58120-88L00 Suzuki PROPELLER BUSHING


58120-88L00 PROPELLER BUSHING Suzuki DF40A, DF40A, DF50A, DF50A, DF60A, DF60A, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55T PROPELLER
58120-88L00 PROPELLER BUSHING Suzuki
Rating:
8

Buy PROPELLER BUSHING 58120-88L00 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 12
 

Suzuki entire parts catalog list:

DF40A 2010
DF40A 2011
DF50A 2010
DF50A 2011
DF60A 2010
DF60A 2011
DT55CLF 1985
DT55CRLG 1986,1987
DT55CRLJ 1988
DT55CRLK 1989
DT55CRLL 1990
DT55CRSG 1986
DT55CRSH 1987
DT55HTCLH 1987
DT55HTCLJ 1988
DT55HTCLK 1989
DT55HTCLL 1990
DT55TCLG 1986
DT55TCLH 1987
DT55TCLJ 1988
DT55TCLK 1989
DT55TCLL 1990
DT55TCLM 1991
DT55TCLN 1992
DT55TCLP 1993
DT55TCLR 1994
DT55TCLS 1995
DT55TCLT 1996
DT55TCLV 1997
DT55TCSG 1986
DT55TCSH 1987
DT65CRLG 1986
DT65CRLH 1987
DT65CRLJ 1988
DT65CRLK 1989
DT65CRLL 1990
DT65CRSG 1986
DT65CRSH 1987
DT65HTCLK 1989
DT65HTCLL 1990
DT65TCLF 1985
DT65TCLG 1986
DT65TCLH 1987
DT65TCLJ 1988
DT65TCLK 1989
DT65TCLL 1990
DT65TCLM 1991
DT65TCLN 1992
DT65TCLP 1993
DT65TCLR 1994
DT65TCLS 1995
DT65TCLT 1996
DT65TCLV 1997
DT65TCSG 1986
DT65TCSH 1987

Information:

start by: a) remove air inlet manifold 1. Remove the plug from the fuel injection pump housing. Install timing pin (A).2. While turning the crankshaft clockwise, as seen from the front of the engine, push on the timing pin until it slides into the groove (slot) in the fuel injection pump camshaft.3. Disconnect the wires from switch (1).4. Disconnect linkage (2) from the governor and the bracket.5. Remove fuel lines (3) and (4). Disconnect wire (5) from the wire on the fuel shutoff solenoid.6. Remove the tachometer drive adapter from the front of the timing gear cover.
TYPICAL EXAMPLE7. Remove bolts (6) and the tachometer drive adapter shaft (7). 8. Remove timing plug (8) and bolt (9). Install bolt (9) through the timing gear cover and into the timing hole in the camshaft gear. If the bolt can not be installed, turn the crankshaft clockwise as seen from the front of the engine until the bolt can be installed. Do not turn the crankshaft backward to install the bolt.9. Remove the bolts that hold the fuel injection pump housing in place. Fasten a hoist and remove the fuel injection pump housing and governor as a unit. The weight is 55 lb. (23 kg).Install Fuel Injection Pump Housing And Governor (Engines With Bolt On Drive For Fuel Injection Pump)
1. Inspect the O-ring seals that go between the fuel injection pump housing and the cylinder block. Install new seals if needed. 2. Make sure timing pin (A) is installed in the groove (slot) in the fuel injection pump camshaft. Fasten a hoist and put the fuel injection pump housing and governor in position on the engine. Install bolts (1). Be extra careful not to push the gear for the fuel injection pump camshaft out of alignment with the timing gear during installation of the fuel injection pump housing and governor.
TYPICAL EXAMPLE3. Install the tachometer drive shaft and tighten it by hand. Install bolts (2). Tighten the bolts to a torque of 32 5 lb.ft. (4.4 0.7 mkg). Tighten the tachometer drive shaft to a torque of 50 10 lb.ft. (6.9 1.4 mkg). If the holes in the gear and the holes in the fuel injection pump camshaft are not in alignment, the timing gear cover must be removed and the gear moved to put the holes in alignment.4. To check the timing, remove timing pin (A) and the timing bolt from the camshaft gear. Turn the crankshaft clockwise as seen from the front of the engine two full turns and install the timing pin and timing bolt again. If the timing pin or timing bolt can not be installed, the timing gear cover must be removed and the engine put in time. See CAMSHAFT AND GEARS. 5. Remove the timing bolt from the timing hole and install it in the timing gear cover. Install the plug in the timing gear cover. Install tachometer drive adapter (3). 6. Remove the timing pin and install plug (7). Connect governor linkage (4) to the governor and the bracket. Connect the wires to switch (6).7. Install fuel lines (8) and (9). Connect wire (5) to the wire for the fuel shutoff solenoid.end by: a) install air inlet manifold


Parts propeller Suzuki:

57632-95320
 
57632-95320 PROPELLER STOPPER
DF40A, DF40A, DF50A, DF50A, DF60A, DF60A, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55T
57600-94701
 
57600-94701 PROPELLER SHAFT ASSEMBLY
DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG, DT55TCS
56120-95311-0ED
 
56120-95311-0ED PROPELLER SHAFT HOUSING
DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG, DT55TCS
58100-88L01-019
58100-88L21-019
58100-88L31-019
PROPELLER (3X11-5-8X12)
58100-88L31-019 PROPELLER (3X11-5-8X12)
DF40A, DF40A, DF50A, DF50A, DF60A, DF60A
58100-88L71-019
 
58100-88L71-019 PROPELLER (3X11-1-8X16)
DF40A, DF40A, DF50A, DF50A, DF60A, DF60A
58100-88L02-019
Back to top