41130-93J12 Suzuki SHAFT, CLAMP BRKT


41130-93J12 SHAFT, CLAMP BRKT Suzuki DF200, DF225, DF250, DF250A, DF300A SHAFT
41130-93J12 SHAFT, CLAMP BRKT Suzuki
Rating:
33

Buy SHAFT, CLAMP BRKT 41130-93J12 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 6
 

Compatible models:

Information:

1. Disconnect connector (1). 2. Attach Tool (A) and fasten a hoist.3. Remove four bolts (3) and stack (2). The weight of the stack and hardware is 45 kg (100 lb). 4. Remove hose clamp (6).5. Remove five bolts (5) and support (4).6. Repeat Steps 4 and 5 for the other side of the engine. 7. Remove six bolts (7) that connect oil pan (8) to flywheel housing (9). Loosen the rest of the bolts that hold the oil pan in position. 8. Attach Tool (A) to the flywheel housing and a hoist. 9. Lift the end of the engine enough so a 1/2 " Hardened Washer (10) can be installed on each side of the engine between the oil pan and the cylinder block.10. Install blocks under the oil pan to support the engine when the flywheel housing is removed. Lower the engine onto the blocks. 11. Remove twenty one bolts (11) and flywheel housing (9). The weight of the flywheel housing is 91 kg (200 lb).Install Flywheel Housing
1. Install two 1/2 " - 13 NC × 4" Long Guide Bolts in the cylinder block. Make sure gasket (12) is in position. The cylinder block, both sides of gasket (12) and the surface of the flywheel housing that makes contact with the gasket must not have any oil, fuel, water or gasket adhesive on them when the flywheel housing is installed on the engine.2. Install Tool (A) on the flywheel housing. Install flywheel housing (9) on the engine. The weight of the flywheel housing is approximately 91 kg (200 lb). Leave Tool (A) attached.
Torque Sequence Put 9S-3263 Thread Lock on bolts (17) through (20) before installation.3. Install the bolts that hold the flywheel housing in place.4. Use the following procedure to tighten the bolts:a. Tighten bolts 1 through 8 in number sequence to 136 14 N m (100 10 lb ft).b. Tighten bolts 9 through 17 (3408) and 9 through 20 (3412) in number sequence to 55 7 N m (41 5 lb ft).c. Again, tighten bolts 1 through 8 in number sequence to 136 14 N m (100 10 lb ft).d. Again, tighten bolts 9 through 20 in number sequence to 55 7 N m (41 5 lb ft). If a new gasket is installed, cut the ends of the gasket so it is even with the bottom of the cylinder block.5. Use Tool (A) and a hoist to lift the flywheel housing and engine enough so that the washers between the oil pan and the cylinder block can be removed. 6. Tighten the bolts that hold the oil pan to the cylinder block. Install six bolts (7) that hold oil pan (8) to flywheel housing (9). 7. Install support (4) with five bolts (5). Install clamp (6) to a torque of 7.0 1.5 N m (5 1 lb ft).8. Repeat Step (7) for the other side of the engine. 9. Use Tool (A) to lift stack (2) in place. Install the stack to the engine with four bolts (3). 10. Connect connector (1).End By:a. install crankshaft rear seal and wear sleeveb. install all turbochargers


Parts shaft Suzuki:

21210-93J00
 
21210-93J00 SHAFT, CLUTCH
DF150, DF150, DF150, DF150TX, DF150ZX, DF175, DF175, DF175, DF175TX, DF175ZX, DF200, DF200, DF200, DF200T, DF200Z, DF225, DF225, DF225, DF225T, DF225Z, DF250, DF250, DF250, DF250T, DF250Z
61632-93J00
SHAFT, ENGINE COVER HOOK
61632-93J00 SHAFT, ENGINE COVER HOOK
DF150, DF150, DF150, DF150TX, DF150ZX, DF175, DF175, DF175, DF175TX, DF175ZX, DF200, DF200, DF200, DF200T, DF200Z, DF225, DF225, DF225, DF225T, DF225Z, DF25(R)S, DF250, DF250, DF250, DF250T, DF250Z, DF25R, DF25R, DF40A, DF40A, DF50A, DF50A, DF60A, DF
31341-93J00
 
31341-93J00 SHAFT, PINION
DF150, DF150, DF150, DF150TX, DF150ZX, DF175, DF175, DF175, DF175TX, DF175ZX, DF200, DF200, DF200, DF200T, DF200Z, DF225, DF225, DF225, DF225T, DF225Z, DF250, DF250, DF250, DF250A, DF250T, DF250Z, DF300, DF300, DF300A, DF70A, DF70A, DF70A, DF80A, DF8
67246-98J00
 
67246-98J00 SHAFT, DRIVE REMOCON
DF250A, DF300, DF300, DF300A
67246-98J10
 
67246-98J10 SHAFT, DRIVE (L)
DF250A, DF300, DF300, DF300A
67246-98J20
 
67246-98J20 SHAFT, DRIVE (R)
DF250A, DF300, DF300, DF300A
61630-98J00
 
61630-98J00 SHAFT, COVER HOOK (FRONT)
DF250A, DF300, DF300, DF300A
41130-92J03
 
41130-92J03 SHAFT, CLAMP BRKT
DF150, DF175, DF200, DF225, DF250
Back to top