21061009 Sealing ring Volvo.Penta
TAD550GE; TAD551GE; TAD750GE, TAD750VE; TAD760VE
Sealing
Price: query
Rating:
Compatible models:
TAD550GE; TAD551GE; TAD750GE
TAD750VE; TAD760VE
Volvo.Penta
Volvo Penta entire parts catalog list:
- Common Rail System » 21061009
- Common Rail System
Information:
2. Turn the crankshaft until two pistons are at bottom center. Remove connecting rod caps (1) from the two connecting rods.3. Put rubber hose or tape over the threads of the connecting rod bolts. This will prevent damage to the crankshaft when the pistons are removed.
Do not let the connecting rods hit the bottom of the cylinder liner or crankshaft when the pistons are removed or installed.
4. Push the piston and connecting rod away from the crankshaft until the piston rings are above the cylinder liner. Remove the two pistons (2) and connecting rods from the engine.5. Keep each connecting rod cap with its respective connecting rod and piston. Put identification on each connecting rod as to its location in the engine.6. Do Steps 2 through 5 for the removal of the other pistons.Install Pistons
1. Turn the crankshaft until the bearing journals for the pistons to be installed are at bottom center.2. Put clean engine oil on the crankshaft journals and on the inside of the cylinder liners. Put clean engine oil on the piston rings and connecting rod bearings.3. Move the piston rings on the piston until the ring openings are approximately 90° apart.
Never install tool (A) (the ring compressor) without the use of the cylinder liner as a guide. Damage to the piston rings can be the result.
4. Put tool (A) in position on the cylinder liner as shown. Put the connecting rod and piston in the same cylinder liner from which it was removed and into the ring compressor. Make sure the 'V' mark on the piston is in alignment with the 'V' mark on the cylinder block.5. Push the piston into position while the connecting rod is put into position over the crankshaft. 6. Put clean engine oil on bearings, bolt threads and surfaces of the nuts that make contact with the connecting rod caps. Put caps (1) in position on the connecting rods and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 90° more.
When the connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
7. Follow Steps 1 through 6 for the installation of the other pistons. end by:a) install oil pumpb) install oil pan platec) install cylinder headDisassemble Pistons
start by:a) remove pistons 1. Remove the rings from the pistons with tool (A). 2. Remove retaining ring (3), piston pin (1) and connecting rod (2) from the piston.3. Clean the piston ring grooves on the old piston with an acceptable ring groove tool.4. See USE OF PISTON PIN BEARING REMOVAL AND INSTALLATION TOOLS, SPECIAL INSTRUCTIONS, Form No. SMHS7295-02 for more information about removal and installation of piston pin bearings. Be sure to remove the bearings from the crankshaft end of connecting rod.5. Heat the connecting rod in an oven to a temperature of 176° - 260°C (350° - 500°F). Never use a direct flame to heat a connecting rod.6. Put 6V3029 Spacer (11) in the base plate. Put the connecting rod on the base plate of tooling (B). 7. Put the connecting rod piston pin bearing end in the center of the port assembly of tooling (B). Install pin (6) in the center of the bore for the connecting rod bearing.8. Install 6V2049 Adapter (9). Put the hole in the adapter in alignment with the hole in the base plate of tooling (B).9. Install clamp bar (10) and clamp pin (7). The old bearing is pushed out by tooling (B) as the new bearing is installed.10. Put 5P8645 Pusher Adapter (8) in position as shown with the taper side down. The piston pin bearing joint must be in alignment with the hole in adapter (9) and the base plate of tooling (B).11. Put pusher (4) on adapter (8).12. Use tooling (B) to push the new piston pin bearing into the connecting rod until adapter (8) of tooling (B) makes full contact with the connecting rod surface.13. Remove the connecting rod and the old piston pin bearing from tooling (B).14. Check the piston pin bearing bore diameter after the bearing is installed. The correct dimension is 43.210 0.0076 mm (1.7012 0.00030 in.). The maximum permissible clearance between the bearing and piston pin (worn) must not be more than 0.08 mm (.003 in.).Assemble Pistons
1. When old pistons are used, clean the piston grooves with tool (B). 2. Put connecting rod (2) in position in the piston with bearing tab groove (3) and number identification on the same side as the "V" mark on the top of the piston.3. Install piston pin (1) and retaining ring (4).4. For correct piston and ring clearances, see PISTONS AND RINGS in SPECIFICATIONS.5. Install the oil ring spring in the oil ring groove of the piston. The oil ring must be installed on the piston with the ring end gap 180° from the oil ring spring joint. 6. Install the oil ring on the piston with tool (A).7. Install the intermediate piston ring with the side that has the mark "UP-2" toward the top of the piston with tool (A).8. Install the top piston ring with the side that has the mark "UP-1" toward the top of the piston. Make sure piston ring end gaps are 90° apart before the pistons are installed. end by:a) install pistons
Do not let the connecting rods hit the bottom of the cylinder liner or crankshaft when the pistons are removed or installed.
4. Push the piston and connecting rod away from the crankshaft until the piston rings are above the cylinder liner. Remove the two pistons (2) and connecting rods from the engine.5. Keep each connecting rod cap with its respective connecting rod and piston. Put identification on each connecting rod as to its location in the engine.6. Do Steps 2 through 5 for the removal of the other pistons.Install Pistons
1. Turn the crankshaft until the bearing journals for the pistons to be installed are at bottom center.2. Put clean engine oil on the crankshaft journals and on the inside of the cylinder liners. Put clean engine oil on the piston rings and connecting rod bearings.3. Move the piston rings on the piston until the ring openings are approximately 90° apart.
Never install tool (A) (the ring compressor) without the use of the cylinder liner as a guide. Damage to the piston rings can be the result.
4. Put tool (A) in position on the cylinder liner as shown. Put the connecting rod and piston in the same cylinder liner from which it was removed and into the ring compressor. Make sure the 'V' mark on the piston is in alignment with the 'V' mark on the cylinder block.5. Push the piston into position while the connecting rod is put into position over the crankshaft. 6. Put clean engine oil on bearings, bolt threads and surfaces of the nuts that make contact with the connecting rod caps. Put caps (1) in position on the connecting rods and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 90° more.
When the connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
7. Follow Steps 1 through 6 for the installation of the other pistons. end by:a) install oil pumpb) install oil pan platec) install cylinder headDisassemble Pistons
start by:a) remove pistons 1. Remove the rings from the pistons with tool (A). 2. Remove retaining ring (3), piston pin (1) and connecting rod (2) from the piston.3. Clean the piston ring grooves on the old piston with an acceptable ring groove tool.4. See USE OF PISTON PIN BEARING REMOVAL AND INSTALLATION TOOLS, SPECIAL INSTRUCTIONS, Form No. SMHS7295-02 for more information about removal and installation of piston pin bearings. Be sure to remove the bearings from the crankshaft end of connecting rod.5. Heat the connecting rod in an oven to a temperature of 176° - 260°C (350° - 500°F). Never use a direct flame to heat a connecting rod.6. Put 6V3029 Spacer (11) in the base plate. Put the connecting rod on the base plate of tooling (B). 7. Put the connecting rod piston pin bearing end in the center of the port assembly of tooling (B). Install pin (6) in the center of the bore for the connecting rod bearing.8. Install 6V2049 Adapter (9). Put the hole in the adapter in alignment with the hole in the base plate of tooling (B).9. Install clamp bar (10) and clamp pin (7). The old bearing is pushed out by tooling (B) as the new bearing is installed.10. Put 5P8645 Pusher Adapter (8) in position as shown with the taper side down. The piston pin bearing joint must be in alignment with the hole in adapter (9) and the base plate of tooling (B).11. Put pusher (4) on adapter (8).12. Use tooling (B) to push the new piston pin bearing into the connecting rod until adapter (8) of tooling (B) makes full contact with the connecting rod surface.13. Remove the connecting rod and the old piston pin bearing from tooling (B).14. Check the piston pin bearing bore diameter after the bearing is installed. The correct dimension is 43.210 0.0076 mm (1.7012 0.00030 in.). The maximum permissible clearance between the bearing and piston pin (worn) must not be more than 0.08 mm (.003 in.).Assemble Pistons
1. When old pistons are used, clean the piston grooves with tool (B). 2. Put connecting rod (2) in position in the piston with bearing tab groove (3) and number identification on the same side as the "V" mark on the top of the piston.3. Install piston pin (1) and retaining ring (4).4. For correct piston and ring clearances, see PISTONS AND RINGS in SPECIFICATIONS.5. Install the oil ring spring in the oil ring groove of the piston. The oil ring must be installed on the piston with the ring end gap 180° from the oil ring spring joint. 6. Install the oil ring on the piston with tool (A).7. Install the intermediate piston ring with the side that has the mark "UP-2" toward the top of the piston with tool (A).8. Install the top piston ring with the side that has the mark "UP-1" toward the top of the piston. Make sure piston ring end gaps are 90° apart before the pistons are installed. end by:a) install pistons
Parts sealing Volvo Penta:
20405769
20405769 Sealing ring
D5A-T; D5A-TA; D5A-B TA, D5A-T; D5A-TA; D5A-B TA, TAD520GE; TAD720GE; TAD721GE, TAD520VE; TAD720VE; TAD721VE, TAD550GE; TAD551GE; TAD750GE, TD420VE; TAD420VE; TAD620VE, TD520GE; TAD530GE; TAD531GE, TD520VE; TD720VE
21108673
21108673 Sealing ring
D5A-T; D5A-TA; D5A-B TA, D5A-T; D5A-TA; D5A-B TA, TAD520GE; TAD720GE; TAD721GE, TAD520VE; TAD720VE; TAD721VE, TAD550GE; TAD551GE; TAD750GE, TAD650VE; TAD660VE, TAD734GE, TAD750VE; TAD760VE, TD420VE; TAD420VE; TAD620VE, TD520GE; TAD530GE; TAD531GE, TD
20405569
20405569 Sealing ring
D5A-T; D5A-TA; D5A-B TA, D5A-T; D5A-TA; D5A-B TA, TAD520GE; TAD720GE; TAD721GE, TAD520VE; TAD720VE; TAD721VE, TAD550GE; TAD551GE; TAD750GE, TAD750VE; TAD760VE, TD520GE; TAD530GE; TAD531GE, TD520VE; TD720VE
20459961
20459961 Sealing ring
D5A-T; D5A-TA; D5A-B TA, D5A-T; D5A-TA; D5A-B TA, TAD520GE; TAD720GE; TAD721GE, TAD520VE; TAD720VE; TAD721VE, TAD550GE; TAD551GE; TAD750GE, TAD650VE; TAD660VE, TAD750VE; TAD760VE, TD420VE; TAD420VE; TAD620VE, TD520GE; TAD530GE; TAD531GE
20460026
20460026 Sealing ring
TAD520GE; TAD720GE; TAD721GE, TAD650VE; TAD660VE, TAD734GE, TAD750VE; TAD760VE, TD420VE; TAD420VE; TAD620VE, TD520GE; TAD530GE; TAD531GE
21034305
20921906
20921906 Sealing ring
TAD550GE; TAD551GE; TAD750GE, TAD560VE; TAD561VE; TAD761VE, TAD650VE; TAD660VE, TAD750VE; TAD760VE
21075389