32101-96602 Suzuki Starter Assembly


32101-96602 Starter Assembly Suzuki DT14D, DT14F, DT16LC, DT16LN, DT16SC, DT16SN, DT7.5LB, DT7.5LC, DT7.5LN, DT7.5SB, DT7.5SC, DT7.5SN, DT9C, DT9D, DT9F Starter
32101-96602 Starter Assembly Suzuki
Rating:
28

Buy Starter Assembly 32101-96602 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 2-2
 

Suzuki entire parts catalog list:

DT14D 1978
DT14F 1979
DT16LC 1978
DT16LN 1979
DT16SC 1978
DT16SN 1979
DT7.5LB 1977
DT7.5LC 1978
DT7.5LN 1979
DT7.5SB 1977
DT7.5SC 1978
DT7.5SN 1979
DT9C 1977
DT9D 1978
DT9F 1979

Information:


Table 1
Required Tools
Tool Part Number Part Description Qty
B(1) 366-1820 Manifold Alignment Pins 2
C(2) 366-1819 Manifold Alignment Pins 2
(1) Tooling (B) is used to hold the gasket in position and align the exhaust manifold.
(2) Tooling (C) is used to align the exhaust manifold.
Illustration 1 g02565517
Ensure that all components are clean and free from wear and damage. If necessary, replace any components that are worn or damaged. Refer to Specifications, "Exhaust Manifold" for the correct exhaust manifold tolerances. Refer to Specifications, "Turbocharger" for the correct turbocharger tolerances.
Clean all gasket surface's prior to assembly.
If necessary, install studs (43). Tighten the studs to a torque of 18 N m (159 lb in)
Position new gasket (42) onto exhaust manifold (38).
Install turbocharger (5) to the exhaust manifold.
Install nuts (41). Tighten the nuts to a torque of 44 N m (33 lb ft)
If necessary, install back pressure valve adapter (40) to the turbocharger. Refer to Disassembly and Assembly, "Exhaust Back Pressure Valve - Remove and Install" for the correct procedure.
If tube assembly (46) has been removed, position new gasket (44) and new gasket (47) onto tube assembly (46). Position tube assembly (46) onto exhaust manifold (38). Install new bolts (45) to the tube assembly hand tight and ensure that tube assembly can move freely.
Illustration 2 g03423094
Illustration 3 g02565598
Position a new exhaust manifold gasket (35) (not shown) onto the cylinder head. Install Tooling (B) in Position (W). Install Tooling (C) in Position (V). Refer to Illustration 2.Note: Ensure that the exhaust manifold gasket is correctly oriented.
Position a new exhaust manifold gasket (36) (not shown) onto the cylinder head. Install Tooling (B) in Position (X). Install Tooling (C) in Position (Y) Refer to Illustration 2.Note: Ensure that the exhaust manifold gasket is correctly oriented.
Align exhaust manifold (38) with Tooling (B) and Tooling (C). Install the exhaust manifold to the cylinder head.
Install new bolts (37) and spacers (34) in the eight available positions on exhaust manifold (38).
Tighten bolts (37) one to four to a torque of 44 N m (32 lb ft). Tighten the bolts in the sequence that is shown in Illustration 2.
Remove Tooling (B) and Tooling (C) from the cylinder head. Install remaining bolts (37) and spacers (34) to exhaust manifold (38).
Tighten remaining bolts (37) to a torque of 44 N m (32 lb ft). Tighten the bolts in the sequence that is shown in Illustration 2.
Install bolts (21) to tube assembly (22).
Tighten bolts (21) and bolts (45) to a torque of 22 N m (195 lb in).
Illustration 4 g02567636
Position a new gasket (24) (not shown) onto the induction mixer.Note: Ensure that the gasket is correctly installed onto the locating dowels in the induction mixer.
Position a new gasket (30) (not shown) onto tube assembly (25).
Position tube assembly (25) between the bracket and the induction mixer. Install bolts (23) finger tight.
Position tube assembly (25) onto the exhaust cooler. Install bolts (29) finger tight.
Tighten bolts (29) to a torque of 18 N m (159 lb in).Tighten bolts (23) to a torque of 22 N m (195 lb in).Tighten bolts (33) to a torque of 44 N m (32 lb ft).Note: Ensure that tube assembly (25) is not stressed as the bolts are tightened.
Position a new gasket (27) (not shown) and a new gasket (31) (not shown) onto tube assembly (28).
Position tube assembly (28) onto the exhaust cooler and the cylinder head. Install bolts (26) and bolts (32). Tighten the bolts hand tight.
Tighten bolts (26) to a torque of 22 N m (195 lb in).Tighten bolts (32) to a torque of 18 N m (159 lb in).Note: Ensure that tube assembly (28) is not stressed as the bolts are tightened.
Illustration 5 g02518517
Illustration 6 g02568217
Install bolts (16) and install bolt (20) to the clips for tube assembly (17). Tighten bolts (16) to a torque of 18 N m (159 lb in).Tighten bolt (20) to a torque of 22 N m (195 lb in).Note: Ensure that tube assembly (17) is not stressed as the bolts are tightened.
Connect hose assembly (19) to tube assembly (17). Slide hose clip (18) into the correct position.
Install new gasket (13) to tube assembly (15).
Position tube assembly (15) onto the turbocharger.
Install bolts (14). Tighten the bolts to a torque of 11 N m (97 lb in).
Lubricate the turbocharger bearings with clean engine oil through the oil inlet port in Position (A). Rotate the wheel of the compressor several times in order to lubricate the bearings.
Position a new sealing washer (11) onto banjo bolt (10). Install the banjo bolt to tube assembly (12).
Position the remaining new sealing washer (11) onto the banjo bolt. Install the banjo bolt finger tight.
Tighten banjo bolt (10) to a torque of 15 N m (133 lb in)


Parts starter Suzuki:

32101-96601
 
32101-96601 Starter Assembly
DT14C, DT14D, DT14F, DT16LB, DT16LC, DT16LN, DT16SB, DT16SC, DT16SN, DT7.5LB, DT7.5LC, DT7.5LN, DT7.5SB, DT7.5SC, DT7.5SN, DT9C, DT9D, DT9F
18100-96001
 
18100-96001 Starter Assembly, Recoiling Hand
DT7.5LB, DT7.5LC, DT7.5LN, DT7.5SB, DT7.5SC, DT7.5SN, DT9C, DT9D, DT9F
18100-96002
 
18100-96002 Starter Assembly, Recoiling Hand
DT7.5LB, DT7.5LC, DT7.5LN, DT7.5SB, DT7.5SC, DT7.5SN, DT9C, DT9D, DT9F
18100-93100
 
18100-93100 Starter Assembly, Recoil
DT14C, DT14D, DT14F, DT16LB, DT16LC, DT16LN, DT16SB, DT16SC, DT16SN
18100-93101
 
18100-93101 Starter Assembly, Recoil
DT14C, DT14D, DT14F, DT16LT, DT16LT, DT16LT, DT16ST, DT16ST, DT16ST, DT9.9LT, DT9.9LX, DT9.9LZ, DT9.9ST, DT9.9SX, DT9.9SZ
Back to top