18186-92D00 Suzuki HOLDER GUIDE


18186-92D00 HOLDER GUIDE Suzuki DT8CENK, DT8CENL, DT8CLJ, DT8CLK, DT8CLL, DT8CLM, DT8CNK, DT8CNL, DT8CSJ, DT8CSL, DT8CSM, DT8MCLN, DT8MCLP, DT8MCLS, DT8MCLT, DT8MCLV, DT8MCSN, DT8MCSP, DT8MCSR, DT8MCSS, DT8MCST, DT8MCSV, DT8MSLR, DT8SCK, DT9.9 CELK, DT9.9CELJ, DT9.9CELL, DT9.9CELM, HOLDER
18186-92D00 HOLDER GUIDE Suzuki
Rating:
103

Buy HOLDER GUIDE 18186-92D00 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 13
 

Suzuki entire parts catalog list:

DT8CENK 1989
DT8CENL 1990
DT8CLJ 1988
DT8CLK 1989
DT8CLL 1990
DT8CLM 1991
DT8CNK 1989
DT8CNL 1990
DT8CSJ 1988
DT8CSL 1990
DT8CSM 1991
DT8MCLN 1992
DT8MCLP 1993
DT8MCLS 1995
DT8MCLT 1996
DT8MCLV 1997
DT8MCSN 1992
DT8MCSP 1993
DT8MCSR 1994
DT8MCSS 1995
DT8MCST 1996
DT8MCSV 1997
DT8MSLR 1994
DT8SCK 1989
DT9.9 CELK 1989
DT9.9CELJ 1988
DT9.9CELL 1990
DT9.9CELM 1991
DT9.9CELN 1992
DT9.9CELP 1993
DT9.9CELR 1994
DT9.9CELS 1995
DT9.9CELT 1996
DT9.9CENK 1989
DT9.9CESJ 1988
DT9.9CESK 1989
DT9.9CESL 1990
DT9.9CESM 1991
DT9.9CESN 1992
DT9.9CESP 1993
DT9.9CESR 1994
DT9.9CESS 1995
DT9.9CEST 1996
DT9.9CNELP 1993
DT9.9CNELR 1994
DT9.9CNELS 1995
DT9.9CNELT 1996
DT9.9CNEXP 1993
DT9.9CNEXR 1994
DT9.9CNEXS 1995
DT9.9CNEXT 1996
DT9.9CNEXV 1997
DT9.9CNJ 1988
DT9.9CNK 1989
DT9.9CNL 1990
DT9.9CNLN 1992
DT9.9MCLJ 1988
DT9.9MCLK 1989
DT9.9MCLL 1990
DT9.9MCLM 1991
DT9.9MCLN 1992
DT9.9MCLP 1993
DT9.9MCLR 1994
DT9.9MCLS 1995
DT9.9MCLT 1996
DT9.9MCLV 1997
DT9.9MCNLR 1994
DT9.9MCNLT 1996
DT9.9MCNLV 1997
DT9.9MCSJ 1988
DT9.9MCSK 1989
DT9.9MCSL 1990
DT9.9MCSM 1991
DT9.9MCSN 1992
DT9.9MCSP 1993
DT9.9MCSR 1994
DT9.9MCSS 1995
DT9.9MCST 1996
DT9.9MCSV 1997

Information:


Table 1
Required Tools    
Tool    Part Number    Part Description    Qty    
A     6V-6192     Pliers     1    
B     7B-7974     Piston Ring Expander Gp     1    
C     5P-8639     Hydraulic Press (Connecting Rod Bearing)     1    
8F-0024 Hose Assembly     1    
1P-2375 Connecting Coupler     1    
1P-2376 Connecting Coupler     1    
5P-8651 Spacer     1    
5P-8649 Adapter     1    
5P-8650 Bushing Adapter     1    
9U-6600 Hydraulic Pump     1    Note: Prior to removal from the engine, the pistons and connecting rod assemblies were marked. The components must be reassembled together. The components must be installed in the original location in the engine. Do not interchange any of the components.
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Illustration 1 g01017742
Illustration 2 g01018268
The connecting rod must be heated for the installation of the piston pin bearing. Do not use a torch.
Raise the temperature of connecting rod (6) along Length (Y) . (Y) Maximum Length for heating the connecting rod ... 93 mm (3.7 inch)
Allow the connecting rod and the bearing to cool to room temperature.
Use Tooling (C) to remove the old bearing and install new bearing (7) at the same time. The adapter of Tooling (C) should make full contact with the surfaces of connecting rod (6) .Note: Orient the bearing joint within 5 degrees of either Location (X) .
Use a pin boring machine to machine the bore of bearing (7) to the correct diameter.Diameter of bearing bore ... 60.035 0.008 mm (2.3636 0.0003 inch)
Illustration 3 g01056145
Position the spring for the oil control ring in the oil ring groove in the piston body assembly.
Position oil control ring (3) over the spring. Position the oil control ring so that the gap is 180 degrees from the joint in the spring. Install the oil control ring on the piston with Tooling (B) .
Use Tooling (B) to install intermediate piston ring (2) with the side that has the identification "UP-2" toward the top of the piston.
Use Tooling (B) to install top piston ring (1) with the side that has the identification "UP-1" toward the top of the piston.
Position piston rings (1) , (2) , and (3) so the gaps are 120 degrees from each other.
Check the clearance between the ends of piston rings (1) , (2) , and (3) . Refer to Specifications, "Pistons And Rings".
Position piston body assembly (4) on connecting rod (6) . Apply clean engine oil to connecting rod pin (8) and install the connecting rod pin. Install pin retainer (5) with Tooling (A) .
Install upper connecting rod bearing (9) in connecting rod (6) .Note: Ensure that the bearing locking tab is located in the notch of the connecting rod.
Install lower connecting rod bearing (10) in connecting rod cap (11) .Note: Ensure that the bearing locking tab is located in the notch of the connecting rod cap.
Ensure that the dowels are installed in the connecting rod cap.End By: Install the pistons and connecting rods. Refer to Disassembly and Assembly, "Pistons and Connecting Rods - Install".


Parts holder Suzuki:

67256-95600
 
67256-95600 Holder, neutral lock
30ELE, 30ESE, 30MLE, DF15, DF15, DF15, DF150, DF150, DF150, DF150TX, DF150ZX, DF15A, DF15S, DF175, DF175, DF175, DF175TX, DF175ZX, DF200, DF200, DF200, DF200T, DF200Z, DF20A, DF225, DF225, DF225, DF225T, DF225Z, DF25, DF25(R)S, DF250, DF250, DF250, D
09408-00043
 
09408-00043 HOLDER, FUSE CASE
DT115, DT140, DT8CENK, DT8CENL, DT8CLJ, DT8CLK, DT8CLL, DT8CLM, DT8CNK, DT8CNL, DT8CSJ, DT8CSL, DT8CSM, DT8MCLN, DT8MCLP, DT8MCLS, DT8MCLT, DT8MCLV, DT8MCSN, DT8MCSP, DT8MCSR, DT8MCSS, DT8MCST, DT8MCSV, DT8MSLR, DT8SCK, DT9.9 CELK, DT9.9CELJ, DT9.9CE
18295-92D00
 
18295-92D00 HOLDER CABLE
DT8CENK, DT8CENL, DT8CLJ, DT8CLK, DT8CLL, DT8CLM, DT8CNK, DT8CNL, DT8CSJ, DT8CSL, DT8CSM, DT8MCLN, DT8MCLP, DT8MCLS, DT8MCLT, DT8MCLV, DT8MCSN, DT8MCSP, DT8MCSR, DT8MCSS, DT8MCST, DT8MCSV, DT8MSLR, DT8SCK, DT9.9 CELK, DT9.9CELJ, DT9.9CELL, DT9.9CELM,
Back to top