32495-95501 Suzuki Timing Washer


32495-95501 Timing Washer Suzuki DT75TCLD, DT75TCLE, DT75TCLF, DT75TCLG, DT75TCLH, DT85ELT, DT85TCLD, DT85TCLE, DT85TCLF, DT85TCLT, DT85TCLX, DT85TCLZ, DT85TELN, DT85TELT Timing
32495-95501 Timing Washer Suzuki
Rating:
28

Buy Timing Washer 32495-95501 Suzuki genuine, new aftermarket parts with delivery
Number on catalog scheme: 10
 

Suzuki entire parts catalog list:

DT75TCLD 1983
DT75TCLE 1984
DT75TCLF 1985
DT75TCLG 1986
DT75TCLH 1987
DT85ELT 1980
DT85TCLD 1983
DT85TCLE 1984
DT85TCLF 1985
DT85TCLT 1980
DT85TCLX 1981
DT85TCLZ 1982
DT85TELN 1979
DT85TELT 1980

Information:


Table 1
Required Tools
Tool Part Number Part Description Qty
A(1) 9U-6198 Crankshaft Turning Tool 1
A(2) 9U-7336 Housing 1
5P-7305 Engine Turning Tool 1
B 1U-6684 Piston Ring Compressor 1
C 227-4390 E12 Torx Socket 1
D 8T-3052 Degree Wheel 1
(1) The Crankshaft Turning Tool is used on the front pulley.
(2) This Tool is used in the aperture for the electric starting motor.Note: Either Tooling (A) can be used. Use the Tooling that is most suitable.
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Discard all used Connecting Rod fasteners.
If the connecting rod caps were temporarily installed, remove the connecting rod caps. If necessary, thoroughly clean all of the components.
Apply clean engine oil to the cylinder bore, piston rings, outer surface of the piston and the bearing shells for the connecting rod. Note: Install the bearing shells for the connecting rods dry when clearance checks are performed. Refer to Disassembly and Assembly, "Bearing Clearance - Check" for the correct procedure. Apply clean engine oil to the bearing shells for the connecting rods during final assembly.Note: Ensure that the piston and the connecting rod assembly are installed in the correct cylinder.
Use Tooling (A) to rotate the crankshaft until the crankshaft pin is at the bottom center position. Lubricate the crankshaft pin with clean engine oil.
Illustration 1 g02013213
Install Tooling (B) onto piston (4). Note: Ensure that Tooling (B) is installed correctly and that piston (4) can easily slide from the tool.Note: The arrow on the top of the piston must be toward the front of the engine. The locating tab for the bearing shell of the connecting rod must be on the same side of the engine as the piston cooling jet.
Carefully push the piston and the connecting rod assembly into the cylinder bore and onto the crankshaft pin. Note: Do not damage the finished surface of the crankshaft pin.
Illustration 2 g03472016
Install connecting rod cap (2) onto connecting rod (1). Note: Ensure that etched number in Position (X) on connecting rod cap (2) matches etched number in Position (X) on connecting rod (1). Ensure the correct orientation of connecting rod cap (2). The locating tab for the upper bearing shell and the lower bearing shell should be on the same side.Note: Do not reuse the old bolts in order to secure the connecting rod cap.
Install new bolts (3) to connecting rod (1). Use Tooling (C) in order to tighten the bolts evenly to a torque of 40 N m (30 lb ft).
Turn the bolts for an additional 120 degrees in a clockwise direction. Use Tooling (C) and Tooling (D) to achieve the correct final torque.
Ensure that the installed connecting rod assembly has tactile side play. Rotate the crankshaft in order to ensure that there is no binding.
Repeat Step 2 through Step 9 in order to install the remaining pistons and connecting rods. End By:
Install the piston cooling jets. Refer to Disassembly and Assembly, "Piston Cooling Jets - Remove and Install" for the correct procedure.
Install the cylinder head. Refer to Disassembly and Assembly, "Cylinder Head - Install" for the correct procedure.


Parts timing Suzuki:

32495-95502
 
32495-95502 Timing, pointer
DT75TCLG, DT75TCLH
Back to top