR
- ENGINE COVER » 68111-43400-1RR
- ENGINE COVER » 68111-43400-1RR
- ENGINE COVER » 68111-43400-1RR
- ENGINE COVER » 68111-43400-1RR
- ENGINE COVER » 68111-43400-1RR
- ENGINE COVER » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
- ENGINE COVER 94-97 » 68111-43400-1RR
Information:
2. Remove two braces (1).3. Disconnect two clips (2).4. Disconnect water temperature sending unit (3).5. Remove water temperature regulator. See the topic Remove Water Temperature Regulator in this module.6. Put identification marks on two hoses (5), disconnect and move them out of the way.7. Loosen clamp (6). Remove four bolts (4) and water line (7). 8. Disconnect line (8) from fitting (9).9. Remove two bolts (10). 10. Remove bolts (11) that hold the cylinder head to the block.11. Remove two mounting brackets (12).12. Attach a hoist to the cylinder head and remove the cylinder head and the exhaust manifold as a unit. The weight of the unit is approximately 180 kg (396 lb.).13. Remove the exhaust manifold from the cylinder head. See the topic, Remove Exhaust Manifold in this module.14. Remove the fuel injection nozzles. See the topic, Remove Fuel Injection Nozzles in this module.15. Remove the spacer plate. See the topic Remove Spacer Plate in this module.Install Cylinder Head Assembly
1. Install the spacer plate. See the topic, Install Spacer Plate in this module.2. Install the exhaust manifold. See the topic, Install Exhaust Manifold in this module.3. Install fuel injection nozzles. See the topic, Install Fuel Injection Nozzles in this module. 4. Attach a hoist to the cylinder head assembly. Put the cylinder head assembly in position on the engine.5. Install two mounting brackets (12).6. Put 2P2506 Thread Lubricant on all cylinder head bolts (11) and install them until they are finger tight.
Typical Example7. Install push rods (15). Make sure they are installed in their original locations. Be sure the push rods are in position in the valve lifters.8. Loosen the adjusting screws on the rocker arms for valve clearance. This will prevent a bent valve or push rod during installation of the rocker shaft assembly.9. Install a new O-ring seal in the rear rocker arm support bracket.10. Put 2P2506 Thread Lubricant on all of the rocker shaft bolts except the one that goes through the rear rocker arm support bracket.11. Put the rocker shaft assembly in position on the cylinder head assembly. Make sure the dowels in the support brackets are in the dowel holes in the cylinder head assembly and the rocker arms are engaged with the push rods. Install the bolts that hold the rocker shaft assembly until they are finger tight. 12. Hand tighten the large size cylinder head and rocker shaft bolts in the numbered sequence shown as follows:a. Tighten the bolts in the numbered sequence to a torque of 156 N m (115 lb ft).b. Tighten the bolts in the numbered sequence to a torque of 250 17 N m (185 13 lb ft).c. Tighten the bolts in the numbered sequence again to a torque of 250 17 N m (185 13 lb ft).13. Hand tighten the small size cylinder head bolts, in the lettered sequence shown to a torque of 43 7 N m (32 5 lb ft).14. The assembled length of springs (14) at both ends of the rocker shaft assembly must be 1.50 0.25 mm (.059 .010 in.). Remove or install the washers behind the springs to obtain the correct assembled length of the springs.15. Make an adjustment to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.64 mm (.025 in.). Tighten the nuts on adjustment screws (12) to a torque of 29 7 N m (21 5 lb ft). For the complete valve adjustment procedure, see Valve Clearance in Testing And Adjusting. 16. Install two bolts (10). 17. Attach line (8) to fitting (9).18. Install the gasket between air line (16) and the cylinder head.19. Install air line (16) with seven bolts (17).
Typical Example20. Install the gaskets that go between water line (7) and the water pump and between the water line and the cylinder head.21. Install water line (7) with four bolts (4).22. Position clamp (6) and tighten.23. Attach two water lines (5) and tighten the clamps.24. Connect water temperature sending unit (3) to the cylinder head.25. Install the water temperature regulator. See the topic, Install Water Temperature Regulator in this module.26. Install two clips (2).27. Install two braces (1).28. Refill the cooling system to the correct level. See the Maintenance Manual.End By:a. install turbochargerb. install air cleaner housingc. install valve coverd. install fuel injection lines.
1. Install the spacer plate. See the topic, Install Spacer Plate in this module.2. Install the exhaust manifold. See the topic, Install Exhaust Manifold in this module.3. Install fuel injection nozzles. See the topic, Install Fuel Injection Nozzles in this module. 4. Attach a hoist to the cylinder head assembly. Put the cylinder head assembly in position on the engine.5. Install two mounting brackets (12).6. Put 2P2506 Thread Lubricant on all cylinder head bolts (11) and install them until they are finger tight.
Typical Example7. Install push rods (15). Make sure they are installed in their original locations. Be sure the push rods are in position in the valve lifters.8. Loosen the adjusting screws on the rocker arms for valve clearance. This will prevent a bent valve or push rod during installation of the rocker shaft assembly.9. Install a new O-ring seal in the rear rocker arm support bracket.10. Put 2P2506 Thread Lubricant on all of the rocker shaft bolts except the one that goes through the rear rocker arm support bracket.11. Put the rocker shaft assembly in position on the cylinder head assembly. Make sure the dowels in the support brackets are in the dowel holes in the cylinder head assembly and the rocker arms are engaged with the push rods. Install the bolts that hold the rocker shaft assembly until they are finger tight. 12. Hand tighten the large size cylinder head and rocker shaft bolts in the numbered sequence shown as follows:a. Tighten the bolts in the numbered sequence to a torque of 156 N m (115 lb ft).b. Tighten the bolts in the numbered sequence to a torque of 250 17 N m (185 13 lb ft).c. Tighten the bolts in the numbered sequence again to a torque of 250 17 N m (185 13 lb ft).13. Hand tighten the small size cylinder head bolts, in the lettered sequence shown to a torque of 43 7 N m (32 5 lb ft).14. The assembled length of springs (14) at both ends of the rocker shaft assembly must be 1.50 0.25 mm (.059 .010 in.). Remove or install the washers behind the springs to obtain the correct assembled length of the springs.15. Make an adjustment to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.64 mm (.025 in.). Tighten the nuts on adjustment screws (12) to a torque of 29 7 N m (21 5 lb ft). For the complete valve adjustment procedure, see Valve Clearance in Testing And Adjusting. 16. Install two bolts (10). 17. Attach line (8) to fitting (9).18. Install the gasket between air line (16) and the cylinder head.19. Install air line (16) with seven bolts (17).
Typical Example20. Install the gaskets that go between water line (7) and the water pump and between the water line and the cylinder head.21. Install water line (7) with four bolts (4).22. Position clamp (6) and tighten.23. Attach two water lines (5) and tighten the clamps.24. Connect water temperature sending unit (3) to the cylinder head.25. Install the water temperature regulator. See the topic, Install Water Temperature Regulator in this module.26. Install two clips (2).27. Install two braces (1).28. Refill the cooling system to the correct level. See the Maintenance Manual.End By:a. install turbochargerb. install air cleaner housingc. install valve coverd. install fuel injection lines.
Parts emblem Suzuki:
61441-98620
61441-98620 EMBLEM, SUZUKI
DT2LH, DT2LJ, DT2LK, DT2LL, DT2SH, DT2SJ, DT2SK, DT2SL, DT2SM, DT2SN, DT2SP, DT6, DT8CENK, DT8CENL, DT8CLK, DT8CLL, DT8CLM, DT8CNK, DT8CNL, DT8CSL, DT8CSM, DT8MCLN, DT8MCLP, DT8MCSN, DT8MCSP, DT8SCK, DT9.9 CELK, DT9.9CELJ, DT9.9CELL, DT9.9CELM, DT9.9
68111-47C00-019