955801 Volvo.Penta Hexagon nut


955801 Hexagon nut Volvo.Penta TD120C, TID120FPP; TID120FG; TD120G Hexagon
955801 Hexagon nut Volvo Penta
Rating:
13

Buy Hexagon nut 955801 Volvo Penta genuine, new aftermarket parts with delivery

You can buy parts:

As an associate, we earn commssions on qualifying purchases through the links below
$60.16
 

23-05-2024
0.0006[0.00] Pounds
Amazon.com
Dorman 955-801 Driver Side Door Mirror Compatible with Select Subaru Models
Dorman Perfect replacement - reverse engineered to look, fit and function exactly like the original door mirror on your vehicle's specific year, make and model || Complete assembly - includes same mirror glass, housing, bracket and technology as the original part that came on the vehicle || Cost-effective and reliable - functions similarly to the original part but is much less expensive than getting a replacement from the dealership or original manufacturer || Easy installation - no special tools or equipment is necessary for installing this new part || Ensure fit - to make sure this part fits your exact vehicle, input your make, model and trim level into the garage tool
Number on catalog scheme: 41
 

Compatible models:

Volvo Penta entire parts catalog list:

TD120C
TID120FPP; TID120FG; TD120G; TD120GG PP; TD120GG

Information:


Illustration 1 g01240921
Schematic for the electrical power supply circuitTest Step 1. Inspect the Electrical Connectors and the Wiring
Remove electrical power from the engine ECM.
Illustration 2 g01183529
J1/P1 ECM connectors (typical left side engine view)
Thoroughly inspect the J1/P1 ECM connectors. Inspect all of the connectors that are in the circuit. Refer to the diagnostic functional test Troubleshooting, "Electrical Connectors - Inspect" for details.
Illustration 3 g01240926
P1 connections for the electrical power supply circuit (P1-52) +Battery (P1-53) +Battery (P1-61) −Battery (P1-63) −Battery (P1-70) Keyswitch
Perform a 45 N (10 lb) pull test on each of the wires in the ECM connector that are associated with the circuit.
Check the allen head screw for each of the ECM connectors for the proper torque. Refer to Troubleshooting, "Electrical Connectors - Inspect" for the correct torque values.
Check the harness and the wiring for abrasion and for pinch points.Expected Result:All connectors, pins, and sockets are completely inserted and coupled. The harness and wiring are free of corrosion, of abrasion, and of pinch points. All connections and grounds are tight and free of corrosion.Results:
OK - The harness and wiring appear to be OK. Proceed to Test Step 2.
Not OK - There is a problem in the connectors and/or wiring.Repair: Repair the connectors or wiring and/or replace the connectors or wiring. Ensure that all of the seals are properly in place and ensure that the connectors are completely coupled. Verify that the repair eliminates the problem.STOPTest Step 2. Check the Battery Voltage at the ECM
Remove electrical power from the engine ECM.
Disconnect the J1/P1 ECM connector.
Restore electrical power to the engine ECM.
Measure the voltage between P1-53 (Unswitched +Battery) and P1-61 (−Battery).
Measure the voltage between P1-52 (Unswitched +Battery) and P1-63 (−Battery).
Measure the voltage between P1-70 (Keyswitch) and P1-63 (−Battery).Expected Result:The measured voltage is between 22 VDC and 27 VDC.Results:
OK - The ECM is receiving the correct voltage.Repair: There may be an intermittent electrical problem in a harness or in a connector. If an intermittent condition is suspected, refer to Troubleshooting, "Electrical Connectors - Inspect".STOP
Unswitched power out of range - The voltage is not correct for one of the unswitched battery circuits at the ECM. Proceed to Test Step 3.
Keyswitch voltage out of range - The voltage is not correct for the keyswitch circuit at the ECM. Proceed to Test Step 4.Test Step 3. Check the Batteries
Measure the no-load battery voltage at the battery posts.
Load test the batteries. Use the 4C-4911 Battery Load Tester. Refer to Special Instruction, SEHS9249, "Use of 4C-4911 Battery Load Tester for 6, 8 and 12 Volt Lead Acid Batteries" and Special Instruction, SEHS7633, "Battery Test Procedure".Expected Result:The batteries pass the load test. The measured voltage is the minimum specification for a 24V system.Results:
OK - The batteries pass the load test.Repair: The batteries are OK. There is an open circuit or excessive resistance in the wiring or connections between the batteries and the ECM. Verify that the 15 Amp circuit breaker for the ECM is not tripped. Verify that the connection at the engine ground stud is clean and tight and that the battery disconnect switch is functioning properly. Repair the connectors or wiring and/or replace the connectors or wiring between the battery and the ECM connector J1/P1.STOP
Not OK - The battery voltage is low or the battery did not pass the load test.Repair: Recharge or replace the faulty batteries. Verify that the repair eliminates the problem.STOPTest Step 4. Check the Voltage from the Keyswitch to the ECM
Remove electrical power from the engine ECM.
Remove the wire from the terminal R of the keyswitch.
Restore electrical power to the engine ECM.
Turn the keyswitch to the ON position.
Measure the voltage on terminal B of the keyswitch to engine ground.
Measure the voltage on terminal R of the keyswitch to engine ground.
Remove electrical power from the engine ECM.Expected Result:Voltage is present on terminal B and terminal R at the keyswitch.Results:
OK - Voltage is present on terminal B and terminal R at the keyswitch. Proceed to Test Step 5.
Not OK - Voltage is not present on terminal B at the keyswitch.Repair: If voltage is not present on terminal B, repair the circuit between the +Battery and the keyswitch. Check the circuit protection for the circuit. Verify that the problem is eliminated.STOP
Not OK - Voltage is not present on terminal R at the keyswitch.Repair: If voltage is present on terminal B of the keyswitch but not present on terminal R, replace the keyswitch. Return all wiring to the original configuration. Verify that the problem is eliminated.STOPTest Step 5. Check the Voltage from the Main Relay to the "ECM Switch Fuse"
Remove the wire 112-PU from the normally open terminal of the main relay.
Turn the keyswitch to the ON position.
Measure the voltage between the normally open terminal of the main relay and engine ground.
Turn the keyswitch to the OFF position.
Reconnect all wires to the original configuration.Expected Result:The voltage measures 24 3.0 VDC.Results:
OK - The voltage measures 24 3.0 VDC.Repair: Verify that the "ECM Switch Fuse" is not blown. Repair the wire between the main relay and the fuse for the engine control or repair the wire between the fuse for the engine control and the ECM connector P1.STOP
Not OK - The voltage does not measure 24 3.0 VDC. Proceed to Test Step 6.Test Step 6. Check the Voltage at the Main Relay
Remove the wire 308-YL from the coil of the main relay.
Remove the wire 101-RD from the normally open contact of the main relay.
Turn the keyswitch to the ON position.
Measure the voltage between wire 308-YL and engine ground.
Measure the voltage between wire 101-RD and engine ground.
Reconnect all wires


Parts hexagon Volvo Penta:

940162
Hexagon screw
940162 Hexagon screw
430; 430A; 430B, 500; 500A; 501A, 571A, AQ115A; AQ115B; AQ130, AQ175A, AQ190A; AQ240A, AQ200B; AQ225B, AQ200C; AQ200D; AQ225C, AQ200D; AQ200F; 280B, AQ205A; AQ205LB, AQ211A; DP-A; SP-A, AQ225D; AQ225E; AQ225F, AQ231A; AQ231B; AQ231LB, AQ260A; AQ260B;
955536
Hexagon screw
955536 Hexagon screw
430; 430A; 430B, 500; 500A; 501A, 571A, 740A; BB740A, AQ115A; AQ115B; AQ130, AQ175A, AQ200B; AQ225B, AQ200C; AQ200D; AQ225C, AQ200D; AQ200F; 280B, AQ205A; AQ205LB, AQ211A; DP-A; SP-A, AQ225D; AQ225E; AQ225F, AQ231A; AQ231B; AQ231LB, AQ260A; AQ260B; B
955269
 
955269 Hexagon screw
2001; 2001B; 2001AG, AD30A; AQAD30A; MD30A, AQ115A; AQ115B; AQ130, D100A; D100AK; D100B, D100BHC; D100BRC; TD100AHC, D120A; D120AK; TD120A, D13B-A MP; D13B-B MP; D13B-C MP, D5A-T; D5A-TA; D5A-B TA, D70B; D70B PP; D70B K, D70CHC; D70CRC; TD70CHC, MB2,
955523
Hexagon screw
955523 Hexagon screw
2001; 2001B; 2001AG, 430; 430A; 430B, 500; 500A; 501A, 571A, 740A; BB740A, AQ115A; AQ115B; AQ130, AQ120B; AQ125A; AQ140A, AQ125B, AQ131A; AQ131B; AQ131C, AQ145A; BB145A, AQ145B, AQ151A; AQ151B; AQ151C, AQ175A, AQ200B; AQ225B, AQ200C; AQ200D; AQ225C,
955779
 
955779 Hexagon nut
2001; 2001B; 2001AG, 230A; 230B; 250A, 251A, 430; 430A; 430B, 500; 500A; 501A, 571A, 740A; BB740A, AD30A; AQAD30A; MD30A, AD31D; AD31D-A; AD31XD, AD31L-A; AD31P-A; AD41L-A, AD41D; D41D; TAMD41D, AQ115A; AQ115B; AQ130, AQ120B; AQ125A; AQ140A, AQ125B,
955270
 
955270 Hexagon screw
2001; 2001B; 2001AG, 430; 430A; 430B, 500; 500A; 501A, AD30A; AQAD30A; MD30A, AD31D; AD31D-A; AD31XD, AD31L-A; AD31P-A; AD41L-A, AD41D; D41D; TAMD41D, AQ115A; AQ115B; AQ130, AQ120B; AQ125A; AQ140A, AQ125B, AQ131A; AQ131B; AQ131C, AQ145A; BB145A, AQ14
940134
 
940134 Hexagon screw
430; 430A; 430B, 5.0GXi-A; 5.7Gi-A; 5.7GXi-A, 5.0GXi-B; 5.0GXi-BF; 5.0OSi-B, 5.7Gi-C; 5.7Gi-CF; 5.7Gi-D, 500; 500A; 501A, 7.4GLPHUS; 7.4GIPHUSCE; 7.4GSIXHUS, 7.4GLPMDA; 7.4GLPMDM; 8.2GLPMDA, 7.4GLPNCA; 7.4GLPNCS; 7.4GLPNCM, 740A; BB740A, 8.1Gi-A; 8.1
940092
Hexagon nut
940092 Hexagon nut
230A; 230B; 250A, AD30A; AQAD30A; MD30A, AQ115A; AQ115B; AQ130, AQ120B; AQ125A; AQ140A, AQ125B, AQ131A; AQ131B; AQ131C, AQ145A; BB145A, AQ175A, AQ190A; AQ240A, AQ200B; AQ225B, AQ200C; AQ200D; AQ225C, AQ200D; AQ200F; 280B, AQ225D; AQ225E; AQ225F, AQ23
Back to top