48600-94401-0ED Suzuki TUBE, CYLINDER


48600-94401-0ED TUBE, CYLINDER Suzuki DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35TCLH, DT35TCLJ, DT35TCLK, DT40C TUBE
48600-94401-0ED TUBE, CYLINDER Suzuki
Rating:
38

Buy TUBE, CYLINDER 48600-94401-0ED Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 9-2
 

Suzuki entire parts catalog list:

DT35CRLH 1987
DT35CRLJ 1988
DT35CRLK 1989
DT35CRSH 1987
DT35CRSJ 1988
DT35CRSK 1989
DT35MCLH 1987
DT35MCLJ 1988
DT35MCLK 1989
DT35MCSH 1987
DT35MCSJ 1988
DT35MCSK 1989
DT35TCLH 1987
DT35TCLJ 1988
DT35TCLK 1989
DT40C 1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998

Information:

START BY:a) remove oil pumpb) remove oil pan plate 1 Remove No. 1, 3, 5 and 7 main bearing caps (1).2. Remove the lower halves of the main bearings from the bearing caps.
If the crankshaft is turned in the wrong direction, the tab on bearing will be pushed between the crankshaft and bearing area in block which can cause damage to the block or crankshaft.
3. Install tool (A) in the hole of the crankshaft journal and remove the upper half of main bearing (2) as the crankshaft is turned and the main bearing is moved out of the cylinder block. 4. Remove crankshaft thrust bearings (3) from the No. 7 main bearing. Install the main bearings dry when the clearance checks are made. Put clean engine oil on the main bearings for final assembly.
Make sure the upper and lower halves of the main bearings are installed so the bearing tabs fit into the notch in cylinder block and the main bearing caps.
5. Install the new lower halves of the main bearings in the main bearing caps. Use tool (A) and install the upper half of main bearings (2) in the cylinder block. When the bearing clearance is checked and the engine is in a vertical position, such as in the vehicle, the crankshaft will have to be lifted up and held against the upper halves of the main bearings to get a correct measurement with the Plastigage. The Plastigage will not hold the weight of the crankshaft and give a correct indication. If the engine is in a horizontal position, it is not necessary to hold the crankshaft up. Do not turn the crankshaft when the Plastigage is in position to check clearances. 6. Check the main bearing clearances with Plastigage (B) as follows:a) Put a piece of Plastigage (B) on the crankshaft as shown.
Make sure the part number on the main bearing cap is toward the front of the engine and the number on the main bearing cap is the same as the number on the cylinder block on the left side of each main bearing cap.
Do not turn the crankshaft when Plastigage (B) is in position.b) Install main bearing caps (1) for No. 1, 3, 5 and 7 main bearings. Put clean engine oil on the bolt threads and the face of the washers and install the bolts. Tighten the bolts to a torque of 30 3 lb.ft. (40 4 N m).
Do not use an impact wrench to tighten the bolts the additional 90°.
c) Put a mark on each bolt and main bearing cap, then tighten the bolts 90° more.d) Remove the main bearing caps for No. 1, 3, 5 and 7 main bearings. Remove Plastigage (B) and measure the width of the Plastigage. The main bearing clearance must be .0030 to .0065 in. (0.076 to 0.165 mm). Maximum permissible clearance with used bearings is .010 in. (0.25 mm). 7. Put clean oil on the thrust bearing and install a new thrust bearing for the No. 7 main bearing. Install the thrust bearing with the identification "BLOCK SIDE" toward the cylinder block and the tabs on the thrust bearings in the machined area in the cylinder block. Tabs (4) on thrust bearing (3) will at let the thrust bearing be installed backward. On the early model thrust bearings without tabs make sure the notches in the face of the thrust bearing are installed toward the crankshaft. 8. Install main bearing caps (1) and tighten the bolts as in Steps 6b and 6c.9. Remove No. 2, 4 and 6 main bearing caps. Do Steps 5 through 8 again. 10. Check the crankshaft end play with tooling (C). The end play is controlled by the thrust bearings on the No. 7 main bearing. End play with new bearings is .0025 to .0145 in. (0.064 to 0.368 mm). The maximum permissible end play with used bearings is .025 in. (0.64 mm).END BY:a) install oil pan plateb) install oil pump


Parts tube Suzuki:

33833-95500
 
33833-95500 Tube, Trim Relay Cable
DT15 MLE, DT15ELD, DT15ELE, DT15ELF, DT15ELG, DT15ELH, DT15ELJ, DT15ESD, DT15ESE, DT15ESF, DT15ESG, DT15ESH, DT15ESJ, DT15MLD, DT15MLF, DT15MLG, DT15MLH, DT15MLJ, DT15MSD, DT15MSE, DT15MSF, DT15MSG, DT15MSH, DT15MSJ, DT20ELG, DT20ELH, DT20ELJ, DT20ES
52117-94400
 
52117-94400 Tube, water inspection
DT15C, DT15ELG, DT15ELH, DT15ELJ, DT15ESG, DT15ESH, DT15ESJ, DT15MLG, DT15MLH, DT15MLJ, DT15MSG, DT15MSH, DT15MSJ, DT20ELG, DT20ELH, DT20ELJ, DT20ESG, DT20ESH, DT20ESJ, DT20MLG, DT20MLH, DT20MLJ, DT20MSG, DT20MSH, DT20MSJ, DT25C, DT25ELF, DT25ELG, DT
33446-98E20
 
33446-98E20 TUBE, SW WIRE
DT150, DT150SSH, DT150SSJ, DT150SSK, DT150SSL, DT150SSM, DT150SSN, DT150STCLP, DT150STCLR, DT150STCLS, DT150STCLT, DT150TCLH, DT150TCLJ, DT150TCLK, DT150TCLL, DT150TCLM, DT150TCLN, DT150TCLP, DT150TCLR, DT150TCXGM, DT150TCXGN, DT150TCXGP, DT150TCXGR,
38423-95510
 
38423-95510 TUBE
DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DF60, DF60HL, DF60TL, DF70, DF70THL, DF70TL, DT115, DT140, DT150, DT15C, DT200, DT225, DT25C, DT30C, DT30CRLJ, DT30CRSJ, DT30MCLJ, DT30MCSJ, DT40C, DT55CRLJ, DT55CRLK, DT55CRLL, DT55HTCLJ, DT55H
37802-95D20
33834-87E00
 
33834-87E00 TUBE, HARNESS PROTECTOR
DF15, DF15, DF15S, DF9.9R, DF9.9RL, DF9.9S, DF9.9TH, DF9.9TH, DF99R, DF99TH, DT40C
17561-94442
14211-94450
 
14211-94450 Tube, Exhaust
DT35CRLH, DT35CRLJ, DT35CRLK, DT35CRSH, DT35CRSJ, DT35CRSK, DT35MCLH, DT35MCLJ, DT35MCLK, DT35MCSH, DT35MCSJ, DT35MCSK, DT35TCLH, DT35TCLJ, DT35TCLK
Back to top