65850-93000 Suzuki Gauge, Fuel


65850-93000 Gauge, Fuel Suzuki 20ELB, 20ELC, 25ELB, 25ELC, DT14C, DT14D, DT16LB, DT16LC, DT16LN, DT16SB, DT16SC, DT16SN, DT20ESB, DT20ESC, DT20MLB, DT20MLC, DT20MSB, DT20MSC, DT25ESB, DT25ESC, DT25MLB, DT25MLC, DT25MSB, DT25MSC Gauge
65850-93000 Gauge, Fuel Suzuki
Rating:
33

Buy Gauge, Fuel 65850-93000 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 2
 

Suzuki entire parts catalog list:

20ELB 1977
20ELC 1978
25ELB 1977
25ELC 1978
DT14C 1977
DT14D 1978
DT16LB 1977
DT16LC 1978
DT16LN 1979
DT16SB 1977
DT16SC 1978
DT16SN 1979
DT20ESB 1977
DT20ESC 1978
DT20MLB 1977
DT20MLC 1978
DT20MSB 1977
DT20MSC 1978
DT25ESB 1977
DT25ESC 1978
DT25MLB 1977
DT25MLC 1978
DT25MSB 1977
DT25MSC 1978

Information:

If a 261-11 diagnostic code is active, verify that the wiring is installed correctly to the engine speed/timing sensors.The ECM has the ability to calibrate the mechanical differences between the Top Center (TC) of the flywheel and the TC of the timing gear on the camshaft. A magnetic transducer signals the TC of the flywheel to the ECM when a notch on a counterweight passes by the transducer. The engine speed/timing sensor signals the TC of the timing gear to the ECM. Any offset between the TC of the flywheel and the TC of the timing gear is stored into the memory of the ECM.Note: A timing calibration will not increase the available engine power.Table 2 lists the special tools that are required in order to perform this procedure.
Table 2
Required Special Tools
Part Number Description
7X-1171 Transducer Adapter
6V-2197 Transducer
7X-1695 Cable As
170-3519 Harness (1)
(1) This item is not required if the engine harness has a connector for timing calibration.
Install the Transducer Adapter.
Remove the electrical power from the ECM.
Use the appropriate engine turning tool to put either the No. 1 piston or the No. 6 piston at top center. Refer to the Systems Operation/Testing and Adjusting.
Refer to Table 3. After the top center position has been located, rotate the crankshaft for the number of degrees that is applicable to your engine model. Be sure to rotate the crankshaft in the direction of rotation that is specified in the Table.
Table 3
Crankshaft Rotation
Engine Model Number of Degrees Direction of Rotation
C7 100 Normal Rotation
C-9 85 Normal Rotation
C-10 60 Opposite Normal Rotation
C11 75 Normal Rotation
C-12 60 Opposite Normal Rotation
C13 75 Normal Rotation
C-15 60 Opposite Normal Rotation
C15 60 Opposite Normal Rotation
C-16 60 Opposite Normal Rotation
C18 30 Opposite Normal Rotation
Refer to Table 4. Locate the engine's timing calibration port.
Table 4
Location of the Timing Calibration Port
Engine Model Crankshaft Counterweight Engine Location
C7 3 Left Side
C-9 3 Left Side
C-10 8 Right Side
C11 8 Left Side
C-12 8 Right Side
C13 8 Left Side
C-15 2 Left Side
C15 2 Left Side
C-16 2 Left Side
C18 2 Left Side
Remove the plug from the timing calibration port.
Thread the transducer adapter into the port. Continue to the next test step.
Install the Transducer.
If the crankshaft is not in the correct position when the transducer is installed, the transducer will be damaged when the engine is started.
Apply clean engine oil to a 2D-6392 O-Ring Seal. Install the O-ring seal on the end of the 6V-2197 Transducer.
Push the transducer through the transducer adapter until the transducer contacts the crankshaft counterweight.
Withdraw the transducer 1.0 mm (0.04 inch) and hand tighten the nut on the adapter sleeve in order to secure the transducer. Move the O-ring seal against the adapter. Continue to the next test step.
Connect the 7X-1695 Cable As.
If the engine harness is equipped with a connector for timing calibration, connect the 7X-1695 Cable As to the connector for timing calibration and to the transducer.
If the engine harness is not equipped with a connector for timing calibration, perform the following procedure: Disconnect the P2 connector from the ECM.Determine the number of terminals on the P2 connector.Refer to Table 5. Remove the sealing plugs from the appropriate terminals. Do not discard the sealing plugs. The sealing plugs may be reinstalled when the timing calibration is complete.
Table 5
P2 Locations for Connection of the 7X-1695 Cable As
Wire Color 70 pin Connector 120 pin Connector
White 22 26
Yellow 23 36 Install the WH(White) wire of the 170-3519 Harness into the appropriate location.Install the YL(Yellow) wire of the 170-3519 Harness into the appropriate location. Disregard the pin-outs on the label of the harness.Note: Ensure that each wire is installed into the correct location. The timing calibration will not be successful if the wires are installed incorrectly.Connect the J2/P2 connec


Parts gauge Suzuki:

65850-93002
 
65850-93002 Gauge Assembly, Fuel
20ELB, 20ELC, 20ELN, 25ELB, 25ELC, 25ELN, DT14C, DT14D, DT16LB, DT16LC, DT16LN, DT16SB, DT16SC, DT16SN, DT20ESB, DT20ESC, DT20ESN, DT20MLB, DT20MLC, DT20MLN, DT20MSB, DT20MSC, DT20MSN, DT25ESB, DT25ESC, DT25ESN, DT25MLB, DT25MLC, DT25MLN, DT25MSB, DT
65850-95200
 
65850-95200 Gauge Assembly, Fuel
20ELB, 20ELC, 20ELN, 25ELB, 25ELC, 25ELN, DT14F, DT16LB, DT16LC, DT16LN, DT16SB, DT16SC, DT16SN, DT20ESB, DT20ESC, DT20ESN, DT20MLB, DT20MLC, DT20MLN, DT20MSB, DT20MSC, DT20MSN, DT25ESB, DT25ESC, DT25ESN, DT25MLB, DT25MLC, DT25MLN, DT25MSB, DT25MSC,
65850-95201
 
65850-95201 Gauge Assembly, Fuel, S Mark
20ELB, 20ELC, 20ELN, 25ELB, 25ELC, 25ELN, DT14F, DT16LB, DT16LC, DT16LN, DT16LT, DT16LT, DT16LT, DT16SB, DT16SC, DT16SN, DT16ST, DT16ST, DT16ST, DT20ESB, DT20ESC, DT20ESN, DT20MLB, DT20MLC, DT20MLN, DT20MSB, DT20MSC, DT20MSN, DT25ESB, DT25ESC, DT25ES
Back to top