63111-96100-01J Suzuki Handle, Tiller


63111-96100-01J Handle, Tiller Suzuki DT3.5LN, DT3.5LT, DT3.5LX, DT3.5LZ, DT3.5SN, DT3.5ST, DT3.5SX, DT3.5SZ, DT5LC, DT5LN, DT5SC, DT5SN, DT7.5LB, DT7.5LC, DT7.5LN, DT7.5SB, DT7.5SC, DT7.5SN, DT9C, DT9D, DT9F Handle
63111-96100-01J Handle, Tiller Suzuki
Rating:
33

Buy Handle, Tiller 63111-96100-01J Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 1
 

Suzuki entire parts catalog list:

DT3.5LN 1979
DT3.5LT 1980
DT3.5LX 1981
DT3.5LZ 1982
DT3.5SN 1979
DT3.5ST 1980
DT3.5SX 1981
DT3.5SZ 1982
DT5LC 1978
DT5LN 1979
DT5SC 1978
DT5SN 1979
DT7.5LB 1977
DT7.5LC 1978
DT7.5LN 1979
DT7.5SB 1977
DT7.5SC 1978
DT7.5SN 1979
DT9C 1977
DT9D 1978
DT9F 1979

Information:


Table 1
Required Tools
Tool Part Number Part Description Qty
A 370-4653 Counterweight Tool 1
B 4C-5597 Anti-Seize Compound 1
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Illustration 1 g06368233
Ensure that turbocharger (3) is clean and free from damage. Inspect the turbocharger for wear. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If any part of the turbocharger is worn or damaged, the complete turbocharger must be replaced.
Test wastegate actuator (32) for correct operation. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If any part of the wastegate actuator is worn or damaged, the complete turbocharger must be replaced.
Illustration 2 g06368135
Clean the gasket surface of exhaust manifold (28). If necessary, install studs (31) to turbocharger (3). Tighten the studs to a torque of 18 N m (160 lb in).
Install a new gasket (30) to studs (31).
Position turbocharger (3) onto the exhaust manifold and install nuts (29) finger tight. The nuts (29) should not prevent the turbocharger or prevent Tooling (A) from correctly positioning the turbocharger onto the exhaust manifold.
Use Tooling (A) to align turbocharger (3).Note: Ensure that the turbocharger is correctly oriented.
Illustration 3 g06368245
Turbocharger tightening sequence viewed from the exhaust manifold.
Tighten nuts (29) in the sequence shown in Illustration 3 to a torque of 44 N m (32 lb ft).
Remove Tooling (A) from turbocharger (3).
Illustration 4 g06367565
Remove plugs and caps from tube assembly (15) and tube assembly (18). Ensure that the tube assemblies are clean and free from damage. Replace any damaged components.
Position a new gasket (16) (not shown) onto tube assembly (18).
Install bolts (17) to tube assembly (18). Tighten the bolts to a torque of 22 N m (195 lb in).
Illustration 5 g06368142
Position a new gasket (20) (not shown) onto tube assembly (21) and install bolts (22).Note: Holes in the gasket have serration that holds the bolts captive.
Remove plug from oil filter base (23) for oil feed tube assembly (21).
Illustration 6 g06368143
Align tube nut (24) on oil filter base (23). Tighten bolts (22) and tube nut (24) finger tight.
Tighten bolts (22) to a torque of 22 N m (195 lb in). Tighten tube nut (24) to a torque of 45 N m (33 lb ft).
Install bolt (25) and bolt (27) into clamp (26). Tighten the bolt (25) and bolt (27) finger tight.
Illustration 7 g06368254
Remove the plug from oil inlet port (X). Lubricate the turbocharger bearings with clean engine oil through the oil inlet port (X). Rotate the wheel of the compressor several times to lubricate the bearings.
Install new O-rings (14) to tube assembly (15). Install the banjo bolt (13) to tube assembly (15).
Position tube assembly (15) onto turbocharger (3) and tube assembly (21), Align tube nut (21A) onto turbo assembly (21). Tighten the banjo bolt to a torque of 20 N m (177 lb in) and the tube nut to a torque of 45 N m (33 lb ft).
Illustration 8 g06367509
Use Tooling (B) to lubricate the allen head bolt for V-band clamp (5). Position V-band clamp (5) onto air duct (9).
Position hose assembly (10) and air duct (9) onto the outlet of turbocharger (3) and the turbocharger (19). Ensure that V-band clamp (5) is correctly seated on the air duct (9) and turbocharger (3).
Tighten the allen head bolt for V-band clamp (5) to a torque of 12 N m (106 lb in).
Tighten hose clamps (11) to a torque of 6 N m (53 lb in).
Use Tooling (B) to lubricate the nut for V-band clamp (12). Position V-band clamp (12) onto the turbocharger (19).
Use Tooling (B) to lubricate the nut for V-band clamp (2). Position V-band clamp (2) onto elbow (1).
Position elbow (1) onto the turbocharger (19) and turbocharger (3).
Tighten nuts for V-band clamp (2) and nuts for V-band clamp (12) finger tight. Ensure that the V-band clamps are seated correctly onto the turbochargers.
Tighten nuts for V-band clamp (2) and nuts for V-band clamp (12) to a torque of 12 N m (106 lb in).
Connect hose assembly (8) to the wastegate actuator (7). Slide clip (8) (not shown) along the hose assembly ensure that t


Parts handle Suzuki:

41212-99000-01J
 
41212-99000-01J Handle, Clamp
DT4.5LB, DT4.5SB, DT4D, DT5LC, DT5LN, DT5LT, DT5LX, DT5LZ, DT5SC, DT5SN, DT5ST, DT5SX, DT5SZ, DT7.5LB, DT7.5LC, DT7.5LN, DT7.5SB, DT7.5SC, DT7.5SN, DT8LT, DT8LX, DT8LZ, DT8ST, DT8SX, DT8SZ, DT9C, DT9D, DT9F
63111-98500-01J
 
63111-98500-01J Handle, Tiller
DT5LC, DT5LN, DT5SC, DT5SN
Back to top