33832-95511 PTT CABLE ASSEMBLY Suzuki
DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT55TCSG, DT55TCS
PTT
Price: query
Rating:
Compatible models:
DT55CLF
DT55CRLG
DT55CRLJ
DT55CRLK
DT55CRLL
DT55CRSG
DT55CRSH
DT55HTCLH
DT55HTCLJ
DT55HTCLK
DT55HTCLL
DT55TCLG
DT55TCLH
DT55TCLJ
DT55TCLK
DT55TCLL
DT55TCLM
DT55TCLN
DT55TCLP
DT55TCLR
DT55TCLS
DT55TCLT
DT55TCLV
DT55TCSG
DT55TCSH
DT65CRLG
DT65CRLH
DT65CRLJ
DT65CRLK
DT65CRLL
DT65CRSG
DT65CRSH
DT65HTCLK
DT65HTCLL
DT65TCLF
DT65TCLG
DT65TCLH
DT65TCLJ
DT65TCLK
DT65TCLL
DT65TCLM
DT65TCLN
DT65TCLP
DT65TCLR
DT65TCLS
DT65TCLT
DT65TCLV
DT65TCSG
DT65TCSH
Suzuki
Suzuki entire parts catalog list:
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT 88-90 » 33832-95511
- TRIM RELAY » 33832-95511
- POWER UNIT » 33832-95511
- POWER UNIT » 33832-95511
Information:
start by:a) remove radiator and guardb) remove batteries and battery box
Stop the engine, lower the bucket to the ground, move the control levers backward and forward to release the pressure in the hydraulic system. Slowly loosen the cap to release any pressure in the hydraulic tank. Let the hydraulic and transmission oil become cool before any lines are disconnected or the oil is drained.
1. Drain the oil from the hydraulic tank. The capacity of the system is: 920-17.5 U.S. gal. (66 litre) 930-19.5 U.S. gal. (74 litre) 2. Drain the oil from the transmission and transfer gears. The capacity of the system is 6.75 U.S. gal. (25.5 litre). 3. Remove cover (1) and fender (3) from the hydraulic tank.4. Remove covers (2) and (4) from the right side of the machine. 5. Remove tube assembly (5) and elbow (6) from the machine.6. Remove hose assembly (7). Disconnect hose assembly (8) from the hydraulic pump. 7. Disconnect control linkages (9) and (10), air line (12) and electric wires (11) from the transmission. 8. Disconnect air line (13) from the parking brake chamber assembly. 9. Lift the cover on the floor plate and remove the nut, bolt (15) and clip that hold the transmission filler tube (14) and oil level gauge (16). 10. Loosen tube assembly (17) from the steering control valve and the bracket that holds it to the frame of the machine. 11. Remove the bolts that hold oil level gauge (16) and the oil filler tube to the transfer gear case. Remove the filler tube and oil level gauge from the operator's station. 12. Disconnect brake lines (19) and (20) from the master cylinders.13. Remove reservoir (18) from the machine. 14. Disconnect air line (22) from the master cylinder actuators.15. Remove the bolts that hold the two master cylinders and actuators to bracket (21). Remove the master cylinders as a unit. 16. Disconnect temperature sending unit (24) from the torque converter housing.17. Remove tube assembly (23) from the torque converter and transfer gear cases. 18. Disconnect water temperature sending unit (25) from the cylinder head.19. Disconnect tube assembly (27) from the air compressor. Disconnect hose assembly (28) from the air compressor governor.20. Disconnect engine oil pressure gauge line (26) from the back of the cylinder block. 21. Remove muffler (29) from the exhaust manifold. 22. Remove governor linkage (33) from the machine.23. Disconnect fuel line (32) and fuel pressure gauge line (31) from the engine.24. Disconnect electric wire (30) from the starting motor. 25. Disconnect wiring harnesses (34) at the flywheel housing on the left side of the machine. 26. Remove rear universal joint (35) from the machine. 27. Disconnect intermediate drive shaft (36) from the parking brake flange.28. Fasten tool (A) to the top of the torque converter housing. Fasten tool (B) to the engine, tool (A) and a hoist. 29. Put a floor jack under the transfer gear case. Remove caps (37) from each side of the machine. 30. Remove support assemblies (38) from each side of the transfer gear case. 31. Remove the bolts, washers and nuts (39) from each side of the engine front support. 32. Remove the engine, torque converter, transmission and transfer gears as a unit with tooling (A) and (B). The weight of the unit is 3200 lb. (1440 kg).Install Engine, Torque Converter, Transmission And Transfer Gears
1. Make sure washers (1) are in position on each side of the main frame before the engine is installed.2. Fasten tool (A) to the top of the torque converter housing. Fasten tool (B) to a hoist, tool (A) and the front of the engine. Put the engine, torque converter, transmission and transfer gears in position on the machine as a unit. 3. Install the bolts, washers and nuts that hold the engine front support hand tight.4. Put a floor jack under the transfer gear case for support. 5. Install support assemblies (2) on each side of the transfer gear case.6. Lift the supports into position in the frame brackets and install the caps and bolts to hold them in position.7. Remove the floor jack and tooling (A) and (B) from the engine.8. Tighten the engine front support bolts. 9. Connect intermediate drive shaft (3) to the parking brake flange and tighten the bolts to a torque of 48 8 lb.ft. (64 11 N m). 10. Put rear universal joint (4) in position between the rear differential and the output flange and tighten the bolts to a torque of 48 8 lb.ft. (64 11 N m). 11. Connect fuel line (5) and fuel pressure gauge line (7) to the engine.12. Install governor control linkage. 13. Connect wiring harnesses (8) at the flywheel housing on the left side of the machine. 14. Install muffler (9) on the exhaust manifold. 15. Connect tube assembly (12) to the air compressor. Connect hose assembly (13) to the air compressor governor.16. Connect oil pressure line (11) to the rear of the cylinder block.17. Connect water temperature sending unit (10) to the cylinder head. 18. Connect torque converter sending unit (15) to the torque converter housing.19. Put clean oil on the O-ring seals and install tube assembly (14) to the torque converter housing and transfer gear case. 20. Install the two master cylinders and actuators (16) as a unit on the machine.21. Connect air line (17) to the master cylinder actuators.22. Install the brake reservoir and connect the brake lines to the master cylinders. 23. Put clean oil on the O-ring seal for filler tube (18). Install filler tube (18) and oil level gauge (19) as a unit. Be sure the gasket is in position for the oil level gauge before the bolts are tightened.24. Tighten the tube assembly to the steering control valve and the bolts that hold it to the frame after the oil level gauge is tightened to the transfer gear case. 25. Connect electric wires (23) to the back-up alarm switch.26. Connect hose assembly to fitting (22) on the transmission.27. Connect control
Stop the engine, lower the bucket to the ground, move the control levers backward and forward to release the pressure in the hydraulic system. Slowly loosen the cap to release any pressure in the hydraulic tank. Let the hydraulic and transmission oil become cool before any lines are disconnected or the oil is drained.
1. Drain the oil from the hydraulic tank. The capacity of the system is: 920-17.5 U.S. gal. (66 litre) 930-19.5 U.S. gal. (74 litre) 2. Drain the oil from the transmission and transfer gears. The capacity of the system is 6.75 U.S. gal. (25.5 litre). 3. Remove cover (1) and fender (3) from the hydraulic tank.4. Remove covers (2) and (4) from the right side of the machine. 5. Remove tube assembly (5) and elbow (6) from the machine.6. Remove hose assembly (7). Disconnect hose assembly (8) from the hydraulic pump. 7. Disconnect control linkages (9) and (10), air line (12) and electric wires (11) from the transmission. 8. Disconnect air line (13) from the parking brake chamber assembly. 9. Lift the cover on the floor plate and remove the nut, bolt (15) and clip that hold the transmission filler tube (14) and oil level gauge (16). 10. Loosen tube assembly (17) from the steering control valve and the bracket that holds it to the frame of the machine. 11. Remove the bolts that hold oil level gauge (16) and the oil filler tube to the transfer gear case. Remove the filler tube and oil level gauge from the operator's station. 12. Disconnect brake lines (19) and (20) from the master cylinders.13. Remove reservoir (18) from the machine. 14. Disconnect air line (22) from the master cylinder actuators.15. Remove the bolts that hold the two master cylinders and actuators to bracket (21). Remove the master cylinders as a unit. 16. Disconnect temperature sending unit (24) from the torque converter housing.17. Remove tube assembly (23) from the torque converter and transfer gear cases. 18. Disconnect water temperature sending unit (25) from the cylinder head.19. Disconnect tube assembly (27) from the air compressor. Disconnect hose assembly (28) from the air compressor governor.20. Disconnect engine oil pressure gauge line (26) from the back of the cylinder block. 21. Remove muffler (29) from the exhaust manifold. 22. Remove governor linkage (33) from the machine.23. Disconnect fuel line (32) and fuel pressure gauge line (31) from the engine.24. Disconnect electric wire (30) from the starting motor. 25. Disconnect wiring harnesses (34) at the flywheel housing on the left side of the machine. 26. Remove rear universal joint (35) from the machine. 27. Disconnect intermediate drive shaft (36) from the parking brake flange.28. Fasten tool (A) to the top of the torque converter housing. Fasten tool (B) to the engine, tool (A) and a hoist. 29. Put a floor jack under the transfer gear case. Remove caps (37) from each side of the machine. 30. Remove support assemblies (38) from each side of the transfer gear case. 31. Remove the bolts, washers and nuts (39) from each side of the engine front support. 32. Remove the engine, torque converter, transmission and transfer gears as a unit with tooling (A) and (B). The weight of the unit is 3200 lb. (1440 kg).Install Engine, Torque Converter, Transmission And Transfer Gears
1. Make sure washers (1) are in position on each side of the main frame before the engine is installed.2. Fasten tool (A) to the top of the torque converter housing. Fasten tool (B) to a hoist, tool (A) and the front of the engine. Put the engine, torque converter, transmission and transfer gears in position on the machine as a unit. 3. Install the bolts, washers and nuts that hold the engine front support hand tight.4. Put a floor jack under the transfer gear case for support. 5. Install support assemblies (2) on each side of the transfer gear case.6. Lift the supports into position in the frame brackets and install the caps and bolts to hold them in position.7. Remove the floor jack and tooling (A) and (B) from the engine.8. Tighten the engine front support bolts. 9. Connect intermediate drive shaft (3) to the parking brake flange and tighten the bolts to a torque of 48 8 lb.ft. (64 11 N m). 10. Put rear universal joint (4) in position between the rear differential and the output flange and tighten the bolts to a torque of 48 8 lb.ft. (64 11 N m). 11. Connect fuel line (5) and fuel pressure gauge line (7) to the engine.12. Install governor control linkage. 13. Connect wiring harnesses (8) at the flywheel housing on the left side of the machine. 14. Install muffler (9) on the exhaust manifold. 15. Connect tube assembly (12) to the air compressor. Connect hose assembly (13) to the air compressor governor.16. Connect oil pressure line (11) to the rear of the cylinder block.17. Connect water temperature sending unit (10) to the cylinder head. 18. Connect torque converter sending unit (15) to the torque converter housing.19. Put clean oil on the O-ring seals and install tube assembly (14) to the torque converter housing and transfer gear case. 20. Install the two master cylinders and actuators (16) as a unit on the machine.21. Connect air line (17) to the master cylinder actuators.22. Install the brake reservoir and connect the brake lines to the master cylinders. 23. Put clean oil on the O-ring seal for filler tube (18). Install filler tube (18) and oil level gauge (19) as a unit. Be sure the gasket is in position for the oil level gauge before the bolts are tightened.24. Tighten the tube assembly to the steering control valve and the bolts that hold it to the frame after the oil level gauge is tightened to the transfer gear case. 25. Connect electric wires (23) to the back-up alarm switch.26. Connect hose assembly to fitting (22) on the transmission.27. Connect control
Parts ptt Suzuki:
38412-94500
38412-94500 PTT BRACKET
DT115, DT140, DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH, DT65CRLG, DT65CRLH, DT65CRSG, DT65CRSH, DT65TCLF, DT65TCLG, DT65TCLH, DT65TCSG, DT65TCSH, DT75TCLJ, DT75TCLK, DT75TCLL, DT75TCLM, DT75TCLN, DT75TC
33831-94702
33831-94702 PTT RELAY CABLE ASSEMBLY
DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35TCLH, DT35TCLJ, DT35TCLK, DT40C, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT
34802-95301
34802-95301 PTT ATTACHMENT
DT40C, DT55CLF, DT55CRLG, DT55CRSG, DT55CRSH, DT55HTCLH, DT55TCLG, DT55TCLH, DT55TCSG, DT55TCSH, DT65CRLG, DT65CRLH, DT65CRSG, DT65CRSH, DT65TCLF, DT65TCLG, DT65TCLH, DT65TCSG, DT65TCSH, DT75TCLJ, DT75TCLK, DT75TCLL, DT75TCLM, DT75TCLN, DT75TCLP, DT7
38410-94552
38410-94552 PTT RELAY ASSEMBLY
DF100, DF100, DF115, DF115, DF115TL, DF140, DF140, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DF60, DF60HL, DF60TL, DF70, DF70THL, DF70TL, DF90, DF90TL, DT150SSH, DT150SSJ, DT150SSK, DT150S
37850-95611
37850-95611 PTT SWITCH ASSEMBLY
DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR, DT150T
48171-95E00
48171-95E00 PTT MARK
DT55CRLJ, DT55CRLK, DT55CRLL, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT65CRLJ, DT65CRLK, DT65CRLL, DT65HTCLK, DT65HTCLL, DT65TCLJ, DT65TCLK, DT65TCLL, DT65T
37805-92E00
37805-92E00 PTT SWITCH PANEL
DF100, DF100, DF115, DF115, DF115TL, DF140, DF140, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF25, DF25Q, DF25Q(QR), DF25T, DF30, DF30Q, DF30Q(QR), DF30T, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DF60, DF60HL, DF60TL, DF70, DF70T
38100-95E01-0ED
38100-95E01-0ED PTT MOTOR ASSEMBLY
DT55CRLJ, DT55CRLK, DT55CRLL, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT65CRLJ, DT65CRLK, DT65CRLL, DT65HTCLK, DT65HTCLL, DT65TCLJ, DT65TCLK, DT65TCLL, DT65T