36662-88L30 WIRE, 15 EXTENSION Suzuki
DF100A, DF115A, DF140A, DF150, DF175, DF200, DF225, DF250, DF250A, DF300A, DF70A, DF80A, DF90A
WIRE
Price: query
Rating:
Compatible models:
Suzuki entire parts catalog list:
- OPT:LOWRANCE GAUGE » 36662-88L30
- OPT:LOWRANCE GAUGE » 36662-88L30
- OPT:LOWRANCE GAUGE » 36662-88L30
- OPT:LOWRANCE GAUGEN (310001~) » 36662-88L30
- OPT:LOWRANCE GAUGEN (310001~) » 36662-88L30
- OPT:LOWRANCE GAUGE » 36662-88L30
- OPT:LOWRANCE GAUGE » 36662-88L30
- OPT:LOWRANCE GAUGE » 36662-88L30
- OPT:LOWRANCE GAUGE(NOT FOR US MARKET) » 36662-88L30
- OPT:LOWRANCE GAUGE(NOT FOR US MARKET) (310001~) » 36662-88L30
- OPT:LOWRANCE GAUGE (NOT FOR US MARKET) (210001~) » 36662-88L30
- OPT:LOWRANCE GAUGE (310001~) » 36662-88L30
- OPT:LOWRANCE GAUGE (310001~) » 36662-88L30
- OPT:LOWRANCE GAUGE (310001~) » 36662-88L30
Information:
Start By:a. remove valve cover 1. Use tool (A) to turn the crankshaft to release any pressure against the rocker arms.2. Use tool (B) to remove push rods (1). 3. Remove valve bridges (2). Put identification on the valve bridges as to their location for correct installation. 4. Remove bolts (3) and rocker shaft assembly (4).Install Rocker Shaft Assembly And Push Rods
1. Put rocker shaft assembly (1) in position on the engine. The tightening sequence in Step 2 is for 3408 engines only.2. Put clean engine oil on all the bolts that hold the rocker shaft assembly in position. Install bolts (2), (3), (4) and (5). Use the following procedure to tighten the bolts.a. Tighten bolts (2) through (5) in numerical sequence to 271 27 N m (200 20 lb.ft.).b. Tighten bolts (2) through (5) in numerical sequence to 447 20 N m (330 15 lb.ft.).c. Do Step 2b again to make sure all the bolts are tightened to the correct torque. The tightening sequence in Step 3 is for 3412 engines only.3. Put clean engine oil on all the bolts that hold the rocker shaft assemblies in position and install them on the rocker shaft assemblies. Use the following procedure to tighten the bolts.a. Tighten bolts (6) through (11) in numerical sequence to 270 25 N m (199 18 lb.ft.).b. Tighten bolts (6) through (11) in numerical sequence to 450 20 N m (332 15 lb.ft.).c. Do Step 3b again to make sure all the bolts are tightened to the correct torque. 4. Put clean engine oil on the valve bridge dowels. Install valve bridges (5) in their original position on the engine. Use the following procedure to adjust the bridges.a. Put clean SAE 40 engine oil on the lubrication passage of the bridge.b. Back off the adjusting screw. Press straight down on the top contact surface of the bridge with a force of 40 to 60 N (9 to 13 lb.).c. Turn the adjusting screw clockwise until the oil film in the lubrication passage of the valve bridge moves inward, indicating the adjusting screw has made contact with the valve stem.d. Turn the screw an additional 15° to 25° (1/3 of a flat on the hex nut), to equalizer clearance with the dowel.e. Hold the adjusting screw in this position, and tighten the locknut to a torque of 85 to 115 N m (65 to 85 lb.ft.). 5. Use tool (A) to make sure there will be no pressure against push rod (6) and the rocker arm. Use tool (B) to pull rocker arm away from the push rod. Put push rod (6) in position under the rocker arm. If the rocker arm can not be moved enough to put the push rod in position, turn the crankshaft with tool (A).6. Make an adjustment of the valves to have a clearance of .038 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. See Valve Clearance Setting in Testing And Adjusting.End By:a. install valve coverDisassemble Rocker Shaft Assembly
Start By:a. remove rocker shaft assembly 1. Remove retainer (3), washers (2) and rocker arm (4) from the rocker shaft assembly.2. Make sure dowel (1) is free of oil. 3. Put tooling (A) in position on dowel (1). Pull rocker arm (6) away from bracket assembly (5). Remove the dowel with tooling (A). Remove bracket assembly (5). 4. Remove rocker arms (9), spring (8) and brackets (7). Use tooling (A) to remove the dowel that holds bracket assembly (6) on the rocker shaft. 5. Remove nuts (10) and screws (11) from the rocker arms if a replacement is necessary. 6. Remove plug (12) from rocker shaft (13) if a replacement is necessary.Assemble Rocker Shaft Assembly
Make sure all the parts of the rocker shaft assembly are clean before assembly. 1. Install plug (1) in the end of rocker shaft (2). Install the plug to a depth of 12.7 1 mm (.50 .04 in.) from the end of the shaft.2. Do Step 1 again for the plug in the other end of the shaft. 3. Install screws (4) and nuts (3) on each of the rocker arms. 4. Put the retainer, the original washers and rocker arm (8) in position on the rocker shaft. Put bracket assembly (5) in position on the shaft so the hole in the bracket assembly is in alignment with the larger hole in the shaft.5. Install the dowel that holds the bracket assembly in place.6. Install the remainder of the rocker arms, springs (9) and brackets (6). Push rocker arm (7) to the left of the large hole (10). Install the other bracket assembly. Make sure hole (12) in the bracket assembly is in alignment with hole (10).7. Install dowel (11) through the bracket assembly and into hole (10). 8. Dowel (11) must be installed so that dimension (X) is 12.7 1 mm (.50 .04 in.). 9. Install the last rocker arm (13), the original washers (14) and retainer (15). 10. Use feeler gauge (16) to check the clearance between the rocker arm and the washers. Add or subtract washers, as necessary, until the clearance is 0.3 to 1.4 mm (.012 to .055 in.). Check the clearance at the other end of the rocker shaft assembly.End By:a. install rocker shaft assembly
1. Put rocker shaft assembly (1) in position on the engine. The tightening sequence in Step 2 is for 3408 engines only.2. Put clean engine oil on all the bolts that hold the rocker shaft assembly in position. Install bolts (2), (3), (4) and (5). Use the following procedure to tighten the bolts.a. Tighten bolts (2) through (5) in numerical sequence to 271 27 N m (200 20 lb.ft.).b. Tighten bolts (2) through (5) in numerical sequence to 447 20 N m (330 15 lb.ft.).c. Do Step 2b again to make sure all the bolts are tightened to the correct torque. The tightening sequence in Step 3 is for 3412 engines only.3. Put clean engine oil on all the bolts that hold the rocker shaft assemblies in position and install them on the rocker shaft assemblies. Use the following procedure to tighten the bolts.a. Tighten bolts (6) through (11) in numerical sequence to 270 25 N m (199 18 lb.ft.).b. Tighten bolts (6) through (11) in numerical sequence to 450 20 N m (332 15 lb.ft.).c. Do Step 3b again to make sure all the bolts are tightened to the correct torque. 4. Put clean engine oil on the valve bridge dowels. Install valve bridges (5) in their original position on the engine. Use the following procedure to adjust the bridges.a. Put clean SAE 40 engine oil on the lubrication passage of the bridge.b. Back off the adjusting screw. Press straight down on the top contact surface of the bridge with a force of 40 to 60 N (9 to 13 lb.).c. Turn the adjusting screw clockwise until the oil film in the lubrication passage of the valve bridge moves inward, indicating the adjusting screw has made contact with the valve stem.d. Turn the screw an additional 15° to 25° (1/3 of a flat on the hex nut), to equalizer clearance with the dowel.e. Hold the adjusting screw in this position, and tighten the locknut to a torque of 85 to 115 N m (65 to 85 lb.ft.). 5. Use tool (A) to make sure there will be no pressure against push rod (6) and the rocker arm. Use tool (B) to pull rocker arm away from the push rod. Put push rod (6) in position under the rocker arm. If the rocker arm can not be moved enough to put the push rod in position, turn the crankshaft with tool (A).6. Make an adjustment of the valves to have a clearance of .038 mm (.015 in.) for intake and 0.76 mm (.030 in.) for exhaust. See Valve Clearance Setting in Testing And Adjusting.End By:a. install valve coverDisassemble Rocker Shaft Assembly
Start By:a. remove rocker shaft assembly 1. Remove retainer (3), washers (2) and rocker arm (4) from the rocker shaft assembly.2. Make sure dowel (1) is free of oil. 3. Put tooling (A) in position on dowel (1). Pull rocker arm (6) away from bracket assembly (5). Remove the dowel with tooling (A). Remove bracket assembly (5). 4. Remove rocker arms (9), spring (8) and brackets (7). Use tooling (A) to remove the dowel that holds bracket assembly (6) on the rocker shaft. 5. Remove nuts (10) and screws (11) from the rocker arms if a replacement is necessary. 6. Remove plug (12) from rocker shaft (13) if a replacement is necessary.Assemble Rocker Shaft Assembly
Make sure all the parts of the rocker shaft assembly are clean before assembly. 1. Install plug (1) in the end of rocker shaft (2). Install the plug to a depth of 12.7 1 mm (.50 .04 in.) from the end of the shaft.2. Do Step 1 again for the plug in the other end of the shaft. 3. Install screws (4) and nuts (3) on each of the rocker arms. 4. Put the retainer, the original washers and rocker arm (8) in position on the rocker shaft. Put bracket assembly (5) in position on the shaft so the hole in the bracket assembly is in alignment with the larger hole in the shaft.5. Install the dowel that holds the bracket assembly in place.6. Install the remainder of the rocker arms, springs (9) and brackets (6). Push rocker arm (7) to the left of the large hole (10). Install the other bracket assembly. Make sure hole (12) in the bracket assembly is in alignment with hole (10).7. Install dowel (11) through the bracket assembly and into hole (10). 8. Dowel (11) must be installed so that dimension (X) is 12.7 1 mm (.50 .04 in.). 9. Install the last rocker arm (13), the original washers (14) and retainer (15). 10. Use feeler gauge (16) to check the clearance between the rocker arm and the washers. Add or subtract washers, as necessary, until the clearance is 0.3 to 1.4 mm (.012 to .055 in.). Check the clearance at the other end of the rocker shaft assembly.End By:a. install rocker shaft assembly
Parts wire Suzuki:
36894-95201
36894-95201 WIRE LEAD
DF100, DF100, DF100, DF100A, DF115, DF115, DF115, DF115A, DF115TL, DF140, DF140, DF140, DF140A, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF15, DF15, DF15, DF15S, DF25, DF25Q, DF25Q(QR), DF25T, DF30, DF30Q, DF30Q(QR), DF30T, DF40, DF40, DF40A,
36660-94480
36660-94480 WIRE, SENDER EXT S
DF100, DF100, DF100A, DF115, DF115, DF115A, DF115TL, DF140, DF140, DF140A, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DF60, DF60HL, DF60TL, DF70, DF70THL, DF70TL, DF90, DF90TL, DT115, DT140
36682-92E00
36682-92E00 WIRE, TRIM METER
DF100, DF100, DF100A, DF115, DF115, DF115A, DF115TL, DF140, DF140, DF140A, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF25, DF25Q, DF25Q(QR), DF25T, DF30, DF30Q, DF30Q(QR), DF30T, DF40, DF40, DF40QH, DF40TL, DF50, DF50, DF50QH, DF50TL, DF60, DF6
36620-93J10
36620-93J10 WIRE ASSY, REMOCON EXTENSION
DF100, DF100, DF100, DF100A, DF115, DF115, DF115, DF115A, DF115TL, DF140, DF140, DF140, DF140A, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF150, DF150, DF150, DF150TX, DF150ZX, DF175, DF175, DF175, DF175TX, DF175ZX, DF200, DF200, DF200, DF200T,
36620-93J30
36620-93J30 WIRE ASSY, REMOCON ADAPTER NO.2
DF100, DF100, DF100, DF100A, DF115, DF115, DF115, DF115A, DF115TL, DF140, DF140, DF140, DF140A, DF140T, DF140T, DF140Z, DF140Z, DF140Z, DF140Z, DF150, DF150, DF150, DF150TX, DF150ZX, DF175, DF175, DF175, DF175TX, DF175ZX, DF200, DF200, DF200, DF200T,
36620-93J02
36620-93J02 WIRE ASSY, REMOTE CONTROL
DF100, DF100A, DF115, DF115A, DF140A, DF15, DF150, DF175, DF200, DF225, DF250, DF40A, DF50A, DF60A, DF70A, DF80A, DF9.9, DF90A
36620-93J52
36620-93J52 WIRE ASSY, REMOTE CONTROL
DF100, DF100A, DF115, DF115A, DF140A, DF150, DF175, DF200, DF225, DF250, DF40A, DF50A, DF60A, DF70A, DF80A, DF90A
36620-93J62
36620-93J62 WIRE ASSY, REMOTE CONTROL
DF100, DF100A, DF115, DF115A, DF140A, DF150, DF175, DF200, DF225, DF250, DF40A, DF50A, DF60A, DF70A, DF80A, DF90A