09491-29006 Suzuki Jet, main 145


09491-29006 Jet, main 145 Suzuki DT115, DT140, DT65CRLJ, DT65CRLK, DT65CRLL, DT65HTCLK, DT65HTCLL, DT65TCLJ, DT65TCLK, DT65TCLL, DT65TCLM, DT65TCLN, DT65TCLP, DT65TCLR, DT65TCLS, DT65TCLT, DT65TCLV, DT75TCLG, DT75TCLH Jet
09491-29006 Jet, main 145 Suzuki
Rating:
8

Buy Jet, main 145 09491-29006 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 30
 

Suzuki entire parts catalog list:

DT115 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001
DT140 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001
DT65CRLJ 1988
DT65CRLK 1989
DT65CRLL 1990
DT65HTCLK 1989
DT65HTCLL 1990
DT65TCLJ 1988
DT65TCLK 1989
DT65TCLL 1990
DT65TCLM 1991
DT65TCLN 1992
DT65TCLP 1993
DT65TCLR 1994
DT65TCLS 1995
DT65TCLT 1996
DT65TCLV 1997
DT75TCLG 1986
DT75TCLH 1987

Information:

1. Remove the bolts and the plate from the side of the fuel injection pump housing.2. Install Tool (A) in the fuel injection pump housing. Move the rack until Tool (A) can be installed to hold the rack in the center position. The rack must be in the center position to remove the fuel injection pumps.3. Use Tool (B) to remove bushing (1) from the fuel injection pump housing.4. Remove the O-ring seal from the fuel injection pump housing. Spacers (2) are the same thickness for each fuel injection pump so they can be mixed. The fuel injection pump plungers and barrels are sets and can not be mixed.5. Install Tool (C) on the bonnet, and remove the fuel injection pump. 6. Remove spacer (2) from the fuel injection pump housing.7. Do Steps 3 through 6 to remove the other fuel injection pumps.Install Fuel Injection Pumps
1. Install spacer (1) in the fuel injection pump housing. 2. Install Tool (A) in the fuel injection pump housing. Move the rack until Tool (A) can be installed to hold the rack in the center position. The rack must be in the center position to install the fuel injection pumps.3. Turn the camshaft until the lobe of the camshaft is down for the pump to be installed.4. Install Tool (B) on the bonnet of the fuel injection pump.5. Install the fuel injection pump in the pump housing with saw cut (slot) (3) in the gear in alignment with the small pin (2) and groove (4) in the barrel in alignment with dowel (5) in the pump housing. 6. Put clean oil on O-ring seal (6), and install it in the fuel injection pump housing.7. Install the bushing by hand until it is even with the top of the housing. If the bushing can not be installed this far by hand, remove it. Remove the fuel injection pump, and put the pump in alignment again, and install the bushing again. 8. Install Tool (C) on the bushing and tighten the bushing to a torque of 163 14 N m (120 10 lb ft). 9. Install Tooling (D) to measure total rack travel. Correct rack travel is 15.70 mm (.618 in). A smaller measurement is an indication of incorrect fuel injection pump installation.10. Do Steps 1 through 9 again for installation of the other fuel pumps.11. Install the cover and gasket on the fuel injection pump housing.End By:a. install governorDisassemble Fuel Injection Pumps
Start By:a. remove fuel injection pumps FLUID SPILLAGE CONTAINMENT Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the machine. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to "TOOLS AND SHOP PRODUCT GUIDE, NENG2500", for tools and supplies suitable to collect and contain fluids in Caterpillar machines. Dispose fluids according to local regulations and mandates.
Be careful when the injection pumps are disassembled. Do not damage the surfaces of the plungers, barrels and bonnets. Any scratches will cause leakage inside the fuel injection pump. The plunger and barrel for each pump are made as a set. Do not put the plunger of one pump in the barrel of another pump. If one part has wear, install a complete new pump assembly. Be careful when the plunger is put into the bore of the barrel.
1. Pull plunger (1) and washer (5) out of barrel (3) and spring (2).2. Remove washer (5) from plunger (1).
Do not remove the gear from the plunger. The gear and plunger are assembled and adjusted at the factory.
3. Remove spring (2) from barrel (3).4. Remove ring (6), and separate barrel (3) and bonnet (4). 5. Remove check assembly (7) and spring (8) from bonnet (4). If check assembly (7) is disassembled, do not mix parts with parts from another check assembly.Assemble Fuel Injection Pumps
Put clean fuel oil on all parts during assembly.
1. Install spring (2) and check assembly (1) in bonnet (3). 2. Install bonnet (3) on barrel (4). Install ring (5) to hold them together.
Do not slide bonnet (3) across barrel (4) because check assembly (1) in the bonnet can damage the face of barrel (4).
3. Install spring (8) on barrel (4).4. Install washer (7) on plunger (6) with the flat side toward the gear on the plunger.5. Install plunger (6) in barrel (4) until washer (7) is engaged in the spring.End By:a. install fuel injection pumps


Parts jet Suzuki:

09491-26009
 
09491-26009 Jet, main 130
20ELB, 20ELC, 20ELN, DT15 MLE, DT15ELD, DT15ELE, DT15ELF, DT15ELG, DT15ELH, DT15ELJ, DT15ESD, DT15ESE, DT15ESF, DT15ESG, DT15ESH, DT15ESJ, DT15MLD, DT15MLF, DT15MLG, DT15MLH, DT15MLJ, DT15MSD, DT15MSE, DT15MSF, DT15MSG, DT15MSH, DT15MSJ, DT20ELG, DT2
09491-27008
 
09491-27008 Jet main 135
20ELB, 20ELC, 20ELN, DT20ESB, DT20ESC, DT20ESN, DT20MLB, DT20MLC, DT20MLN, DT20MSB, DT20MSC, DT20MSN, DT50ECLE, DT50MCLE, DT75TCLD, DT75TCLE, DT75TCLF, DT75TCLG, DT75TCLH, DT75TCLJ, DT75TCLK, DT75TCLL, DT75TCLM, DT75TCLN, DT75TCLP, DT75TCLR, DT75TCLS
09491-32008
 
09491-32008 Jet, main
DT115, DT140, DT50, DT50, DT50M, DT50W, DT65, DT65, DT85ELT, DT85TCLD, DT85TCLE, DT85TCLF, DT85TCLT, DT85TCLX, DT85TCLZ, DT85TELN, DT85TELT
09492-85001
 
09492-85001 JET, PILOT (85)
30ELE, 30ESE, 30MLE, DT115, DT140, DT30ELD, DT30ESD, DT30LF, DT30MLD, DT30MSD, DT30MSE, DT30SF, DT50, DT50, DT50ECLE, DT50M, DT50MCLE, DT50W, DT65, DT65, DT8CENK, DT8CENL, DT8CLJ, DT8CLK, DT8CLL, DT8CLM, DT8CNK, DT8CNL, DT8CSJ, DT8CSL, DT8CSM, DT8MCL
09491-31007
 
09491-31007 JET, MAIN (157.5)
DT115, DT140, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT15
09492-80003
 
09492-80003 Jet, Pilot 80
DT35ELT, DT35ELX, DT35ELZ, DT35EST, DT35ESX, DT35ESZ, DT35MLT, DT35MLX, DT35MLZ, DT35MST, DT35MSX, DT35MSZ, DT40, DT40ELT, DT40ELX, DT40ELZ, DT40EST, DT40ESX, DT40ESZ, DT40MLT, DT40MLX, DT40MLZ, DT40MSX, DT40MSZ, DT60CLD, DT65CRLG, DT65CRLH, DT65CRSG
09491-30010
 
09491-30010 JET, MAIN (150)
DT115, DT140, DT25C, DT30C, DT65CRLJ, DT65CRLK, DT65CRLL, DT65HTCLK, DT65HTCLL, DT65TCLJ, DT65TCLK, DT65TCLL, DT65TCLM, DT65TCLN, DT65TCLP, DT65TCLR, DT65TCLS, DT65TCLT, DT65TCLV
09491-32013
Back to top