45260-95250 Suzuki RELEASE LEVER


45260-95250 RELEASE LEVER Suzuki DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG, DT55TCS RELEASE
45260-95250 RELEASE LEVER Suzuki
Rating:
53

Buy RELEASE LEVER 45260-95250 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 23
 

Suzuki entire parts catalog list:

DT55CLF 1985
DT55CRLG 1986,1987
DT55CRLJ 1988
DT55CRLK 1989
DT55CRLL 1990
DT55CRSG 1986
DT55CRSH 1987
DT55HTCLH 1987
DT55HTCLJ 1988
DT55HTCLK 1989
DT55HTCLL 1990
DT55TCLG 1986
DT55TCLH 1987
DT55TCLJ 1988
DT55TCLK 1989
DT55TCLL 1990
DT55TCLM 1991
DT55TCLN 1992
DT55TCLP 1993
DT55TCLR 1994
DT55TCLS 1995
DT55TCLT 1996
DT55TCLV 1997
DT55TCSG 1986
DT55TCSH 1987
DT65CRLG 1986
DT65CRLH 1987
DT65CRLJ 1988
DT65CRLK 1989
DT65CRLL 1990
DT65CRSG 1986
DT65CRSH 1987
DT65HTCLK 1989
DT65HTCLL 1990
DT65TCLF 1985
DT65TCLG 1986
DT65TCLH 1987
DT65TCLJ 1988
DT65TCLK 1989
DT65TCLL 1990
DT65TCLM 1991
DT65TCLN 1992
DT65TCLP 1993
DT65TCLR 1994
DT65TCLS 1995
DT65TCLT 1996
DT65TCLV 1997
DT65TCSG 1986
DT65TCSH 1987

Information:

start by:a) remove fuel injection pump housing and governor 1. Put the fuel injection pump housing and governor in position on tool (A).2. Remove the bolts that hold the governor housing to the fuel injection pump housing.3. Remove governor housing (2) from the fuel injection pump housing.4. Remove cover (1) from over the torque spring. 5. Remove spring (5), (wave) washer (4) and guide (3) from the governor housing. 6. Remove the nut and the bolt that hold torque spring (6) to the fuel injection pump housing. Remove the torque spring. 7. Remove seat (7) from over fueling spring (8). 8. Push in on lever (10) and remove pin (9) from the fuel injection pump housing.9. Remove the ring that holds lever (10) to the dowel and remove the lever. 10. Remove riser (follower) (13) from the shaft.11. Pull up on shaft (11) and remove the shaft and lever (12) from the fuel injection pump housing. Shaft (11) has an O-ring seal on it which can make it difficult to remove the shaft from the fuel injection pump housing. 12. Remove cover (14) for the flyweights with tool (B).13. Install the timing pin in the groove (slot) in the fuel injection pump camshaft to keep the camshaft from turning. 14. Remove the bolts that hold flyweight assembly (15) to the camshaft and remove the flyweight assembly from the fuel injection pump housing.15. Remove the timing pin from the fuel injection pump housing.Connection Of Governor To Fuel Injection Pump Housing
1. Put the fuel injection pump housing on tool (A).2. Install timing pin (1) to hold the camshaft from turning.3. Put flyweight assembly (2) in position on the camshaft.
Make sure the pin that holds the shaft in the flyweight assembly is in position before the flyweight assembly is installed.
4. Install three new bolts that hold the flyweight assembly to the camshaft. The bolts for holding the flyweight assembly to the camshaft have a locking material on the threads. The bolts must not be used more than one time. 5. Install cover (3) over the flyweight assembly with tool (B).6. Grind a taper on the bottom edge of a 1/8" screwdriver (4). Install the screwdriver through the bolt hole in the governor housing. The screwdriver must fit evenly against the flyweight assembly cover. Make a mark (stake) in four places around the cover in line with the groove in the camshaft.
Never install a used flyweight cover.
7. Put lever (7) on the dowel. Install ring (6).8. Install pin (5) in the fuel injection pump housing with the round edge down. 9. Put the riser (follower) (11) in position between the flyweights. Lift the flyweights up with a piece of wire and push the riser (follower) forward.10. Put lever (10) in position in the groove of the riser (follower) (11) and the ball end engaged in the sleeve shaft lever (8). Install shaft (9) that holds the lever in position.
If lever (10) is not installed correctly, the governor can not operate and can cause the engine to over speed.
11. Install over fueling spring (12). Install the bolt and the nut that hold the torque spring in position. 13. Install guide (18), (wave) washer (16) and spring (17) in the governor housing.14. Put a new gasket (15) on the governor housing. 15. Install cover (19) over the torque spring. Install the two bolts that hold the cover in position.16. Put the governor housing on the fuel injection pump housing. Install the bolts that hold the governor housing in position.end by: a) install fuel injection pump housing and governor


Parts release Suzuki:

45252-96303
 
45252-96303 RELEASE LEVER LINK
DT25C, DT30C, DT30CRLJ, DT30CRSJ, DT30MCLJ, DT30MCSJ, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT5
45255-96302
 
45255-96302 RELEASE LEVER KNOB
DT15C, DT25C, DT30C, DT30CRLJ, DT30CRSJ, DT30MCLJ, DT30MCSJ, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TC
45311-93900-0ED
 
45311-93900-0ED RELEASE LEVER BRACKET
DT15C, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG,
Back to top