17400-95550 Suzuki Water Pump Repair Kit


17400-95550 Water Pump Repair Kit Suzuki DT75TCLD, DT75TCLE, DT75TCLF, DT75TCLG, DT75TCLH, DT85TCLD, DT85TCLE, DT85TCLF Water
17400-95550 Water Pump Repair Kit Suzuki
Rating:
93

Buy Water Pump Repair Kit 17400-95550 Suzuki genuine, new aftermarket parts with delivery

You can buy parts:

As an associate, we earn commssions on qualifying purchases through the links below
$35.80

07-02-2025
0.1812[0.08] Pounds
CN: Shanghaisalingschuan
SLSRPMT Water Pump Impeller Repair Kit 17400-95350 for Suzuki Outboards 75 85 HP DT75 DT85 Replace 17400-95351 17400-95550 Sierra 18-3244
SLSRPMT Fits for Suzuki outboard 75HP 85HP DT75 DT85 || Replaced by Suzuki outboard OEM p/n 17400-95351 17400-95350 17400-95550 Sierra 18-3244 || It is very important to check your boat motor part number before purchase. please message us s/n, year and horsepower if you are not sure. || Package Included:Water Pump Impeller 17461-95300, 17461-95301, 17461-95302, 18-3095. Wear Plate 17471-95504. Key 09420-04005. Gasket 17472-95200,18-0459 as pictures showed. || VERY IMPORTANT- Same horsepower and year, different model, It may have a totally difference. Please check your outboard model, serial number and year before purchase. You can ask us questions if you are not sure, we're pleasure to help you.
$22.00
 

19-08-2024

CN: ETCAUTO Martine
HeuroFosh 1740095550 Water Pump Impeller Kit for Suzuki 2 Str Outboard DT75 DT85 Motor 17400-95350 17400-95351
Heurofosh This Suzuki Outboard Water Pump Impeller rebuild kit || Fits Suzuki Marine Outboard 2 Stroke DT75 DT85 Motor || Suzuki Original OEM Parrt Number 17400-95550 17400-95350 17400-95351 || All Selling HeuroFosh Brand Boat Parts were tested by market more than 25 years || If you are not sure whether this item is suitable for your model, please contact us.
$22.00
 

04-05-2023

-: -
YiheoZux 1740095351 Water Pump Impeller Service Kit for Suzuki 2 Stroke Outboard DT75 DT85 Motor Lower Unit 17400-95550 17400-95350
This is Suzuki Outboard Water Pump Rebuild Impeller Kit || Fits Suzuki Marine Outboard DT75 DT85 || Replace Suzuki Original OEM Parrt Number 17400-95550, 17400-95350, 17400-95351 || YiheoZux Brand Products were tested by market more than 25 years || Package will be shipped from USA within 24 hours
Number on catalog scheme: 15
 

Suzuki entire parts catalog list:

DT75TCLD 1983
DT75TCLE 1984
DT75TCLF 1985
DT75TCLG 1986
DT75TCLH 1987
DT85TCLD 1983
DT85TCLE 1984
DT85TCLF 1985

Information:


Table 1
Required Tools
Tool Part Number Part Description Qty
A 370-4653 Counterweight Tool 1
B 4C-5597 Anti-Seize Compound 1
Keep all parts clean from contaminants.Contaminants may cause rapid wear and shortened component life.
Illustration 1 g06368233
Ensure that turbocharger (3) is clean and free from damage. Inspect the turbocharger for wear. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If any part of the turbocharger is worn or damaged, the complete turbocharger must be replaced.
Test wastegate actuator (32) for correct operation. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If any part of the wastegate actuator is worn or damaged, the complete turbocharger must be replaced.
Illustration 2 g06368135
Clean the gasket surface of exhaust manifold (28). If necessary, install studs (31) to turbocharger (3). Tighten the studs to a torque of 18 N m (160 lb in).
Install a new gasket (30) to studs (31).
Position turbocharger (3) onto the exhaust manifold and install nuts (29) finger tight. The nuts (29) should not prevent the turbocharger or prevent Tooling (A) from correctly positioning the turbocharger onto the exhaust manifold.
Use Tooling (A) to align turbocharger (3).Note: Ensure that the turbocharger is correctly oriented.
Illustration 3 g06368245
Turbocharger tightening sequence viewed from the exhaust manifold.
Tighten nuts (29) in the sequence shown in Illustration 3 to a torque of 44 N m (32 lb ft).
Remove Tooling (A) from turbocharger (3).
Illustration 4 g06367565
Remove plugs and caps from tube assembly (15) and tube assembly (18). Ensure that the tube assemblies are clean and free from damage. Replace any damaged components.
Position a new gasket (16) (not shown) onto tube assembly (18).
Install bolts (17) to tube assembly (18). Tighten the bolts to a torque of 22 N m (195 lb in).
Illustration 5 g06368142
Position a new gasket (20) (not shown) onto tube assembly (21) and install bolts (22).Note: Holes in the gasket have serration that holds the bolts captive.
Remove plug from oil filter base (23) for oil feed tube assembly (21).
Illustration 6 g06368143
Align tube nut (24) on oil filter base (23). Tighten bolts (22) and tube nut (24) finger tight.
Tighten bolts (22) to a torque of 22 N m (195 lb in). Tighten tube nut (24) to a torque of 45 N m (33 lb ft).
Install bolt (25) and bolt (27) into clamp (26). Tighten the bolt (25) and bolt (27) finger tight.
Illustration 7 g06368254
Remove the plug from oil inlet port (X). Lubricate the turbocharger bearings with clean engine oil through the oil inlet port (X). Rotate the wheel of the compressor several times to lubricate the bearings.
Install new O-rings (14) to tube assembly (15). Install the banjo bolt (13) to tube assembly (15).
Position tube assembly (15) onto turbocharger (3) and tube assembly (21), Align tube nut (21A) onto turbo assembly (21). Tighten the banjo bolt to a torque of 20 N m (177 lb in) and the tube nut to a torque of 45 N m (33 lb ft).
Illustration 8 g06367509
Use Tooling (B) to lubricate the allen head bolt for V-band clamp (5). Position V-band clamp (5) onto air duct (9).
Position hose assembly (10) and air duct (9) onto the outlet of turbocharger (3) and the turbocharger (19). Ensure that V-band clamp (5) is correctly seated on the air duct (9) and turbocharger (3).
Tighten the allen head bolt for V-band clamp (5) to a torque of 12 N m (106 lb in).
Tighten hose clamps (11) to a torque of 6 N m (53 lb in).
Use Tooling (B) to lubricate the nut for V-band clamp (12). Position V-band clamp (12) onto the turbocharger (19).
Use Tooling (B) to lubricate the nut for V-band clamp (2). Position V-band clamp (2) onto elbow (1).
Position elbow (1) onto the turbocharger (19) and turbocharger (3).
Tighten nuts for V-band clamp (2) and nuts for V-band clamp (12) finger tight. Ensure that the V-band clamps are seated correctly onto the turbochargers.
Tighten nuts for V-band clamp (2) and nuts for V-band clamp (12) to a torque of 12 N m (106 lb in).
Connect hose assembly (8) to the wastegate actuator (7). Slide clip (8) (not shown) along the hose assembly ensure that t


Parts water Suzuki:

17631-94600
 
17631-94600 WATER FILTER
DT115, DT140, DT55CLF, DT55CRLG, DT55CRLJ, DT55CRLK, DT55CRLL, DT55CRSG, DT55CRSH, DT55HTCLH, DT55HTCLJ, DT55HTCLK, DT55HTCLL, DT55TCLG, DT55TCLH, DT55TCLJ, DT55TCLK, DT55TCLL, DT55TCLM, DT55TCLN, DT55TCLP, DT55TCLR, DT55TCLS, DT55TCLT, DT55TCLV, DT5
Back to top