08310-12102 Suzuki Nut


08310-12102 Nut Suzuki DT75TCLG, DT75TCLH Nut
08310-12102 Nut Suzuki
Rating:
78

Buy Nut 08310-12102 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 24
 

Compatible models:

Suzuki entire parts catalog list:

DT75TCLG 1986
DT75TCLH 1987

Information:

The Disassembly and Assembly in this book was done on a fuel system for a 6 cylinder engine. The photographs will be different, but the procedures are basically the same. 1. Disconnect the wires (not shown) from the starter. Fasten a hoist to the starter. Remove three bolts (1) and remove starter (2). Remove the gasket. The weight of the starter is 64 lb. (29 kg).2. Remove plug (3) from the flywheel housing.3. Install tooling (A) in the flywheel housing. No. 1 piston at top center (TC) on the compression stroke is the starting point for all timing procedures. The engine is seen from the flywheel end when direction of crankshaft rotation is given. 4. To find top center compression stroke for No. 1 piston, first turn the flywheel clockwise (opposite the direction of engine rotation) approximately 30 degrees. This procedure is to remove all play from the timing gears. Turn the flywheel counterclockwise until a 3/8"-16 NC bolt (4) can be installed in the flywheel through the hole in the flywheel housing. The No. 1 and No. 6 pistons are now at top center position.
If you go past the bolt hole you must start over with Step 2.
5. Remove breather (5) from the valve cover. 6. To see if the No. 1 piston is on the compression stroke, look at the valves of the No. 1 cylinder. The valves will be closed if No. 1 cylinder is on the compression stroke. You must be able to move both rocker arms (6) up and down with your hand.7. If No. 1 piston is not on the compression stroke, remove the 3/8"-16 NC bolt (4) and turn the flywheel 360° counterclockwise. Install the 3/8' bolt as before. The No. 1 piston is now at top center (TC) on the compression stroke. 8. Remove cover (7) from the front of the timing gear cover. 9. Install timing pin (8) [tool (C)] through the left top hole (as seen from the front of the engine) in the fuel injection pump gear and through the groove (slot) in the sleeve and into the hole in the adapter of the fuel injection pump. If the timing pin can not be installed at this time, install the timing pin after the fuel injection pump is removed. 10. Loosen bolt (9) that holds the fuel injection pump gear to the sleeve approximately 3.2 mm (.125 in.). 11. Install tooling (B) and loosen fuel injection pump gear (11) from the sleeve. Remove tooling (B). Remove bolt (9) and washer (10). 12. Disconnect the fuel return line (not shown) from bypass valve (13).13. Remove fuel injection lines (12) from the engine. Put plugs or caps on all the openings. 14. Remove oil supply line (15) and oil drain line (14). 15. Remove fuel supply lines (16) and (17).16. Put plugs or caps in the openings. 17. Remove bolts (19) that hold the fuel injection pump spacer to bracket (18). 18. Remove three nuts (21) and remove fuel injection pump and governor (20). Remove the O-ring seal from the face of the fuel injection pump housing.19. If the timing pin was not installed in Step 9, turn the pump as needed to make an alignment of the groove (slot) in the sleeve with the hole in the adapter and install the timing pin (tool C). 20. Remove spacer (22).Install Fuel Injection Pump And Governor
The Disassembly and Assembly in this book was done on a fuel system for a 6 cylinder engine. The photographs will be different, but the procedures are basically the same.
Make sure the timing pin [tool (A)] is installed through the groove (slot) in the sleeve and into the hole in the adapter so the fuel injection pump timing is correct.
1. Install spacer (1) on the fuel injection pump housing. 2. Make sure that the centerline of one of the holes in fuel injection pump gear (2) is 30° to the left of the vertical centerline of the fuel injection pump gear. This will permit the timing pin [tool (A)] to go through the hole in the fuel injection pump gear when the fuel injection pump and governor is installed. 3. Install the O-ring seal on the face of the fuel injection pump housing. Put fuel injection pump housing and governor (4) in position on the engine and against the timing gear plate. Make sure timing pin (3) [tool (A)] goes through the hole in the fuel injection pump gear as shown. 4. Install the three nuts that hold the fuel injection pump housing and governor to the timing plate. Install bolts (6) that hold the fuel injection pump spacer to bracket (5). 5. Install washer (7) and bolt (8) finger tight. 6. Install tooling (B) on the fuel injection pump gear as shown.7. Put a torque wrench in tooling (B) with the wrench in line with the center of the fuel injection pump gear, and put a torque of 60 to 70 N m (45 to 50 lb. ft.) on the fuel injection pump gear to remove the gear clearance (backlash). While this torque is held, tighten bolt (8) to a torque of 149 7 N m (110 5 lb. ft.). 8. Remove timing pin (3) [tool (A)]. 9. Put the gasket in place and install cover (9) on the front of the timing gear cover. 10. Install fuel supply lines (10) and (11). 11. Install oil supply line (12) and oil drain line (13). 12. Install fuel injection lines (14) on the engine. Tighten the fuel line nuts to a torque of 40.7 6.8 N m (30 5 lb. ft.).13. Connect fuel return line (not shown) to bypass valve (15). 14. Install breather (16) on the valve cover. 15. Remove tooling (C) from the flywheel housing.16. Remove bolt (17) from the flywheel.17. Install plug (19) in the flywheel housing. 18. Fasten a hoist to the starter. Put the gasket in place and install starter (18). Connect the wires (not


Parts nut Suzuki:

09140-05001
 
09140-05001 Nut, Lower Plate
20ELB, 20ELC, 20ELN, 25ELB, 25ELC, 25ELN, 25ELT, 25ELX, 30ELE, 30ESE, 30MLE, DT14C, DT14D, DT14F, DT15 MLE, DT15ELD, DT15ELE, DT15ELF, DT15ELG, DT15ELH, DT15ELJ, DT15ESD, DT15ESE, DT15ESF, DT15ESG, DT15ESH, DT15ESJ, DT15MLD, DT15MLF, DT15MLG, DT15MLH
13582-95216
 
13582-95216 Nut
DT50, DT50, DT50ELB, DT50ELC, DT50ELN, DT50ESB, DT50ESC, DT50ESN, DT50M, DT50MLC, DT50MLN, DT50MSC, DT50MSN, DT50W, DT60CLE, DT65, DT65, DT65ELC, DT65ELN, DT65ESC, DT65ESN, DT75TCLD, DT75TCLE, DT75TCLF, DT75TCLG, DT75TCLH, DT75TCLJ, DT75TCLK, DT75TCL
09159-18004
Nut
09159-18004 Nut
DT115, DT140, DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35ELT, DT35ELX, DT35ELZ, DT35EST, DT35ESX, DT35ESZ, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35MLT, DT35MLX, DT35MLZ, DT35MST, DT35MSX, DT35MSZ, DT35TCLH
09140-06013
 
09140-06013 Nut
DT75TCLD, DT75TCLE, DT75TCLF, DT75TCLG, DT75TCLH, DT75TCLJ, DT75TCLK, DT75TCLL, DT75TCLM, DT75TCLN, DT75TCLP, DT75TCLR, DT75TCLS, DT75TCLT, DT75TCLV, DT85ELT, DT85TCLD, DT85TCLE, DT85TCLF, DT85TCLJ, DT85TCLK, DT85TCLL, DT85TCLM, DT85TCLN, DT85TCLP, D
09159-22003
 
09159-22003 Nut
DT115, DT140, DT15C, DT20ELG, DT20ELH, DT20ELJ, DT20ESG, DT20ESH, DT20ESJ, DT20MLG, DT20MLH, DT20MLJ, DT20MSG, DT20MSH, DT20MSJ, DT25C, DT25ELF, DT25ELG, DT25ELH, DT25ELJ, DT25ESG, DT25ESH, DT25ESJ, DT25MLD, DT25MLE, DT25MLF, DT25MLG, DT25MLH, DT25ML
08319-31087
Nut
08319-31087 Nut
DT50ECLE, DT50MCLE, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCL
09140-12028
Nut
09140-12028 Nut
DF100, DF100, DF115, DF115, DF115TL, DF140, DF140, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF25, DF25Q, DF25Q(QR), DF25T, DF30, DF30Q, DF30Q(QR), DF30T, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DF60, DF60HL, DF60TL, DF70, DF70T
09159-14014
NUT
09159-14014 NUT
DF100, DF100, DF115, DF115, DF115TL, DF140, DF140, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF15, DF15, DF15, DF15S, DF25, DF25(R)S, DF25Q, DF25Q(QR), DF25R, DF25R, DF25T, DF30, DF30Q, DF30Q(QR), DF30T, DF40, DF40, DF40QH, DF40TL, DF50, DF50,
Back to top