22504281 Volvo.Penta Pipe set


22504281 Pipe set Volvo.Penta TAD840VE; TAD841VE; TAD842VE Pipe
22504281 Pipe set Volvo Penta
Rating:
73

Buy Pipe set 22504281 Volvo Penta genuine, new aftermarket parts with delivery
Number on catalog scheme: 11
 

Compatible models:

Volvo Penta entire parts catalog list:

TAD840VE; TAD841VE; TAD842VE; TAD843VE; TAD852VE; TAD851VE; TAD853VE; TAD850-52VE; TAD840-43VE

Information:


Be sure to remove the piston cooling tubes before removal of the pistons and connecting rods. Damage to the piston cooling tubes can cause the oil spray to be out of alignment and piston seizure will be the result.
1. Remove the carbon from the top inside surface of the cylinder liners.2. Turn the crankshaft until two pistons are at bottom center. 3. Remove bearing caps (1) from the two connecting rods. Put pieces of rubber hose or tape on the threads of the connecting rod bolts as protection for the crankshaft. 4. Push the pistons up until the piston rings are clear of the cylinder liner. Remove pistons (2). Keep each cap with its connecting rod.
Do not turn the crankshaft while any of the connecting rods are in the engine without the caps installed.
5. Do Steps 1 through 4 for the remainder of the pistons.Install Pistons
1. Put clean engine oil on the piston rings, connecting rod bearings and cylinder liners. 2. Put two pistons in position opposite of each other in the correct bore of the block. Install pistons (1) with tool (A).
Make sure that the pistons are installed with flat surfaces (2) of the connecting rods toward each other and the chamfered sides (4) toward the crankshaft.
For more detail about the installation of connecting rod bearings see REMOVE AND INSTALL CONNECTING ROD BEARINGS.3. Check the bearing clearances with Plastigage.4. Put clean engine oil on bolts (5). Install caps (3) and nuts finger tight. Tighten each nut to a torque of 60 6 lb.ft. (80 8 N m). Put a mark across the nuts and bolts. Tighten each nut 120° more.5. Check the side clearance between two connecting rods on the same crankshaft journal. Clearance must be .003 to .033 in. (0.076 to 0.838 mm) for new rods.6. Do Steps 1 through 5 for the remainder of the pistons.end by:a) install oil pumpb) install cylinder headsDisassemble And Assemble Pistons
start by:a) remove pistons1. Remove the bearings from the connecting rod and connecting rod cap. 2. Remove retainer ring (1) with tool (C).3. Remove pin (2) and the connecting rod (4) from the piston (3). 4. Remove the piston rings from the piston with tool (A). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See USE OF PISTON PIN BEARING REMOVAL AND INSTALLATION TOOLS, SPECIAL INSTRUCTION, Form No. SMHS7295.5. Heat the connecting rod in an oven to a temperature of 350°-500°F (177°-260°C). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (B). Put a new rod pin bearing (5) on the adapter part of tooling (B). Make sure that the joint in the rod pin bearing is 90° from a center line through the crankshaft and pin bearing bores. 7. Install the pusher adapter (7) and pusher (8) part of tooling (B) on the adapter. The old bearing is pushed out by tooling (B) as the new bearing is installed.8. Use tooling (B) to push the new bearing into the connecting rod until the push adapter of tooling (B) makes full contact with the connecting rod surface.9. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 2.0012 .0003 in. (50.830 0.008 mm).10. Check the clearance between the ends of the piston rings. See PISTONS AND RINGS in SPECIFICATIONS.11. Install the oil ring spring in the oil ring groove of the piston. The oil ring is to be installed over the spring with the oil ring end gap 180° from the oil ring spring joint. 12. Install the oil ring on the piston with tool (A).13. Install the second (intermediate) piston ring with the side that has the identification "UP-2" toward the top of the piston with tool (A).14. Install the first (top) piston ring with the side that has the identification "UP-1" toward the top of the piston with tool (A). After the installation of all three piston rings, put the piston ring in position so the end gaps are 120° apart. 15. Put piston (3) in position on connecting rod (4). Put clean engine oil on pin (2) and install the pin. Install retainer rings (1) with tool (C). Make sure the retainer rings are in the grooves of the piston.16. Install the bearings in the connecting rod and connecting rod cap.end by:a) install pistons


Parts pipe Volvo Penta:

21523327
Pipe
21523327 Pipe
1372, D13B-A MP; D13B-B MP; D13B-C MP, D13B-E MH; D13B-E MH (FE); D13B-N MH, D13B-F MG; D13B-E MG; D13B-E MG (FE), D13C1-A MP; D13C2-A MP; D13C3-A MP, D16C-A MG, D16C-D MH, D9A2A; D9A2A D9-425; D9A2A D9-500, D9A2A; D9A2A MG; D9A2A D9A-MG, TAD1140VE;
22203592
 
22203592 Pipe
TAD540-42VE; TAD550-51VE; TAD540VE, TAD570VE; TAD571VE; TAD572VE, TAD840VE; TAD841VE; TAD842VE, TAD870VE; TAD871VE; TAD872VE
21169201
 
21169201 Pipe elbow
TAD540-42VE; TAD550-51VE; TAD540VE, TAD570VE; TAD571VE; TAD572VE, TAD840VE; TAD841VE; TAD842VE, TAD870VE; TAD871VE; TAD872VE
22647673
 
22647673 Pipe elbow, pipe elbow
TAD540-42VE; TAD550-51VE; TAD540VE, TAD570VE; TAD571VE; TAD572VE, TAD840VE; TAD841VE; TAD842VE, TAD870VE; TAD871VE; TAD872VE
22504276
 
22504276 Pipe
TAD840VE; TAD841VE; TAD842VE
21601974
 
21601974 Pipe
TAD840VE; TAD841VE; TAD842VE
22791842
 
22791842 Pipe
TAD840VE; TAD841VE; TAD842VE, TAD870VE; TAD871VE; TAD872VE
21976336
 
21976336 Pipe
TAD840VE; TAD841VE; TAD842VE, TAD870VE; TAD871VE; TAD872VE
Back to top