F405457 PIVOT SCREW Force
H0356H75F, H0407E92C, H0456B78J, H0456B79K, H0456B80L, H0457H82N, H0457H83P, H0503B83A, H0503H84B, H0504H88C, H0504H88D, H0504P89B, H0505C89B, H0507A89C, H0507A89D, H0507A90A, H0507A90B, H0507A90C, H0507A90D, H0507A91A, H0507A91C, H0507A92A, H0507B85
PIVOT
Price: query
Rating:
Compatible models:
H0356H75F
H0407E92C
H0456B78J
H0456B79K
H0456B80L
H0457H82N
H0457H83P
H0503B83A
H0503H84B
H0504H88C
H0504H88D
H0504P89B
H0505C89B
H0507A89C
H0507A89D
H0507A90A
H0507A90B
H0507A90C
H0507A90D
H0507A91A
H0507A91C
H0507A92A
H0507B85A
H0507C86A
H0507C87A
H0507C87C
H0507C88B
H0507E91B
H0507F87B
H0507F88A
H0507H81A
H0507H82B
H0507Z89B
H0555H74G
H0706A91B
H0856F85A
H085LD89A
H085LD89B
H085LD89C
H0903E91D
H0903E91H
H0903F91A
H0903F91C
H0906R83D
H090LD90A
H090LD90B
H090LD90C
H090LD91D
H1000H79A
H1004H79A
H1006B80B
H1006B81C
H1007H79A
H1008H80A
H1008H83C
H1057B78H
H1058H82G
H1058V83H
H1059H76D
H1059H77G
H1151H79A
H1154B79A
H1155H79A
H1156H80C
H1156H81D
H1157B79B
H1157H78A
H1158B82E
H1158H80D
H1158H84G
H1159H77A
H1159H78B
H1159H79C
H1201A90A
H1209H76F
H120LD90A
H120LD90B
H120LD90C
H120LD91B
H120LD91D
H120LD92B
H1251A88A
H1251A88B
H1251A88C
H1251A89A
H1251A89B
H1251A89C
H1251A89D
H1251A89E
H1251F84A
H1251F86A
H1251F87A
H1251F87B
H1251X85A
H1258H81A
H125LD89A
H125LD89B
H1400H79A
H1401H79A
H1405H79A
H1406H80C
H1406H81D
H1407B79B
H1407H78A
H1408B80C
H1408H82D
H1408H83E
H1409H79B
H1501E89A
Force
Force entire parts catalog list:
- POWER HEAD » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- SHIFT AND THROTTLE COMPONENTS » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- SHIFT AND THROTTLE LINKAGE » F405457
- POWER HEAD » F405457
- TOWERSHAFT ASSEMBLY (91B THRU 92C ) » F405457
- GEAR SHIFT LINKAGE » F405457
- POWERHEAD » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- GEAR SHIFT LINKAGE » F405457
- TOWERSHAFT AND THROTTLE LINKAGE 91E THRU 92C E000001,E009499 » F405457
- GEAR SHIFT LINKAGE 91E THRU 92C E000001,E009499 » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- GEAR SHIFT LINKAGE » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- GEAR SHIFT LINKAGE » F405457
- POWER HEAD » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- TOWERSHAFT AND THROTTLE LINKAGE (90A,92C) » F405457
- GEAR SHIFT LINKAGE (90A,92C) » F405457
- POWER HEAD » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- POWER HEAD » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
- U-JOINT AND HOUSING » F405457
- TOWERSHAFT AND THROTTLE LINKAGE » F405457
Information:
Illustration 1 g00671263
SchematicTest Step 1. Check for Connector Damage.
Turn the circuit breaker for the battery to the OFF position.
Turn the keyswitch to the OFF/RESET position.
Thoroughly inspect ECM connector J1/P1, ECM connector J2/P2, machine connector J3/P3, and power shift solenoid connector J113/P113. Refer to Troubleshooting, "Inspecting Electrical Connectors" for details.
Perform a 45 N (10 lb) pull test on each of the wires in the ECM connector that are associated with the circuit.
Check the ECM connector (allen head screw) for the proper torque of 6.0 N m (55 lb in).
Check the customer connector (allen head screw) for the proper torque of 2.25 0.25 N m (20 2 lb in).
Check the harness and the wiring for abrasion and pinch points.Expected Result:All connectors, pins, and sockets should be completely inserted and coupled. The harness and wiring should be free of corrosion, abrasion, and pinch points. All connections and grounds should be tight and free of corrosion.Results:
OK - All connectors, pins, and sockets are completely inserted and coupled. The harness and wiring are free of corrosion, abrasion, and pinch points. All connections and grounds are tight and free of corrosion. Proceed to Test Step 2.
Not OK - Repair: Repair the connectors or wiring and/or replace the connectors or wiring. Ensure that all of the seals are properly in place and that the connectors are completely coupled.Verify that the repair eliminates the problem. Stop.Test Step 2. Check the Solenoid for an Internal Short or Open.
Disconnect power shift solenoid connector J113/P113.
Measure the resistance between P113-1 and P113-2.Expected Result:The resistance should be between 7 Ohms and 17 Ohms.Results:
OK - The resistance is between 7 Ohms and 17 Ohms. Proceed to Test Step 3.
Not OK - The resistance is not between 7 Ohms and 17 Ohms. The solenoid is faulty.Repair: Replace the solenoid.Verify that the repair eliminates the problem. Stop.Test Step 3. Check the Resistance through the Harness.
Disconnect ECM connector J2/P2.
Use a suitable piece of wire to short P2-13 (Power Shift Solenoid) to P2-7 (Solenoid Return).
Measure the resistance between J113-1 and J113-2.
Remove the wire short.Expected Result:The resistance should be less than 10 Ohms.Results:
OK - The resistance is less than 10 Ohms. Proceed to Test Step 4.
Not OK - The resistance is greater than 10 Ohms. There is an open circuit or there is excessive resistance in the harness.Repair: Repair the circuit.Verify that the repair eliminates the problem. Stop.Test Step 4. Check for Shorts in the Harness.
Turn the keyswitch to the OFF/RESET position.
Disconnect ECM connector J2/P2 and power shift solenoid connector J113/P113.
Measure the resistance between engine ground and each terminal of power shift solenoid connector J113.
Measure the resistance between both terminals of power shift solenoid connector J113.Expected Result:The resistance should be greater than 20,000 Ohms for each reading.Results:
OK - The resistance is greater than 20,000 Ohms for each reading. Proceed to Test Step 5.
Not OK - The resistance is less than 20,000 Ohms for each reading. There is a short in the harness between the ECM and the power shift solenoid.Repair: Repair the circuit.Verify that the repair eliminates the problem. Stop.Test Step 5. Check the Voltage for the Solenoid at the ECM.
Reconnect all connectors.
Connect ET to the service tool connector.
Start the engine.
Ensure that the keyswitch is in the ON position.
Check for any Active Diagnostic Codes.Expected Result:The following diagnostics should not be active:
581-05 "Power Shift Solenoid open circuit"
581-06 "Power Shift Solenoid short to ground"Results:
OK - The solenoid and the harness are OK.Repair: If the system does not function properly refer to Troubleshooting, "Unstable Hydraulic Function". Stop.
Not OK - The ECM is faulty.Repair: Replace the ECM. Refer to Troubleshooting, "Replacing the ECM".Verify that the repair eliminates the problem. Stop.
Parts pivot Force:
F328692
F695422
F695422 PIVOT, BALL
H085LD89A, H085LD89B, H085LD89C, H090LD90A, H090LD90B, H090LD90C, H090LD91D, H120LD90A, H120LD90B, H120LD90C, H120LD91B, H120LD91D, H120LD92B, H125LD89A, H125LD89B
F405407